ROADWORKS SUMMARY
Wardle Drive, CRAMLINGTON, NE23 7DB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wardle Drive, NE23 7DB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wardle Drive, CRAMLINGTON, NE23 7DB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wardle Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Tyneside Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Coast Road

North Tyneside Council are carrying out Highway repair and maintenance works on Coast Road, North Tyneside.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 15:38 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:52.

Northern Gas Networks logo
LONG TERM
Between
23 Sep 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 10:58.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 14:41.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Benfield Road

Newcastle City Council are proposing to carry out Section 50 on Benfield Road, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 18 Sep 2024 at 10:39.

North Tyneside Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
The Silverlink North

North Tyneside Council are carrying out Section 50 on The Silverlink North, Wallsend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 16:59.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
South Newsham Road

Northumberland County Council are carrying out Works for road purposes on South Newsham Road, Blyth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 12 Dec 2024 at 16:08.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Benfield Road

Newcastle City Council are carrying out Section 50 on Benfield Road, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 12 Nov 2024 at 10:03.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
South Newsham Road

Northumberland County Council are proposing to carry out Works for Rail Purposes on South Newsham Road, Blyth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 3 Oct 2024 at 13:24.

LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Chase Farm Drive

Northumberland County Council are carrying out Works for Rail Purposes on Chase Farm Drive, Blyth.

These works are categorised as Major.

The works started on 12 November 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 12 Nov 2024 at 09:20.

LONG TERM
Between
3 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Front Street

Northumberland County Council are proposing to carry out Works for Rail Purposes on Front Street, Bebside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 24 Oct 2024 at 10:42.

LONG TERM
Between
3 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Front Street

Northumberland County Council were proposing to carry out Works for Rail Purposes on Front Street, Bebside.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 21 Nov 2024 at 12:19.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Seghill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2024 at 13:03.

Northern Gas Networks logo
LONG TERM
Between
7 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
U9510 Ryal Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ryal Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 November 2024 and could run through until 24 January 2025. The works will impact the footway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 10:43.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
U9510 Ryal Close Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Ryal Close Footway, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 November 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 09:54.

Northern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 16:23.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
U9510 Craster Close Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Craster Close Footway, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 22 November 2024 at 14:00 and could run through until 24 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:47.

Northern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
U9510 Footway Outside 3-7 Bothal Close

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Footway Outside 3-7 Bothal Close, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 22 November 2024 at 14:00 and could run through until 19 December 2024. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:01.

Northern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
U9510 Ryal Close Bothal Close Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Ryal Close Bothal Close Footway, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 22 November 2024 at 14:00 and could run through until 19 December 2024. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:01.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
U9510 Ryal Close Footway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Ryal Close Footway, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 14:18.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Northcott Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:19.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Nov 2024 at 14:25.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are carrying out Utility asset works on The Avenue, Seaton Delaval.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:10 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Dec 2024 at 12:56.

North Tyneside Council logo
LONG TERM
Between
4 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
New York Road

North Tyneside Council are proposing to carry out Section 50 on New York Road, New York, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 14:48.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Monkseaton, Whitley Bay.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:41 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 13:37.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
U9510 Footway Outside 17-24 Bothal Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Footway Outside 17-24 Bothal Close, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 1 Jul 2024 at 17:09.

Northern Gas Networks logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
U9510 Footway Outside 17-24 Bothal Close

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Footway Outside 17-24 Bothal Close, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 10 December 2024 at 07:30 and could run through until 13 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:50.

North Tyneside Council logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Houxty Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Houxty Road, Wellfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.

North Tyneside Council logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Kielder Place

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kielder Place, Wellfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
U9510 Albion Way Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Albion Way Footway, Blyth.

The works started on 12 December 2024 at 11:19 and could run through until 23 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 14:30.

Northern Gas Networks logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Westfield Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Westfield Drive, Gosforth, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 21:20 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 14:33.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
Whitehouse Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:08.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
Holystone Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Holystone Drive, Holystone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:29.

North Tyneside Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eastfield Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:30.

Northern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
U9510 Ingoe Close Footway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Footway, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 17 January 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:48.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Elmfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Elmfield Road, Gosforth, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 11:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:01.

North Tyneside Council logo
Between
27 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Benton Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 09:20.

