ROADWORKS SUMMARY
High Park, MORPETH, NE61 2SR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for High Park, NE61 2SR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to High Park, MORPETH, NE61 2SR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
B6343 Mitford To Morpeth

Northumberland County Council are carrying out Highway repair and maintenance works on B6343 Mitford To Morpeth, Mitford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 13:42 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 6 Dec 2024 at 09:30.

LONG TERM
Between
18 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Netherton Lane

Northumberland County Council are proposing to carry out Works for road purposes on Netherton Lane, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:38.

LONG TERM
Between
18 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Netherton Lane

Northumberland County Council are proposing to carry out Works for road purposes on Netherton Lane, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 8 Oct 2024 at 10:20.

LONG TERM
Between
18 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Netherton Road

Northumberland County Council are proposing to carry out Works for road purposes on Netherton Road, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:32.

LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Netherton Road

Northumberland County Council are carrying out Works for road purposes on Netherton Road, Bedlington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 5 Dec 2024 at 10:05.

LONG TERM
Between
18 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Hazelmere Avenue

Northumberland County Council are proposing to carry out Works for road purposes on Hazelmere Avenue, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 7 Oct 2024 at 16:39.

LONG TERM
Between
18 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Hazelmere Avenue

Northumberland County Council are proposing to carry out Works for road purposes on Hazelmere Avenue, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 8 Oct 2024 at 10:21.

Northumbrian Water logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Remscheid Way

Northumbrian Water are carrying out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 11:18 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 09:41.

Northumbrian Water logo
LONG TERM
Between
6 Dec 2024 and 13 Mar 2025
Details
View Map
Share
Follow
Remscheid Way

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 11:18.

Northumbrian Water logo
LONG TERM
Between
9 Dec 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Remscheid Way

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 09:24.

Northumbrian Water logo
LONG TERM
Between
9 Dec 2024 and 14 Mar 2025
Details
View Map
Share
Remscheid Way

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 6 Dec 2024 at 07:56.

LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
North Seaton Road

Northumberland County Council were proposing to carry out Highway improvement works on North Seaton Road, Ashington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 15 Jan 2025 at 10:48.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Remscheid Way

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Remscheid Way, Jubilee Industrial Estate, Ashington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 10:54.

Finishing
Friday
Details
View Map
Share
Follow
C126 District Boundary To Longhirst Brocks Junction

Northumberland County Council are carrying out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.

Finishing
Friday
Details
View Map
Share
Follow
C126 Coneygarth To Wansbeck District Boundary

Northumberland County Council are proposing to carry out Highway improvement works on C126 Coneygarth To Wansbeck District Boundary, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:33.

Finishing
Friday
Details
View Map
Share
Follow
C126 Coneygarth To Wansbeck District Boundary

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:10.

Finishing
Friday
Details
View Map
Share
Follow
C126 Coneygarth To Wansbeck District Boundary

Northumberland County Council are carrying out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.

Finishing
Friday
Details
View Map
Share
Follow
C126 District Boundary To Longhirst Brocks Junction

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:36.

Finishing
Friday
Details
View Map
Share
C125 Longhirst Junction To Potland Roundabout

Northumberland County Council were proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:33.

Finishing
Friday
Details
View Map
Share
Follow
C126 District Boundary To Longhirst Brocks Junction

Northumberland County Council are proposing to carry out Highway improvement works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:28.

Finishing
Friday
Details
View Map
Share
C126 District Boundary To Longhirst Brocks Junction

Northumberland County Council were proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 09:33.

Finishing
Friday
Details
View Map
Share
Follow
C125 Longhirst Junction To Potland Roundabout

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 21 Jan 2025 at 10:18.

Finishing
Friday
Details
View Map
Share
Follow
C125 Longhirst Junction To Potland Roundabout

Northumberland County Council are carrying out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 14:52.

Finishing
Friday
Details
View Map
Share
Follow
C125 Longhirst Junction To Potland Roundabout

Northumberland County Council are proposing to carry out Highway improvement works on C125 Longhirst Junction To Potland Roundabout, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 8 Nov 2024 at 12:19.

Between
30 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Stead Lane

Northumberland County Council are proposing to carry out Works for road purposes on Stead Lane, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 23 Jan 2025 at 09:14.

Between
30 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Stead Lane

Northumberland County Council are proposing to carry out Works for road purposes on Stead Lane, Bedlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 29 Jan 2025 at 12:36.

Northern Gas Networks logo
Until
10 Feb 2025
Details
View Map
Share
Follow
C395 Pegswood Main Road Through Village

Northern Gas Networks are carrying out Utility repair and maintenance works on C395 Pegswood Main Road Through Village, Pegswood Village, Pegswood.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 09:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 13:36.

