ROADWORKS SUMMARY
Manor View, WASHINGTON, NE37 3EX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Manor View, NE37 3EX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Manor View, WASHINGTON, NE37 3EX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manor View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Gateshead Highway To Askew Road And Quaysgate To Park Lane

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway To Askew Road And Quaysgate To Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:07.

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Washington Road

Sunderland City Council are carrying out Highway improvement works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Sunderland City Council on 9 Dec 2024 at 13:34.

South Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are proposing to carry out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 21 Jun 2024 at 09:47.

South Tyneside Council logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are carrying out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 07:00 and could run through until 20 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 23 Sep 2024 at 07:56.

South Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Albert Road Flyover

South Tyneside Council are carrying out Highway repair and maintenance works on Albert Road Flyover, Jarrow.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 18:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 24 Apr 2025 at 09:08.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Gateshead Highway Lower Level - Park Lane To Sunderland Road Roundabout

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Lower Level - Park Lane To Sunderland Road Roundabout, Gateshead Central, Gateshead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 15:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Mar 2025 at 08:28.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Gateshead Highway Upper Level

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Upper Level, Gateshead Central, Gateshead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 15:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Mar 2025 at 08:23.

National Highways logo
LONG TERM
Between
14 Feb and 30 Jul 2025
Details
View Map
Share
Lumley New Road

National Highways were proposing to carry out Diversionary works on Lumley New Road, Castle Dene.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Feb 2025 at 12:57.

Northern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 07:30 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 13:04.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 13 Jun 2025
Details
View Map
Share
Old Durham Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 09:12.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 11:07.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 20 Jun 2025
Details
View Map
Share
Old Durham Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 09:33.

Northern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Dame Flora Robson Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Dame Flora Robson Avenue, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 08:45 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 08:52.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Clarence Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Clarence Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:30.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Osborne Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Osborne Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:23.

Northumbrian Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 10 Apr 2025 at 09:11.

Northumbrian Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are carrying out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 17:00 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 16 Apr 2025 at 08:13.

Northern Gas Networks logo
LONG TERM
Between
24 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Ditchburn Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ditchburn Terrace, Pallion, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 09:26.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Booth Street Via Walker View Back To Rowlandson Street Footpath

Northumbrian Water are carrying out Utility repair and maintenance works on Booth Street Via Walker View Back To Rowlandson Street Footpath, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:30.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:29.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:28.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 6 June 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:27.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Shipcote Terrace

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Shipcote Terrace, Shipcote, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 09:14.

Northern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Lambton Terrace

Northern Gas Networks are carrying out Utility repair and maintenance works on Lambton Terrace, Jarrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 07:30 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 12:13.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Feb 2025 at 10:25.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:03 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 08:03.

Northern Gas Networks logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Frome Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Frome Gardens, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:42.

Northern Gas Networks logo
LONG TERM
Until
16 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are carrying out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 14:00 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 14:10.

Northern Gas Networks logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Frome Gardens

Northern Gas Networks are carrying out Utility repair and maintenance works on Frome Gardens, Chowdene, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 12:40 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:42.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 26 May 2025 and could run through until 4 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 12 May 2025 at 10:40.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 26 May 2025 and could run through until 4 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 13 May 2025 at 11:25.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 Apr 2025 at 08:39.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 Apr 2025 at 15:21.

Northumbrian Water logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are carrying out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 May 2025 at 08:16.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 Apr 2025 at 15:22.

Northumbrian Water logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are carrying out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 May 2025 at 08:17.

Gateshead Metropolitan Borough Council logo
Between
27 May and 16 Jun 2025
Details
View Map
Share
Follow
Quarryfield Road

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Quarryfield Road, East Gateshead, Gateshead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 May 2025 at 10:59.

Gateshead Metropolitan Borough Council logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Quarryfield Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Quarryfield Road, East Gateshead, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 27 May 2025 at 08:49.

Northern Powergrid (Northeast) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mayfield Gardens

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Mayfield Gardens, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Feb 2025 at 12:05.

Northern Powergrid (Northeast) logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Mayfield Gardens

Northern Powergrid (Northeast) are carrying out Utility asset works on Mayfield Gardens, Jarrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:15 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 May 2025 at 12:00.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 13:35.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Apr 2025 at 09:23.

Northumbrian Water logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are carrying out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 14:45 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 14:50.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 15:46.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 Apr 2025 at 11:53.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 12:30.

Northumbrian Water logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are carrying out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:50 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:50.

