ROADWORKS SUMMARY
Ariel Street, ASHINGTON, NE63 9NG
Introduction
View current and future planned roadworks and road closures for Ariel Street, NE63 9NG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ariel Street, ASHINGTON, NE63 9NG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ariel Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Sep 2024 and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Albion Way Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 30 September 2024 and could run through until 7 February 2025. The works will impact the footway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 1 Jul 2024 at 10:16.
13 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Albion Way Footway, Blyth.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 4 October 2024 at 14:30 and could run through until 13 February 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 14:31.
Today
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Briardene, Ashington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 12:50.
21 Mar 2025
Northumberland County Council are carrying out Works for Rail Purposes on Chase Farm Drive, Blyth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 09:36.
3 Nov 2024 and 25 Apr 2025
Northumberland County Council are proposing to carry out Works for Rail Purposes on Front Street, Bebside.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 24 Oct 2024 at 10:42.
3 Nov 2024 and 25 Apr 2025
Northumberland County Council were proposing to carry out Works for Rail Purposes on Front Street, Bebside.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 21 Nov 2024 at 12:19.
16 Nov 2024 and 21 Mar 2025
Northumberland County Council were proposing to carry out Works for road purposes on Bridge Street, Blyth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 23 Oct 2024 at 08:33.
18 Nov 2024 and 24 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Netherton Lane, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:38.
18 Nov 2024 and 24 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Netherton Lane, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 8 Oct 2024 at 10:20.
18 Nov 2024 and 24 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Netherton Road, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:32.
24 Mar 2025
Northumberland County Council are carrying out Works for road purposes on Netherton Road, Bedlington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 5 Dec 2024 at 10:05.
18 Nov 2024 and 24 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Hazelmere Avenue, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:39.
18 Nov 2024 and 24 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Hazelmere Avenue, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 8 Oct 2024 at 10:21.
Today
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Ryal Close Footway, Blyth.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 14:18.
30 Nov 2024 and 21 Mar 2025
Northumberland County Council were proposing to carry out Works for road purposes on Percy Street, Blyth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 23 Oct 2024 at 08:34.
30 Nov 2024 and 21 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Bridge Street, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 17 Sep 2024 at 14:09.
21 Mar 2025
Northumberland County Council are carrying out Works for road purposes on Bridge Street, Blyth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 11:19.
30 Nov 2024 and 21 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Percy Street, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 17 Sep 2024 at 14:10.
21 Mar 2025
Northumberland County Council are carrying out Works for road purposes on Percy Street, Blyth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 11:17.
13 Mar 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 11:18 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 09:41.
6 Dec 2024 and 13 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 11:18.
9 Dec 2024 and 14 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 09:24.
9 Dec 2024 and 14 Mar 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 6 Dec 2024 at 07:56.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Craster Close Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 1 Jul 2024 at 17:19.
Today
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Craster Close Footway, Blyth.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:50.
6 Jan and 30 May 2025
Northumberland County Council are proposing to carry out Works for road purposes on Front Street, Bebside.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 11:05.
6 Jan and 28 Mar 2025
Northumberland County Council were proposing to carry out Highway improvement works on North Seaton Road, Ashington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 15 Jan 2025 at 10:48.
30 May 2025
Northumberland County Council are carrying out Works for Rail Purposes on Furnace Road, Bebside.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 09:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 9 Jan 2025 at 12:09.
7 Jan and 30 May 2025
Northumberland County Council are proposing to carry out Works for Rail Purposes on Furnace Road, Bebside.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 8 Jan 2025 at 12:24.
30 May 2025
Northumberland County Council are carrying out Works for road purposes on Front Street, Bebside.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 09:10 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 7 Jan 2025 at 09:46.
7 Jan and 23 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 23 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:18.
8 Jan and 30 May 2025
Northumberland County Council were proposing to carry out Works for road purposes on Furnace Road, Bebside.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 8 Jan 2025 at 11:47.
13 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Footway Outside 3-7 Bothal Close, Blyth.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:52.
13 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Ryal Close Bothal Close Footway, Blyth.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:51.
13 Jan and 24 Feb 2025
Northumberland County Council were proposing to carry out Works for road purposes on Bridge Street, Blyth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 9 Jan 2025 at 08:41.
13 Jan and 4 Apr 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 10:54.
20 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Temple Avenue, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:06.
Today
Northern Gas Networks are carrying out Utility repair and maintenance works on Wansbeck Footpath 056, Wansbeck.