Northern Powergrid (Northeast) logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Market Place

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Market Place, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Jan 2025 at 15:54.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rothesay Terrace Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 15:57.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rothesay Terrace Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 14:24.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Rothesay Terrace Back

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Rothesay Terrace Back, Bedlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 17:56.

Between
4 and 21 Feb 2025
Details
View Map
Share
Follow
Butchers Lane

Northumberland County Council are proposing to carry out Section 50 on Butchers Lane, Pegswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 31 Jan 2025 at 15:13.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
C126 Coneygarth To Wansbeck District Boundary

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 Coneygarth To Wansbeck District Boundary, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:52.

LONG TERM
Between
10 Feb and 19 Mar 2025
Details
View Map
Share
Follow
B6343 Mitford To Morpeth

Northumberland County Council are proposing to carry out Highway repair and maintenance works on B6343 Mitford To Morpeth, Mitford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 8 Jan 2025 at 15:38.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
High Stanners

Northumberland County Council are proposing to carry out Highway improvement works on High Stanners, Morpeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 6 Dec 2024 at 10:47.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
High Stanners

Northumberland County Council are proposing to carry out Highway improvement works on High Stanners, Morpeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 25 Nov 2024 at 14:12.

Between
10 Feb and 9 Mar 2025
Details
View Map
Share
Follow
B6343 Mitford To Morpeth

Northumberland County Council are proposing to carry out Highway repair and maintenance works on B6343 Mitford To Morpeth, Mitford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 28 Jan 2025 at 12:26.

LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
North Seaton Road

Northumberland County Council are proposing to carry out Highway repair and maintenance works on North Seaton Road, Ashington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 11:36.

LONG TERM
Between
10 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Station Road

Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 14:24.

LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
North Seaton Road

Northumberland County Council are proposing to carry out Highway repair and maintenance works on North Seaton Road, Ashington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 09:55.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
C126 District Boundary To Longhirst Brocks Junction

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C126 District Boundary To Longhirst Brocks Junction, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:39.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
C125 Longhirst Junction To Potland Roundabout

Northumberland County Council are proposing to carry out Highway repair and maintenance works on C125 Longhirst Junction To Potland Roundabout, Longhirst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 11:31.

Northern Gas Networks logo
Between
20 Feb and 12 Mar 2025
Details
View Map
Share
Eastgate

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 13:20.

Northern Gas Networks logo
Between
20 Feb and 12 Mar 2025
Details
View Map
Share
A1068 Scotland Gate

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on A1068 Scotland Gate, Choppington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 13:19.

Between
23 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Station Road

Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:55.

Northumbrian Water logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Black Close Bank

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Black Close Bank, Ashington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 17:12.

Between
24 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Back Lintonville Terrace

Northumberland County Council are proposing to carry out Works for road purposes on Back Lintonville Terrace, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 31 Jan 2025 at 13:42.

Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Back Lintonville Terrace

Northumberland County Council are proposing to carry out Works for road purposes on Back Lintonville Terrace, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 10:41.

Between
24 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Woodhorn Road Back

Northumberland County Council are proposing to carry out Works for road purposes on Woodhorn Road Back, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 31 Jan 2025 at 14:03.

Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Woodhorn Road Back

Northumberland County Council are proposing to carry out Works for road purposes on Woodhorn Road Back, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 10:35.

Northumbrian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hartford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hartford Road, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Dec 2024 at 12:44.

Northern Gas Networks logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
A1068 Scotland Gate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1068 Scotland Gate, Choppington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:11.

Northern Gas Networks logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Eastgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:01.

Between
3 and 21 Mar 2025
Details
View Map
Share
Stakeford Crescent

Northumberland County Council were proposing to carry out Highway repair and maintenance works on Stakeford Crescent, Stakeford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 7 Jan 2025 at 13:55.

Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Coopies Haugh

Northumberland County Council are proposing to carry out Highway improvement works on Coopies Haugh, Morpeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 16 Dec 2024 at 15:38.

Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Coopies Haugh

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Coopies Haugh, Morpeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 31 Jan 2025 at 07:09.

Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Coopies Haugh

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Coopies Haugh, Morpeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 16:03.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Riverside Avenue

Northumberland County Council are proposing to carry out Highway improvement works on Riverside Avenue, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:55.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Morpeth Road

Northumberland County Council are proposing to carry out Highway improvement works on Morpeth Road, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:53.

Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
River Bank

Northumberland County Council are proposing to carry out Highway repair and maintenance works on River Bank, West Sleekburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 13:23.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Welbeck Road

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:44.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Morpeth Road

Northumberland County Council are proposing to carry out Highway improvement works on Morpeth Road, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:45.

Between
3 and 7 Mar 2025
Details
View Map
Share
Coopies Haugh

Northumberland County Council were proposing to carry out Highway repair and maintenance works on Coopies Haugh, Morpeth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 31 Jan 2025 at 07:08.

