ROADWORKS SUMMARY
Fulwell Avenue, SOUTH SHIELDS, NE34 7DF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fulwell Avenue, NE34 7DF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fulwell Avenue, SOUTH SHIELDS, NE34 7DF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fulwell Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Tyne Street

North Tyneside Council are carrying out Section 50 on Tyne Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2022 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:31.

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Bell Street

North Tyneside Council are carrying out Section 50 on Bell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2022 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:32.

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Liddell Street

North Tyneside Council are carrying out Section 50 on Liddell Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 September 2022 at 07:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 13 May 2024 at 08:17.

LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are carrying out Highway repair and maintenance works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 22 Sep 2023 at 11:05.

South Tyneside Council logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Coast Road

South Tyneside Council are carrying out Highway repair and maintenance works on Coast Road, South Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 27 Nov 2024 at 14:01.

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
European Way

Sunderland City Council are proposing to carry out Highway repair and maintenance works on European Way, Pallion Industrial Estate, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 6 Nov 2023 at 11:02.

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Paul Watson Way

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Paul Watson Way, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 16 Oct 2023 at 08:22.

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 16 Oct 2023 at 09:05.

LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Harbour View

Sunderland City Council are carrying out Highway repair and maintenance works on Harbour View, Roker, Sunderland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 23 Apr 2024 at 07:09.

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Washington Road

Sunderland City Council are carrying out Highway improvement works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Sunderland City Council on 9 Dec 2024 at 13:34.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dame Dorothy Street

Sunderland City Council are carrying out Highway improvement works on Dame Dorothy Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2024 at 08:50 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 10 Dec 2024 at 09:38.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Mortimer Street

Sunderland City Council are carrying out Highway improvement works on Mortimer Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2024 at 08:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Nov 2024 at 07:17.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:22.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:10.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Downhill Lane

South Tyneside Council are carrying out Highway improvement works on Downhill Lane, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:42.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are carrying out Highway improvement works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 20 Nov 2024 at 08:00.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2024 at 11:57.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Exeter Street

Sunderland City Council are carrying out Highway improvement works on Exeter Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 08:30 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:12.

LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
European Way

Sunderland City Council are carrying out Highway improvement works on European Way, Pallion Industrial Estate, Sunderland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:00 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 18 Sep 2024 at 09:44.

Northern Gas Networks logo
LONG TERM
Between
23 Sep 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 10:58.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 14:41.

North Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Aug 2024 at 09:48.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Promenade

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.

North Tyneside Council logo
LONG TERM
Until
18 Aug 2026
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Beverley Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent North

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Promontory Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:41.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Between
17 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Oxford Street

Sunderland City Council are carrying out Highway improvement works on Oxford Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 28 Oct 2024 at 10:35.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Thompson Road

Sunderland City Council are proposing to carry out Highway improvement works on Thompson Road, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 5 Nov 2024 at 11:55.

LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Thompson Road

Sunderland City Council are carrying out Highway improvement works on Thompson Road, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 17 Dec 2024 at 09:29.

LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Paul Watson Way

Sunderland City Council are carrying out Highway improvement works on Paul Watson Way, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 07:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 13 Nov 2024 at 07:57.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are proposing to carry out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:20.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are carrying out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:19.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are carrying out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Wellington Street

North Tyneside Council are carrying out Highway repair and maintenance works on Wellington Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 11:01.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are carrying out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are carrying out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Between
26 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Percy Park Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Percy Park Road, Tynemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:32.

North Tyneside Council logo
LONG TERM
Between
26 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:30.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are carrying out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 27 Nov 2024 at 12:48.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Bbnts 32

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:04.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
South Shields Footpath 413

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:05.

South Tyneside Council logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Albert Road Flyover

South Tyneside Council are carrying out Highway repair and maintenance works on Albert Road Flyover, Jarrow.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 18:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 6 Dec 2024 at 08:38.

Northern Gas Networks logo
Until
31 Dec 2024
Details
View Map
Share
Follow
Newcastle Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Newcastle Road, Monkwearmouth, Sunderland.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 11:20 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 13:36.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Bidd 19

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bidd 19, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 08:10.