The works started on 21 January 2025 at 11:27 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 14:20.
4 Mar 2025
Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Woodhorn Road, Ashington.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2025 at 08:00 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 22 Jan 2025 at 08:07.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Craster Close Budle Close Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:02.
21 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Craster Close Budle Close Footway, Blyth.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 27 January 2025 at 07:30 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:16.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Budle Close Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:03.
21 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Budle Close Footway, Blyth.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 27 January 2025 at 07:30 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:15.
Today
Northumbrian Water were proposing to carry out Utility repair and maintenance works on New Sandridge, Newbiggin-by-the-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 5 Nov 2024 at 09:11.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway improvement works on C126 Coneygarth To Wansbeck District Boundary, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:33.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:10.
7 Feb 2025
Northumberland County Council are carrying out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:36.
7 Feb 2025
Northumberland County Council are carrying out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.
Today
Northumberland County Council were proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:07.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway improvement works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:28.
27 Jan and 7 Feb 2025
Northumberland County Council were proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:33.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:18.
7 Feb 2025
Northumberland County Council are carrying out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.
Today
Northumberland County Council were proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:07.
27 Jan and 7 Feb 2025
Northumberland County Council are proposing to carry out Highway improvement works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:19.
27 Jan and 7 Feb 2025
Northumberland County Council were proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:33.
30 Jan and 27 Feb 2025
Northumberland County Council are proposing to carry out Works for road purposes on Stead Lane, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 23 Jan 2025 at 09:14.
30 Jan and 27 Feb 2025
Northumberland County Council are proposing to carry out Works for road purposes on Stead Lane, Bedlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 29 Jan 2025 at 12:36.
10 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on C395 Pegswood Main Road Through Village, Pegswood Village, Pegswood.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 09:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 13:36.
3 Feb and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hodgsons Road, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 10:39.
3 Feb and 12 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 16:27.
3 and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Market Place, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Jan 2025 at 15:54.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 15:57.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 14:24.
3 and 7 Feb 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 17:56.
3 and 7 Feb 2025
Northumberland County Council are proposing to carry out Works for road purposes on Fifth Avenue, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 09:11.
3 and 7 Feb 2025
Northumberland County Council are proposing to carry out Works for road purposes on Fifth Avenue, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 16:46.
10 and 28 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Walton Avenue, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:03.
10 Feb and 13 Mar 2025
Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 14:24.
10 Feb and 9 May 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on North Seaton Road, Ashington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 11:36.
10 Feb and 9 May 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on North Seaton Road, Ashington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 09:55.
10 and 14 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:52.
10 and 14 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:39.
10 and 14 Feb 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:31.
17 Feb and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9517 Norham Close Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 13:05.
17 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Disraeli Street, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:20.
17 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:05.
17 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lilac Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:02.
17 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:00.
20 Feb and 12 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 13:20.
20 Feb and 12 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on A1068 Scotland Gate, Choppington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 13:19.
20 Feb and 2 Apr 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on First Avenue, Ashington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 22 Nov 2024 at 13:13.
20 Feb and 2 Apr 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Woodhorn Road, Ashington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 14:06.
23 Feb and 1 Mar 2025
Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:55.
24 Feb and 24 Oct 2025
Northumberland County Council are proposing to carry out Works for road purposes on Quay Road, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 9 Dec 2024 at 15:56.
24 Feb and 24 Oct 2025
Northumberland County Council are proposing to carry out Works for road purposes on Quay Road, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 29 Jan 2025 at 14:42.
24 and 28 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hartford Road, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 3 Dec 2024 at 12:44.
24 Feb and 21 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Black Close Bank, Ashington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 17:12.
24 Feb and 12 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Woodhorn Road Back, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 10:35.
24 Feb and 12 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Woodhorn Road Back, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 22 Jan 2025 at 14:37.
24 and 28 Feb 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Rosalind Street, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 20 Jan 2025 at 14:55.
24 Feb and 12 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Back Lintonville Terrace, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 10:41.
24 Feb and 12 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Back Lintonville Terrace, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 22 Jan 2025 at 14:41.
27 Feb and 19 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:01.
27 Feb and 19 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1068 Scotland Gate, Choppington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:11.
28 Feb and 10 Apr 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Woodhorn Road, Ashington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 21 Jan 2025 at 14:55.