Northumbrian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road

Northumbrian Water are carrying out Utility repair and maintenance works on Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road, Birtley Central, Birtley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 13:54 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 07:57.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Washington Highway

Sunderland City Council are proposing to carry out Highway improvement works on Washington Highway, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Apr 2025 at 14:43.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Washington Highway

Sunderland City Council are proposing to carry out Highway improvement works on Washington Highway, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 May 2025 at 07:43.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Bonemill Lane

Sunderland City Council are proposing to carry out Highway improvement works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Apr 2025 at 14:44.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Bonemill Lane

Sunderland City Council are proposing to carry out Highway improvement works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 May 2025 at 07:43.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 29 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 08:59.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 29 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 12:43.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Chester Road

Durham County Council were proposing to carry out Highway repair and maintenance works on Chester Road, Bournmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 09:20.

Northumbrian Water logo
Finishing
Saturday
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on The Avenue (Back), Pelton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:50 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 09:11.

Until
21 Jun 2025
Details
View Map
Share
Follow
A19 J A1231 Leave S

Sunderland City Council are carrying out Highway improvement works on A19 J A1231 Leave S, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 23:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Jun 2025 at 08:00.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Kingsway Roundabout

National Highways are proposing to carry out Works for road purposes on Kingsway Roundabout, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 May 2025 at 15:17.

Until
21 Jun 2025
Details
View Map
Share
Follow
A19 From J A1290 To J A1231 S

Sunderland City Council are carrying out Highway repair and maintenance works on A19 From J A1290 To J A1231 S, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 23:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Jun 2025 at 07:59.

Until
21 Jun 2025
Details
View Map
Share
Follow
A19 J A1290 Join S

Sunderland City Council are carrying out Highway repair and maintenance works on A19 J A1290 Join S, South Tyneside.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 23:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Jun 2025 at 07:59.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 5 Mar 2025 at 13:56.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Claremont Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Mar 2025 at 09:07.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Claremont Place

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:09.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Mar 2025 at 09:06.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:09.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Feb 2025 at 10:20.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Staple Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Staple Road, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Feb 2025 at 12:33.

Northumbrian Water logo
Finishing
Sunday
Details
View Map
Share
The Avenue (Back)

Northumbrian Water were proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:53.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:24.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Easedale Gardens From Harlow Green Lane To Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Easedale Gardens From Harlow Green Lane To Long Bank, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:45.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Springwell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springwell Road, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:21.

South Tyneside Council logo
Between
8 and 10 Jun 2025
Details
View Map
Share
Follow
North Farm Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on North Farm Road, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Feb 2025 at 14:12.

South Tyneside Council logo
Between
8 and 10 Jun 2025
Details
View Map
Share
Follow
North Farm Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on North Farm Road, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 24 Apr 2025 at 08:55.

Northumbrian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Mar 2025 at 10:13.

Northumbrian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 07:48.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
The Generals Wood

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 12:55.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:48.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 13:00.

Durham County Council logo
Between
9 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Ouston Lane

Durham County Council are proposing to carry out New service connection on Ouston Lane, Ouston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 10:06.

Northumbrian Water logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
International Drive

Northumbrian Water are proposing to carry out Utility asset works on International Drive, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 10:34.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Field House Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Field House Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:07.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Fern Dene Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fern Dene Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:01.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Saltwell View

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saltwell View, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 11:51.

Gateshead Metropolitan Borough Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Herbert Street

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Herbert Street, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 May 2025 at 10:24.

Gateshead Metropolitan Borough Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Herbert Street

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Herbert Street, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 May 2025 at 14:54.

Northern Powergrid (Northeast) logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 May 2025 at 09:25.

Newcastle City Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 07:01.

Northern Gas Networks logo
Between
11 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:35.

Northern Gas Networks logo
Between
11 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:37.

Gateshead Metropolitan Borough Council logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 10:26.

Northern Powergrid (Northeast) logo
Between
12 Jun and 7 Jul 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 May 2025 at 07:00.

Gateshead Metropolitan Borough Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Seventh Avenue

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seventh Avenue, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:52.

Gateshead Metropolitan Borough Council logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Ridgeway

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridgeway, Leam Lane Estate, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 Apr 2025 at 11:14.

Gateshead Metropolitan Borough Council logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Ridgeway

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridgeway, Leam Lane Estate, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 Apr 2025 at 13:20.

Northumbrian Water logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street, Felling Central, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 18 Mar 2025 at 11:25.

Gateshead Metropolitan Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Whitehall Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:30.