Between
3 and 8 Mar 2025
Details
View Map
Share
Coopies Haugh

Northumberland County Council were proposing to carry out Highway improvement works on Coopies Haugh, Morpeth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 30 Jan 2025 at 15:10.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Welbeck Road

Northumberland County Council are proposing to carry out Highway improvement works on Welbeck Road, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 14:57.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Riverside Avenue

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Riverside Avenue, Guide Post.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 11:47.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Eastgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 08:56.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Eastgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastgate, Scotland Gate, Choppington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 17:07.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Rotary Parkway

Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:24.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Morpeth Road

Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:22.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Morpeth Road

Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:03.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Rotary Parkway

Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:07.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Booths Road

Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:24.

Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Booths Road

Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 18 Dec 2024 at 16:09.

Between
20 and 26 Mar 2025
Details
View Map
Share
Morpeth Road

Northumberland County Council were proposing to carry out Works for road purposes on Morpeth Road, Ashington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.

Between
20 and 26 Mar 2025
Details
View Map
Share
Follow
Morpeth Road

Northumberland County Council are proposing to carry out Works for road purposes on Morpeth Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:21.

Between
20 and 26 Mar 2025
Details
View Map
Share
Rotary Parkway

Northumberland County Council were proposing to carry out Works for road purposes on Rotary Parkway, Ashington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.

Between
20 and 26 Mar 2025
Details
View Map
Share
Follow
Rotary Parkway

Northumberland County Council are proposing to carry out Works for road purposes on Rotary Parkway, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:29.

Between
20 and 26 Mar 2025
Details
View Map
Share
Booths Road

Northumberland County Council were proposing to carry out Works for road purposes on Booths Road, Ashington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 24 Jan 2025 at 11:26.

Between
20 and 26 Mar 2025
Details
View Map
Share
Follow
Booths Road

Northumberland County Council are proposing to carry out Works for road purposes on Booths Road, Ashington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 13 Dec 2024 at 11:35.

Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
A192 Plessey Checks To Hartford Bridge

Northumberland County Council are proposing to carry out Works for road purposes on A192 Plessey Checks To Hartford Bridge, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 16:28.

Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Northumberland County Council are proposing to carry out Works for road purposes on Station Road, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:56.

Northumbrian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Carisbrooke

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Carisbrooke, Beaufront Park, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 Jan 2025 at 14:36.

Between
18 and 21 Apr 2025
Details
View Map
Share
Follow
Station Road

Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:57.

Between
28 Apr and 19 May 2025
Details
View Map
Share
Follow
A1147 Spine Road To Milburn Terrace

Northumberland County Council are proposing to carry out Highway repair and maintenance works on A1147 Spine Road To Milburn Terrace, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 12:34.

Between
2 and 5 May 2025
Details
View Map
Share
Follow
Station Road

Northumberland County Council are proposing to carry out Works for Rail Purposes on Station Road, Bedlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 27 Jan 2025 at 16:57.


Roadworks Map near to High Park, MORPETH, NE61 2SR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 2 Feb 2025 02:43
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to High Park, MORPETH, NE61 2SR (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
CASTLE BANK 
(0.1 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Lane closure
Planned
Scheduled: 3 Feb 2025 - 5 Feb 2025
0.1
Details
Share
Follow
2
Northumbrian Water logo
BANKSIDE, ALLERY BANKS 
(0.2 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Feb 2025 - 5 Feb 2025
0.2
Details
Share
Follow
3
Northumbrian Water logo
NEWMARKET 
(0.4 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 29 Jan 2025 - 4 Feb 2025)
0.4
Details
Share
4
Network Rail logo
BENNETTS WALK, MIDDLE GREENS 
(0.5 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Carriageway -
Planned
Scheduled: 2 Feb 2025 - 3 Feb 2025
0.5
Details
Share
Follow
5
Northumbrian Water logo
EMILY DAVISON AVENUE, SPRINGHILL 
(0.6 miles)
Northumbrian Water
Remedial works - Carriageway - Priority working
Planned
Scheduled: 3 Feb 2025
0.6
Details
Share
Follow
6
Northumbrian Water logo
URGENT
  
NORHAM DRIVE, STOBHILL MANOR 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 28 Jan 2025 08:38
(Scheduled: 28 Jan 2025 - 3 Feb 2025)
0.7
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
HIGHMOOR, KIRKHILL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 27 Jan 2025 - 14 Feb 2025
0.8
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
HIGHMOOR, KIRKHILL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 27 Jan 2025 - 14 Feb 2025)
0.8
Details
Share
9
Northern Gas Networks logo
MAJOR
  
THE PASTURES, KIRKHILL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 27 Jan 2025 - 28 Feb 2025
0.8
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
THE PASTURES, KIRKHILL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 27 Jan 2025 09:00
(Scheduled: 27 Jan 2025 - 28 Feb 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.