ROADWORKS SUMMARY
Oak Terrace, BLAYDON-ON-TYNE, NE21 5HL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Oak Terrace, NE21 5HL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Oak Terrace, BLAYDON-ON-TYNE, NE21 5HL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oak Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Road Leading To Hamsterley Hall

Durham County Council are carrying out Highway repair and maintenance works on Road Leading To Hamsterley Hall, Hamsterley Mill.

The works should not impact the carriageway.

The works started on 5 February 2021 at 09:00 and could run through until 31 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Durham County Council on 5 Mar 2024 at 14:56.

Newcastle City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Pilgrim Street

Newcastle City Council are carrying out Highway improvement works on Pilgrim Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2023 at 07:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Oct 2024 at 11:39.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Sycamore Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Sycamore Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Nov 2024 at 14:37.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Saint Thomas Street

Newcastle City Council are carrying out Highway repair and maintenance works on Saint Thomas Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:39.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Richardson Road

Newcastle City Council are carrying out Highway repair and maintenance works on Richardson Road, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:36.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Victoria Road, Spital Tongues, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Newcastle City Council on 7 Mar 2024 at 11:59.

Newcastle City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Brunswick Place

Newcastle City Council are carrying out Highway repair and maintenance works on Brunswick Place, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 3 Jul 2024 at 14:23.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Tyne Bridge

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Tyne Bridge, Gateshead Central, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:04.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
Heath Court

Newcastle City Council are carrying out Highway repair and maintenance works on Heath Court, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:12.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:11.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Central Motorway East A167m

Newcastle City Council are carrying out Highway repair and maintenance works on Central Motorway East A167m, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:56.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Gateshead Highway To Askew Road And Quaysgate To Park Lane

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway To Askew Road And Quaysgate To Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:07.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Tyne Bridge

Newcastle City Council are carrying out Highway repair and maintenance works on Tyne Bridge, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:53.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 21:00.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
New Bridge Street

Newcastle City Council are carrying out Highway repair and maintenance works on New Bridge Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:59.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Bottle Bank

Gateshead Metropolitan Borough Council are carrying out Highway improvement works on Bottle Bank, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 07:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Jan 2024 at 14:45.

Gateshead Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Dunsmuir Grove

Gateshead Metropolitan Borough Council are carrying out Section 50 on Dunsmuir Grove, Bensham, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 11:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 Aug 2024 at 09:28.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Askew Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Askew Road, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:51 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 17 Oct 2024 at 15:05.

Northern Gas Networks logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Whickham Highway

Northern Gas Networks are carrying out Utility repair and maintenance works on Whickham Highway, Whickham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 10:15 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:21.

Newcastle City Council logo
LONG TERM
Until
15 Jun 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:23.

Newcastle City Council logo
LONG TERM
Until
15 Jun 2028
Details
View Map
Share
Follow
Lombard Street

Newcastle City Council are carrying out Highway repair and maintenance works on Lombard Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:24.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Queen Street

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:25.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Akenside Hill

Newcastle City Council are carrying out Highway repair and maintenance works on Akenside Hill, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:26.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Park Terrace

Newcastle City Council are proposing to carry out Highway improvement works on Park Terrace, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway improvement works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
26 Aug 2024 and 10 Jul 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 10 July 2028. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 1 Jul 2024 at 08:21.

Northern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Kingsway

Northern Gas Networks are carrying out Utility repair and maintenance works on Kingsway, Sunniside, Whickham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 08:46.

Newcastle City Council logo
LONG TERM
Until
22 Apr 2025
Details
View Map
Share
Follow
Elswick Road

Newcastle City Council are carrying out Highway repair and maintenance works on Elswick Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 2 Sep 2024 at 08:46.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Kingsway South

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Kingsway South, Team Valley, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 08:04 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 8 Oct 2024 at 08:23.

Newcastle City Council logo
LONG TERM
Until
21 Jul 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2024 at 20:00 and could run through until 21 July 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 9 Sep 2024 at 09:13.

Newcastle City Council logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
North Walbottle Road

Newcastle City Council were proposing to carry out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 12 Nov 2024 at 12:22.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
7 Oct and 13 Dec 2024
Details
View Map
Share
Jackson Street

Gateshead Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Jackson Street, Gateshead Central, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 19 Aug 2024 at 09:35.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 12:54.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 14:13.

Northern Gas Networks logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 11:13.

Northern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 08:04.

Northern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 13:23.

Northern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are carrying out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 14:10 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 14:31.

