ROADWORKS SUMMARY
Charleton Way, MORPETH, NE65 7EE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Charleton Way, NE65 7EE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Charleton Way, MORPETH, NE65 7EE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Charleton Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Powergrid (Northeast) logo
Until
1 Oct 2026
Details
View Map
Share
Follow
High Street

Northern Powergrid (Northeast) are carrying out Utility asset works on High Street, Rothbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:15 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Sep 2026 at 09:16.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Church Street, Longframlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jun 2026 at 08:48.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Northumbrian Water are carrying out Utility repair and maintenance works on Church Street, Longframlington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 09:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Sep 2026 at 09:05.

Northumbrian Water logo
LONG TERM
Between
26 Oct 2026 and 30 Apr 2027
Details
View Map
Share
C106 Longframlington To Alnwick Fords

Northumbrian Water were proposing to carry out Utility repair and maintenance works on C106 Longframlington To Alnwick Fords, Longframlington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 30 April 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 18 Sep 2026 at 08:05.

Northumbrian Water logo
LONG TERM
Between
26 Oct 2026 and 5 Mar 2027
Details
View Map
Share
C106 Longframlington To Alnwick Fords

Northumbrian Water were proposing to carry out Utility repair and maintenance works on C106 Longframlington To Alnwick Fords, Longframlington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 5 March 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 18 Sep 2026 at 08:14.

Between
2 and 28 Nov 2026
Details
View Map
Share
Follow
B6344 Cragside To Weldon Junction

Northumberland County Council are proposing to carry out Highway improvement works on B6344 Cragside To Weldon Junction, Longframlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 24 Aug 2026 at 12:21.

BT logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
U4061 Allerdean Junction To Tosson

BT are proposing to carry out Utility asset works on U4061 Allerdean Junction To Tosson, Rothbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2026 at 14:41.

BT logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Carterside Road

BT are proposing to carry out Utility asset works on Carterside Road, Newtown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2026 at 14:40.

BT logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
U4061 Allerdean Junction To Tosson

BT were proposing to carry out Utility asset works on U4061 Allerdean Junction To Tosson, Rothbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 4 December 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Sep 2026 at 15:10.

BT logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Carterside Road

BT were proposing to carry out Utility asset works on Carterside Road, Newtown.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 4 December 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Sep 2026 at 15:10.


Roadworks Map near to Charleton Way, MORPETH, NE65 7EE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2026 09:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Charleton Way, MORPETH, NE65 7EE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Northeast) logo
WELLSTRAND 
(0.7 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 21 Sep 2026 - 1 Oct 2026
0.7
Details
Share
Follow
2
Northern Powergrid (Northeast) logo
MAJOR
  
HIGH STREET 
(0.7 miles)
Northern Powergrid (Northeast)
Utility asset works - Carriageway - Two-way signals
In Progress
Since: 14 Sep 2026 09:15
(Scheduled: 14 Sep 2026 - 1 Oct 2026)
0.7
Details
Share
Follow
3
Northumbrian Water logo
HILLSIDE 
(0.8 miles)
Northumbrian Water
Utility repair and maintenance works - Verge - Give and take
Planned
Scheduled: 17 Sep 2026 - 23 Sep 2026
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.