North Tyneside Council logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Benton Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 09:20.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Dene Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dene Crescent, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:15.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 May 2025
Details
View Map
Share
Follow
Station Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Station Road North, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:14.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Mullen Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Mullen Road, High Farm, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Coast Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Coast Road, North Tyneside.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
South Croft

North Tyneside Council are proposing to carry out Highway repair and maintenance works on South Croft, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
East Bailey

North Tyneside Council are proposing to carry out Highway repair and maintenance works on East Bailey, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Garth Sixteen

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Sixteen, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:24.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Beacon Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Beacon Drive, Wideopen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Oct 2024 at 09:10.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rayleigh Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rayleigh Drive, Wideopen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:08.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Dudley To Fordley Link Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dudley To Fordley Link Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:22.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Link Road Between B1505 Roundabout And A189 Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Link Road Between B1505 Roundabout And A189 Roundabout, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Front Street, Annitsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.

Northern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
U9510 Ingoe Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 11:25.

Northern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
U9510 Ingoe Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 12:16.

Northern Gas Networks logo
LONG TERM
Between
3 Jan and 20 Feb 2025
Details
View Map
Share
Northcott Gardens

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.

Northern Powergrid (Northeast) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 12:56.

Northern Powergrid (Northeast) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 08:29.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Monkseaton Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:23.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Monkseaton Drive

Northern Powergrid (Northeast) were proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 11:49.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
The Chesters

Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:24.

Northumbrian Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 10:14.

Northumbrian Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 16:20.

Northumbrian Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Avenue Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Avenue Road, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 16:16.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
U9510 Ingoe Close Craster Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Craster Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 1 Jul 2024 at 17:19.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
U9510 Ingoe Close Craster Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Ingoe Close Craster Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:13.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
U9510 Craster Close Footway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Craster Close Footway, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:50.

LONG TERM
Between
6 Jan and 30 May 2025
Details
View Map
Share
Follow
Front Street

Northumberland County Council are proposing to carry out Works for road purposes on Front Street, Bebside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 11:05.

LONG TERM
Between
7 Jan and 30 May 2025
Details
View Map
Share
Follow
Front Street

Northumberland County Council are proposing to carry out Works for road purposes on Front Street, Bebside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 5 Dec 2024 at 08:20.

Newcastle City Council logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Sanderson Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sanderson Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Dec 2024 at 09:11.

Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
A189 Spine Road Moor Farm To Kitty Brewster Bridge

Northumberland County Council are proposing to carry out Works for Rail Purposes on A189 Spine Road Moor Farm To Kitty Brewster Bridge, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.

This roadwork event was last updated by Northumberland County Council on 17 Dec 2024 at 16:22.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Whitefield Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Whitefield Terrace, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 11:25.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Balmoral Terrace

Northumbrian Water are proposing to carry out Remedial works on Balmoral Terrace, South Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 09:38.

Newcastle City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 15 Oct 2024 at 08:41.

Newcastle City Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 09:05.

Newcastle City Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Broadway East

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Broadway East, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:51.

Northern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
U9510 Footway Outside 3-7 Bothal Close

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Footway Outside 3-7 Bothal Close, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:52.

Northern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
U9510 Ryal Close Bothal Close Footway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9510 Ryal Close Bothal Close Footway, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:51.

Newcastle City Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Broadway East

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Broadway East, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 22 Oct 2024 at 14:40.

North Tyneside Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Earsdon Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Earsdon Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 30 Oct 2024 at 09:06.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bedford Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bedford Avenue, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 26 Nov 2024 at 10:21.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Barrass Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrass Avenue, Seghill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:20.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thirston Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirston Drive, Mayfield Dale, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:16.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thirston Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirston Drive, Mayfield Dale, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:28.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Village Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Village Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:39.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
U9555 U9573 Parkside Cycle Track

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9555 U9573 Parkside Cycle Track, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 18:37.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
U9555 U9573 Parkside Cycle Track

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9555 U9573 Parkside Cycle Track, Cramlington.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 13:57.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
U9510 Craster Close Budle Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Craster Close Budle Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:02.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
U9510 Budle Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Budle Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:03.

North Tyneside Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Stanton Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Shiremoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Nov 2024 at 10:48.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Cavendish Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 08:44.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Northumbrian Water are proposing to carry out Remedial works on Mayfield Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 11:57.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 11:39.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Turnberry Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:04.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Turnberry Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:30.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
U9562 Footway Outside 77-104 Thirston Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:57.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
U9562 Footway Outside 77-104 Thirston Drive

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:21.