Northern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Silver Lonnen

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Lonnen, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 10:18.

Newcastle City Council logo
LONG TERM
Between
19 Oct 2024 and 13 Feb 2025
Details
View Map
Share
Follow
City Road

Newcastle City Council are proposing to carry out Highway improvement works on City Road, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 13 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 8 Oct 2024 at 10:35.

LONG TERM
Between
21 Oct and 18 Dec 2024
Details
View Map
Share
Follow
Parkwood Avenue

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Parkwood Avenue, West Wylam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 31 Jul 2024 at 16:58.

Northern Gas Networks logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 14:41.

Northern Gas Networks logo
LONG TERM
Between
28 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Riding Barns Way Rear 1 - 35 Footpaths

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Riding Barns Way Rear 1 - 35 Footpaths, Sunniside, Whickham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 6 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 May 2024 at 08:35.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Oct 2024 and 25 Jan 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Benwell Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Aug 2024 at 10:25.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Oct 2024 and 25 Jan 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Benwell Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Sep 2024 at 09:40.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Balfour Street

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Balfour Street, Bensham, Gateshead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 1 Nov 2024 at 07:42.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Brighton Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Brighton Road, Bensham, Gateshead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 1 Nov 2024 at 07:43.

Gateshead Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Highfield Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Highfield Road, Highfield, Rowlands Gill.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:15 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 Nov 2024 at 09:59.

Newcastle City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Stamfordham Road

Newcastle City Council are proposing to carry out Highway improvement works on Stamfordham Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 22 Oct 2024 at 08:51.

Newcastle City Council logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Stamfordham Road

Newcastle City Council are carrying out Highway improvement works on Stamfordham Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 12 Nov 2024 at 09:26.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 15:51.

Northern Gas Networks logo
LONG TERM
Until
29 Jan 2025
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are carrying out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:22.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Wolseley Close

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Wolseley Close, Redheugh, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 07:52.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Askew Road West

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Askew Road West, Teams, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 07:51.

Northumbrian Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Market Lane From Hexham Road To Hollinside Road

Northumbrian Water are carrying out Utility repair and maintenance works on Market Lane From Hexham Road To Hollinside Road, Swalwell, Whickham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 13:27 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 26 Nov 2024 at 12:47.

Gateshead Metropolitan Borough Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Handy Drive

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Handy Drive, Metro Centre, Whickham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 20:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 Nov 2024 at 08:41.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Market Lane From Hexham Road To Hollinside Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Market Lane From Hexham Road To Hollinside Road, Swalwell, Whickham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:43 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 10:21.

Northern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Sidney Grove

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sidney Grove, Bensham, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:09.

Northern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Derwentwater Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Derwentwater Road, Teams, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:09.

Northern Powergrid (Northeast) logo
LONG TERM
Between
18 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 07:58.

Northern Powergrid (Northeast) logo
LONG TERM
Between
18 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Benwell Lane

Northern Powergrid (Northeast) were proposing to carry out New service connection on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Nov 2024 at 14:17.

Northern Powergrid (Northeast) logo
LONG TERM
Between
18 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Benwell Lane

Northern Powergrid (Northeast) were proposing to carry out New service connection on Benwell Lane, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 09:50.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Durham Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Durham Road, Low Fell, Gateshead.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:34 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 13:11.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Kingsway South

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kingsway South, Team Valley, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Aug 2024 at 09:11.

Northern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Northumbria Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumbria Walk, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 12:51.

Newcastle City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Grainger Park Road

Newcastle City Council are carrying out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 08:21.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
School Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on School Lane, Byermoor, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 15:41.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
School Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on School Lane, Byermoor, Whickham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 15:36.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
School Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on School Lane, Byermoor, Whickham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 15:37.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
School Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on School Lane, Byermoor, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 15:46.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Dunston Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dunston Bank, Dunston Hill, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 6 Sep 2024 at 13:53.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Dunston Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dunston Bank, Dunston Hill, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 9 Sep 2024 at 08:12.

Northumbrian Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Abinger Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Abinger Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Oct 2024 at 08:10.

Northumbrian Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Abinger Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Abinger Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 11:20.

Northumbrian Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Mansfield Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mansfield Street, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 08:11.

Northumbrian Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Mansfield Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mansfield Street, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 08:55.

Newcastle City Council logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
New Mills

Newcastle City Council are proposing to carry out Highway repair and maintenance works on New Mills, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 22 Nov 2024 at 10:57.

Newcastle City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Walter Terrace

Newcastle City Council were proposing to carry out Highway repair and maintenance works on Walter Terrace, Arthurs Hill, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 9 Oct 2024 at 11:21.