3 and 7 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on U9511 Princess Louise Road Back Lane, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 16:14.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Disraeli Street, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 13:39.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lilac Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:10.
3 Mar and 8 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hodgsons Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 16:15.
3 Mar and 12 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 13:55.
3 Mar and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:13.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:08.
3 and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Limes Avenue, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:09.
3 and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9502 Old Cowpen Road, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:16.
3 and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Blyth Valley Bridleway 010, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:12.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway improvement works on Morpeth Road, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:45.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:44.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway improvement works on Morpeth Road, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:53.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway improvement works on Riverside Avenue, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:55.
3 and 8 Mar 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on Coopies Haugh, Morpeth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 16:03.
3 and 8 Mar 2025
Northumberland County Council are proposing to carry out Highway improvement works on Coopies Haugh, Morpeth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 15:38.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on Coopies Haugh, Morpeth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 23 Dec 2024 at 11:29.
3 and 8 Mar 2025
Northumberland County Council were proposing to carry out Highway improvement works on Coopies Haugh, Morpeth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 15:10.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway improvement works on Welbeck Road, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:57.
3 and 7 Mar 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on Riverside Avenue, Guide Post.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:47.
3 and 21 Mar 2025
Northumberland County Council were proposing to carry out Highway repair and maintenance works on Stakeford Crescent, Stakeford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 7 Jan 2025 at 13:55.
3 and 28 Mar 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on River Bank, West Sleekburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 13:23.
3 and 14 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Portia Street, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Dec 2024 at 11:40.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Rosalind Street, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Dec 2024 at 11:36.
3 and 14 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Ariel Street, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Dec 2024 at 11:39.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 17:07.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 08:56.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:09.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:24.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:07.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:24.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:03.
11 and 18 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:22.
17 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9517 Bamburgh Close Footway, Blyth.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 13:45.
17 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Walton Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 16:18.
17 Mar and 4 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9501 Fire Station Road, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 13:07.
17 and 28 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Juliet Street, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Dec 2024 at 11:43.
20 and 26 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:35.
20 and 26 Mar 2025
Northumberland County Council were proposing to carry out Works for road purposes on Booths Road, Ashington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.
20 and 26 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:29.
20 and 26 Mar 2025
Northumberland County Council were proposing to carry out Works for road purposes on Rotary Parkway, Ashington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.
20 and 26 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:21.
20 and 26 Mar 2025
Northumberland County Council were proposing to carry out Works for road purposes on Morpeth Road, Ashington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.
24 and 28 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Maddison Street, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 16:06.
24 and 28 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Gatacre Street, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 16:11.
24 Mar and 11 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9501 Bates Old Pit Road, Blyth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:24.
24 and 26 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on North Seaton Road, Newbiggin-by-the-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Jan 2025 at 10:43.
26 and 28 Mar 2025
Northumberland County Council are proposing to carry out Works for road purposes on Newbiggin Road, Ashington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 16 Jan 2025 at 10:28.
31 Mar and 4 Apr 2025
Northumberland County Council are proposing to carry out Works for road purposes on Station Road, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:56.
7 and 11 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on U9511 Middleton Terrace Back Lane, Blyth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 09:19.
7 and 29 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Temple Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 16:20.
7 and 11 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Carisbrooke, Beaufront Park, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 29 Jan 2025 at 14:36.
14 Apr and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Limes Avenue, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 16:51.
14 Apr and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9502 Old Cowpen Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 17:08.
14 Apr and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blyth Valley Bridleway 010, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 17:06.
18 and 21 Apr 2025
Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:57.
21 and 25 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Melrose Terrace Meldon Terrace Back Lane, Newbiggin-by-the-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 29 Jan 2025 at 14:56.
22 Apr and 6 Jun 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Spring Ville, East Sleekburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Jan 2025 at 08:11.
28 Apr and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9501 Fire Station Road, Blyth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 16:25.
28 Apr and 19 May 2025
Northumberland County Council are proposing to carry out Highway repair and maintenance works on A1147 Spine Road To Milburn Terrace, Bedlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 12:34.
Roadworks Map near to Ariel Street, ASHINGTON, NE63 9NG (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ariel Street, ASHINGTON, NE63 9NG (20 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Jan 2025 - 31 Jan 2025)
(Scheduled: 20 Jan 2025 - 3 Feb 2025)
(Scheduled: 6 Jan 2025 - 3 Feb 2025)
(Scheduled: 22 Jan 2025 - 4 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.