Gateshead Metropolitan Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Coatsworth Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coatsworth Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:35.

Northern Powergrid (Northeast) logo
Between
17 Jun and 10 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 13:59.

Gateshead Metropolitan Borough Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Seventh Avenue

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seventh Avenue, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 10 Mar 2025 at 15:09.

Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
A19 J A1231 Join N

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A19 J A1231 Join N, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
A19 From J A1231 To J A1290 N

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A19 From J A1231 To J A1290 N, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 12:17.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Easedale Gardens From Harlow Green Lane To Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Easedale Gardens From Harlow Green Lane To Long Bank, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:12.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Springwell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springwell Road, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 12:06.

Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
A19 J A1290 Leave N

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A19 J A1290 Leave N, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northern Powergrid (Northeast) logo
Between
23 Jun and 16 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 13:59.

Northern Powergrid (Northeast) logo
Between
24 Jun and 11 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Field House Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Field House Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:30.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Fern Dene Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fern Dene Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:25.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Saltwell View

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saltwell View, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 16:11.

Northern Powergrid (Northeast) logo
Between
25 Jun and 24 Jul 2025
Details
View Map
Share
North Farm Road

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on North Farm Road, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:01.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:07.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:15.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:33.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:52.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:41.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 12:57.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:14.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:34.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:44.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Alderwood

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 24 July 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 07:52.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:51.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 12:58.

South Tyneside Council logo
Between
27 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Finchale Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Finchale Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 14:06.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 Jun and 28 Jul 2025
Details
View Map
Share
Glen Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Glen Street, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 28 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Gateshead Metropolitan Borough Council logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Cuthbert Street To Consett Route Westbound Slip On

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cuthbert Street To Consett Route Westbound Slip On, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 19 Mar 2025 at 08:30.

Northern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Newcastle Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newcastle Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 09:11.

Northern Powergrid (Northeast) logo
LONG TERM
Between
30 Jun and 31 Jul 2025
Details
View Map
Share
Bell Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Bell Street, Hebburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Staple Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Staple Road, Jarrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 14:53.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Castle Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Castle Close, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:03.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Eighth Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Eighth Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:28.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Murray Place

Durham County Council are proposing to carry out Highway repair and maintenance works on Murray Place, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:10.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Twelfth Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Twelfth Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:14.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Jacques Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Jacques Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:20.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
South Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:44.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
South Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 14:34.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
Cleb 23

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 23, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:46.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
Cleb 23

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 23, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 14:08.

Northern Gas Networks logo
LONG TERM
Between
2 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Bridle Path

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Path, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:48.

Northern Gas Networks logo
LONG TERM
Between
2 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Bridle Path

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Path, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 13:51.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:05.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:52.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 13:37.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:09.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:28.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:36.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:14.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 14:07.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:35.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:25.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:22.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:44.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:22.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:15.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:39.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:20.

Northumbrian Water logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 25 Feb 2025 at 07:05.

Northern Powergrid (Northeast) logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Argyle Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Argyle Street, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:24.

Northern Powergrid (Northeast) logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Argyle Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Argyle Street, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 14:19.

South Tyneside Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 14 May 2025 at 14:13.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:16.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:17.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 2 Apr 2025 at 11:00.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 J A690/b1286 Leave S

Sunderland City Council are proposing to carry out Highway improvement works on A19 J A690/b1286 Leave S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 From J A183 To J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 From J A183 To J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 J A183 Join S

Sunderland City Council are proposing to carry out Highway improvement works on A19 J A183 Join S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 12:35.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 13:06.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:07.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Rear Of Northbourne Road

Northumbrian Water were proposing to carry out Remedial works on Rear Of Northbourne Road, Jarrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Apr 2025 at 10:39.

Northern Powergrid (Northeast) logo
Between
16 and 29 Jul 2025
Details
View Map
Share
Follow
Brown Crescent

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Brown Crescent, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Apr 2025 at 08:07.

Northern Powergrid (Northeast) logo
Between
16 and 29 Jul 2025
Details
View Map
Share
Follow
Brown Crescent

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Brown Crescent, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 15:26.

Northern Gas Networks logo
Between
16 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Cleb 16

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 16, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 16 July 2025 and could run through until 12 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:49.

Northern Gas Networks logo
Between
16 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Cleb 3

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 3, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 16 July 2025 and could run through until 5 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:51.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 14:01.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 09:19.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:24.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 09:41.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 11:04.

Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northumbrian Water logo
LONG TERM
Between
21 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Pelton Lane

Northumbrian Water are proposing to carry out Utility asset works on Pelton Lane, Pelton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 11:54.

Northern Powergrid (Northeast) logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Shields Road From Heworth Roundabout To Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shields Road From Heworth Roundabout To Victoria Road West, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:03.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:27.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 14:29.

Northumbrian Water logo
LONG TERM
Between
24 Jul and 5 Sep 2025
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 25 Feb 2025 at 07:06.

Northern Gas Networks logo
LONG TERM
Between
25 Jul and 5 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 08:49.

Northern Gas Networks logo
LONG TERM
Between
25 Jul and 22 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:11.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 09:00.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 11:18.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 11:50.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Claremont Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 12:51.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 12:51.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Road, East Gateshead, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:33.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Road, East Gateshead, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:18.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:33.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Station Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Station Road, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 May 2025 at 12:10.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Apr 2025 at 09:53.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 09:30.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Apr 2025 at 09:54.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 09:33.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Bullion Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Bullion Lane, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 10:10.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:21.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 14:35.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:20.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Harraton Footpath 28

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 21 August 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 08:09.

Northern Gas Networks logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Dipe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dipe Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 11:54.

Cityfibre Metro Networks logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Elliot Road

Cityfibre Metro Networks are proposing to carry out Remedial works on Elliot Road, Old Fold, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 May 2025 at 15:15.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Shelley Drive

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shelley Drive, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 May 2025 at 12:30.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Byron Walk

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Byron Walk, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 May 2025 at 15:48.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Keats Walk

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Keats Walk, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 May 2025 at 15:40.

Northern Powergrid (Northeast) logo
LONG TERM
Between
15 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 May 2025 at 09:13.

Northumbrian Water logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Park Row

Northumbrian Water are proposing to carry out Utility asset works on Park Row, Felling Central, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 May 2025 at 09:41.

South Tyneside Council logo
Between
18 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Tavistock Place

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Tavistock Place, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 09:27.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Brack Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:33.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 22 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Apr 2025 at 11:23.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 22 Dec 2025
Details
View Map
Share
Raby Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 22 December 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 10:43.

Gateshead Metropolitan Borough Council logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Albany Road From Park Lane To Quarryfield Road Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Albany Road From Park Lane To Quarryfield Road Roundabout, East Gateshead, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:32.

Gateshead Metropolitan Borough Council logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Albany Road From Park Lane To Quarryfield Road Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Albany Road From Park Lane To Quarryfield Road Roundabout, East Gateshead, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:19.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 May 2025 at 13:49.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:35.


Roadworks Map near to Manor View, WASHINGTON, NE37 3EX (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Manor View, WASHINGTON, NE37 3EX (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
THE OVAL, CONCORD 
(0.2 miles)
Northumbrian Water
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 10:00
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.2
Details
Share
Follow
2
Virgin Media logo
VERMONT, CONCORD 
(0.2 miles)
Virgin Media
Utility asset works - Verge - No carriageway incursion
Complete
30 May 2025 14:18 - 16:07
0.2
Details
Share
3
BT logo
URGENT
  
HEWORTH CRESCENT, CONCORD 
(0.3 miles)
BT
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Complete
31 May 2025 12:19 - 2 Jun 2025 07:44
0.3
Details
Share
4
BT logo
MANDEVILLE, SULGRAVE 
(0.4 miles)
BT
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.4
Details
Share
Follow
5
Northumbrian Water logo
URGENT
  
USWORTH STATION ROAD, SULGRAVE 
(0.5 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
26 May 2025 11:41 - 2 Jun 2025 07:30
0.5
Details
Share
6
Northumbrian Water logo
URGENT
  
DOUGLAS TERRACE EAST BACK, CONCORD 
(0.6 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
28 May 2025 13:37 - 2 Jun 2025 10:55
0.6
Details
Share
7
Northern Gas Networks logo
MAJOR
  
BARMSTON WAY, BARMSTON 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Some carriageway incursion
Planned
Scheduled: 7 May 2025 - 15 Jul 2025
0.8
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
BARMSTON WAY, BARMSTON 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Some carriageway incursion
Planned
Scheduled: 7 May 2025 - 15 Jul 2025
0.8
Details
Share
Follow
9
Cityfibre Metro Networks logo
ARKLECRAG, ALBANY 
(0.8 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025
0.8
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
BARMSTON WAY, BARMSTON 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Some carriageway incursion
Planned
Scheduled: 7 May 2025 - 15 Jul 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.