Northumbrian Water logo
Between
5 and 9 Feb 2025
Details
View Map
Share
Follow
Coach House Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coach House Lane, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 15:05.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:06.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Garth Twenty Four

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Twenty Four, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:53.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:25.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:05.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cranham Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Cranham Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:55.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Alderley Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Alderley Drive, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ashley Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ashley Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Blyth Valley Footpath 123

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Blyth Valley Footpath 123, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:59.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Mayfield Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Avenue, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:09.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Feb and 25 Mar 2025
Details
View Map
Share
Follow
Kings Road South

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kings Road South, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Nov 2024 at 09:18.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Young Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Young Road, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Nov 2024 at 09:21.

Northumbrian Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Holyfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holyfields, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Monkseaton Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Dec 2024 at 13:13.

Northern Powergrid (Northeast) logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
The Chesters

Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Dec 2024 at 09:30.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Follow
B1505 Sea View Villas To Shankhouse

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on B1505 Sea View Villas To Shankhouse, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:23.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Norham Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Norham Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 09:51.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Norham Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.

Northumbrian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Edwins Avenue South Lane At Rear Of 2-26

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Edwins Avenue South Lane At Rear Of 2-26, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:16.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:26.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Fern Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:31.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Manor House Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Manor House Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:28.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Queens Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Queens Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:24.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Salisbury Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Nov 2024 at 18:24.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Salisbury Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 11:47.

Between
3 and 7 Mar 2025
Details
View Map
Share
Ripon Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 10:03.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Ripon Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 10:04.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Deuchar Street

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Deuchar Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:16.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kimberley Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Kimberley Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:15.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 08:01.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 12:06.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Holly Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Holly Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:22.

Northumbrian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Cartington Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cartington Terrace, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 13:21.

Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Gowan Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Gowan Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 09:13.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Buston Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Buston Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:19.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Angus Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Angus Close, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 07:57.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
A192 Laverock Hall To Horton

Northumberland County Council are proposing to carry out Works for road purposes on A192 Laverock Hall To Horton, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumberland County Council on 2 Dec 2024 at 07:57.

Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 13:09.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Northumberland County Council are proposing to carry out Works for road purposes on Nelson Road, Nelson Park, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 09:43.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Northumberland County Council are proposing to carry out Works for road purposes on Nelson Road, Nelson Park, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 17 Dec 2024 at 16:59.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Moorland Way

Northumberland County Council are proposing to carry out Works for road purposes on Moorland Way, Nelson Industrial Estate, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 09:40.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Moorland Way

Northumberland County Council are proposing to carry out Works for road purposes on Moorland Way, Nelson Industrial Estate, Cramlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 17 Dec 2024 at 16:57.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Graham Park Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Graham Park Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:16.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 30 May 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:13.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Dunsdale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunsdale Drive, Eastfield Vale, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:35.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 7 May 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:17.


Roadworks Map near to Wardle Drive, CRAMLINGTON, NE23 7DB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wardle Drive, CRAMLINGTON, NE23 7DB (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
EMERGENCY
  
GREEN CRESCENT 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 12 Dec 2024 12:32
(Scheduled: 12 Dec 2024 - 23 Dec 2024)
0.8
Details
Share
Follow
2
Northern Gas Networks logo
MAJOR
  
MILL LANE 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 4 Nov 2024 09:00
(Scheduled: 4 Nov 2024 - 10 Jan 2025)
0.8
Details
Share
Follow
3
Northern Gas Networks logo
MAJOR
  
MILL LANE 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Two-way signals
Planned
Scheduled: 4 Nov 2024 - 10 Jan 2025
0.8
Details
Share
Follow
4
Northern Gas Networks logo
MAJOR
  
FRONT STREET 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 21 Feb 2025)
0.9
Details
Share
5
Northern Gas Networks logo
MAJOR
  
FRONT STREET 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 24 Jan 2025
0.9
Details
Share
Follow
6
Northern Gas Networks logo
MAJOR
  
FRONT STREET 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 18 Nov 2024 11:00
(Scheduled: 18 Nov 2024 - 24 Jan 2025)
0.9
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
BURNSIDE CLOSE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 2 Dec 2024 13:30
(Scheduled: 2 Dec 2024 - 24 Jan 2025)
0.9
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
BURNSIDE CLOSE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 2 Dec 2024 - 24 Jan 2025
0.9
Details
Share
Follow
9
Northern Gas Networks logo
MAJOR
  
MADDISON GARDENS 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 17 Jan 2025)
0.9
Details
Share
10
Northern Gas Networks logo
MAJOR
  
MADDISON GARDENS 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 25 Nov 2024 - 20 Dec 2024
0.9
Details
Share
Follow