Northern Gas Networks logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Bidd 19

Northern Gas Networks are carrying out Utility repair and maintenance works on Bidd 19, South Shields.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 11 December 2024 at 09:00 and could run through until 27 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:17.

Northern Gas Networks logo
LONG TERM
Until
27 Feb 2025
Details
View Map
Share
Follow
Sheridan Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Sheridan Road, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 09:00 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 10:28.

South Tyneside Council logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Highfield Road

South Tyneside Council are carrying out Highway improvement works on Highfield Road, South Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 16 Dec 2024 at 14:30.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Bbnts 10

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:09.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Bbnts 10

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 February 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 14:18.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Roker Avenue North Back

Northumbrian Water are carrying out Utility repair and maintenance works on Roker Avenue North Back, Roker, Sunderland.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 19:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 10:32.

North Tyneside Council logo
LONG TERM
Between
10 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Wark Avenue

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 17 Dec 2024 at 10:21.

North Tyneside Council logo
LONG TERM
Between
13 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 20 Sep 2024 at 12:17.

Finishing
Friday
Details
View Map
Share
Follow
Reading Road

Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Reading Road, South Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 16 Dec 2024 at 08:12.

Finishing
Friday
Details
View Map
Share
Follow
Birchington Avenue

Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Birchington Avenue, South Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 16 Dec 2024 at 08:13.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bewicke Road Lane At Rear Of 2-32

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Sep 2024 at 08:40.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bewicke Road Lane At Rear Of 2-32

Northumbrian Water are carrying out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:06 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 09:06.

North Tyneside Council logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Ridley Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ridley Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:42.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
Whitehouse Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:08.

Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Mortimer Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Mortimer Road, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 14:56.

Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Mortimer Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Mortimer Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 15:18.

Between
24 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Milner Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Milner Street, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 December 2024 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 08:08.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Reading Road

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:31.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Reading Road

Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:40.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Birchington Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:26.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Birchington Avenue

Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:38.

North Tyneside Council logo
LONG TERM
Between
27 Dec 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:08.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:03.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:58.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:50.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:05.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:00.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:04.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Coast Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Coast Road, North Tyneside.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
West Percy Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Bird Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bird Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Brewhouse Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Brewhouse Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 22 Oct 2024 at 13:51.

Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out roadworks on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 09:38.

LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Follow
Pier View

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Pier View, Roker, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 10 Jun 2024 at 09:49.

LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Follow
Roker Terrace

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Roker Terrace, Roker, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 10 Jun 2024 at 09:11.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Sheridan Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Aug 2024 at 10:45.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Dame Flora Robson Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dame Flora Robson Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 08:45.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Wenlock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wenlock Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 13:49.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Wenlock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wenlock Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 08:29.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Stanhope Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Oct 2024 at 09:42.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Stanhope Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:02.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Stanhope Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:37.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Bbnts 11

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bbnts 11, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:59.

Northumbrian Water logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Rear Of Vespasian Avenue And Julian Avenue

Northumbrian Water are proposing to carry out Permanent reinstatement on Rear Of Vespasian Avenue And Julian Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:07.

Northumbrian Water logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Rear Of Vespasian Avenue And Julian Avenue

Northumbrian Water are proposing to carry out Remedial works on Rear Of Vespasian Avenue And Julian Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:05.

Virgin Media logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
York Road

Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 14:59.

Virgin Media logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
York Road

Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Dec 2024 at 13:35.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Boldon Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Boldon Lane, Cleadon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 15:41.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Boldon Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Boldon Lane, Cleadon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:08.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Saville Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out Highway improvement works on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 09:36.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out Highway improvement works on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 12:30.

North Tyneside Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wark Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 17 Dec 2024 at 15:23.

North Tyneside Council logo
Between
29 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wark Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 13 Nov 2024 at 10:21.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Beckenham Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Beckenham Avenue, East Boldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 11:19.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Beckenham Avenue

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Beckenham Avenue, East Boldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 10:08.

Northumbrian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Rear Of Birchington Avenue And Reading Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 12:52.

Northumbrian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Rear Of Birchington Avenue And Reading Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 14:02.

Northumbrian Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Campville Lane At Side And Rear Of 1-23

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Campville Lane At Side And Rear Of 1-23, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 11:52.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Western Approach

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Western Approach, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 09:58.

Northumbrian Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Princes Street Lane At Side And Rear Of 52-78

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princes Street Lane At Side And Rear Of 52-78, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 12:19.

Northern Gas Networks logo
Between
14 and 27 Feb 2025
Details
View Map
Share
Follow
North Guards

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on North Guards, Whitburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:15.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Railway Terrace Lane At Rear Of 35-public House

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Terrace Lane At Rear Of 35-public House, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 15:24.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Saville Street West

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:46.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Saville Street West

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:54.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Little Bedford Street Lane At Side And Rear Of Warehouses

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 February 2025 and run through until 9 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:51.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Little Bedford Street Lane At Side And Rear Of Warehouses

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Dec 2024 at 15:52.

Northumbrian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Albert Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Albert Road, Millfield, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Dec 2024 at 11:32.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 14 May 2025
Details
View Map
Share
Follow
Dame Flora Robson Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dame Flora Robson Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:28.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Colchester Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colchester Street, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:25.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Wenlock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wenlock Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:45.

LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Boldon Lane

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Boldon Lane, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 14:25.

LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Boldon Lane

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Boldon Lane, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 14:58.

South Tyneside Council logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Rear Of Baring Street And Salmon Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Rear Of Baring Street And Salmon Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 27 Nov 2024 at 11:37.

North Tyneside Council logo
LONG TERM
Between
6 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Tanners Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Tanners Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

North Tyneside Council logo
LONG TERM
Between
6 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Bbnts 32

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:01.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
South Shields Footpath 413

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:05.

Northumbrian Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Links Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Links Avenue, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 10:53.

Northumbrian Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Broadway

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 10:56.

Northumbrian Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Rear Of St Mary's Terrace And Natley Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of St Mary's Terrace And Natley Avenue, East Boldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 10:24.

Northumbrian Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
The Broadway

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Dec 2024 at 17:44.


Roadworks Map near to Fulwell Avenue, SOUTH SHIELDS, NE34 7DF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fulwell Avenue, SOUTH SHIELDS, NE34 7DF (34 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South Tyneside Council logo
MARSDEN LANE 
(0.1 miles)
South Tyneside Council
Highway repair and maintenance works - Carriageway -
Complete
12 Dec 2024 08:00 - 17 Dec 2024 11:25
0.1
Details
Share
2
South Tyneside Council logo
TANFIELD GARDENS 
(0.2 miles)
South Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Dec 2024 10:30 - 14:15
0.2
Details
Share
3
South Tyneside Council logo
MAJOR
  
HURWORTH AVENUE 
(0.2 miles)
South Tyneside Council
Highway repair and maintenance works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 2 Dec 2024 - 13 Jan 2025
0.2
Details
Share
Follow
4
South Tyneside Council logo
MAJOR
  
HURWORTH AVENUE 
(0.2 miles)
South Tyneside Council
Highway repair and maintenance works - Footway, Verge - Some carriageway incursion
In Progress
Since: 2 Dec 2024 08:00
(Scheduled: 2 Dec 2024 - 13 Jan 2025)
0.2
Details
Share
Follow
5
Virgin Media logo
FRENCHMANS WAY 
(0.3 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 20 Dec 2024
0.3
Details
Share
Follow
6
Northern Gas Networks logo
MAJOR
  
PRINCE EDWARD ROAD 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 7 Feb 2025)
0.3
Details
Share
7
Northern Gas Networks logo
MAJOR
  
PRINCE EDWARD ROAD 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 9 Dec 2024 - 7 Feb 2025
0.3
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
BRADLEY AVENUE 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 2 Dec 2024 14:25
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
9
Northern Gas Networks logo
MAJOR
  
EAST AVENUE 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 2 Dec 2024 14:30
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
10
South Tyneside Council logo
CHEVIOT ROAD 
(0.4 miles)
South Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Dec 2024 10:30 - 17 Dec 2024 12:10
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.