Newcastle City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Walter Terrace

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Walter Terrace, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 2 Oct 2024 at 14:26.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Pilton Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Sep 2024 at 12:53.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Pilton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Sep 2024 at 13:21.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Pilton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 10:13.

Newcastle City Council logo
LONG TERM
Between
6 Dec 2024 and 22 Apr 2025
Details
View Map
Share
Follow
Grainger Park Road

Newcastle City Council are proposing to carry out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 22 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 13 Sep 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Crawcrook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawcrook Lane, Crawcrook, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 09:04.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Stannerford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stannerford Road, Clara Vale, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 09:03.

Northern Powergrid (Northeast) logo
LONG TERM
Between
17 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Condercum Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Condercum Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Aug 2024 at 10:13.

Northern Powergrid (Northeast) logo
LONG TERM
Between
17 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Condercum Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Condercum Road, Elswick, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 16 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 13:48.

Northern Powergrid (Northeast) logo
Between
17 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Condercum Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Condercum Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 11:17.

Newcastle City Council logo
Between
18 and 24 Dec 2024
Details
View Map
Share
Follow
Walter Terrace

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Walter Terrace, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Sep 2024 at 14:40.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Birch Road

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Birch Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Nov 2024 at 14:38.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Sunderland Road From Shields Road To Dual Carriageway Link To Sunderland Road A167 Roundabout

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunderland Road From Shields Road To Dual Carriageway Link To Sunderland Road A167 Roundabout, Gateshead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:10.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:57.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Callerton Lane Ends

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Callerton Lane Ends, Ponteland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 10:03.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Callerton Lane Ends

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Callerton Lane Ends, Ponteland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:59.

Northumbrian Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Spen Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Spen Lane, High Spen, Rowlands Gill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 4 Oct 2024 at 10:30.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Camborne Grove And Prince Consort Road Nos 191 To 243 Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Camborne Grove And Prince Consort Road Nos 191 To 243 Back, Shipcote, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 11:13.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Jackson Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Jackson Street, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 15 Aug 2024 at 15:30.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Jackson Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Jackson Street, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Aug 2024 at 07:54.

Newcastle City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Westmorland Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 30 Sep 2024 at 11:22.

Newcastle City Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Riversdale Way

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Riversdale Way, Newburn Haugh Industrial Estate, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 07:35.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Lesbury Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lesbury Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 13:05.

Newcastle City Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Firfield Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 11:15.

G2 Energy IDNO logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Newburn Bridge Road

G2 Energy IDNO are proposing to carry out New service connection on Newburn Bridge Road, Stella, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 24 Sep 2024 at 08:05.

G2 Energy IDNO logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Newburn Bridge Road

G2 Energy IDNO are proposing to carry out New service connection on Newburn Bridge Road, Stella, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 26 Nov 2024 at 10:14.

Northumbrian Water logo
Between
8 and 12 Jan 2025
Details
View Map
Share
Follow
Oakwood Gardens

Northumbrian Water are proposing to carry out Permanent reinstatement on Oakwood Gardens, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 11:01.

Northumbrian Water logo
Between
8 and 12 Jan 2025
Details
View Map
Share
Follow
Larchwood Gardens

Northumbrian Water are proposing to carry out Permanent reinstatement on Larchwood Gardens, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 11:00.

Northumbrian Water logo
Between
8 and 12 Jan 2025
Details
View Map
Share
Follow
Caledonia

Northumbrian Water are proposing to carry out Permanent reinstatement on Caledonia, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 12:04.

Newcastle City Council logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Binswood Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Binswood Avenue, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 07:33.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Well Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Well Lane, Low Fell, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 24 Sep 2024 at 09:51.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodburn Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodburn Gardens, Dunston Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:20.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lavender Gardens And Lilac Gardens Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lavender Gardens And Lilac Gardens Back, Low Fell, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 9 Sep 2024 at 09:37.

Gateshead Metropolitan Borough Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Rectory Lane, Whickham Central, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Nov 2024 at 14:14.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:14.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 10:32.

Newcastle City Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Axwell Park View

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Axwell Park View, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 08:20.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Wellington Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 13:09.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are proposing to carry out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 21 Nov 2024 at 10:06.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Firfield Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:54.

Newcastle City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 15 Oct 2024 at 08:41.

Newcastle City Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 09:05.

Northern Powergrid (Northeast) logo
Between
14 and 27 Jan 2025
Details
View Map
Share
Follow
Cornmoor Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Cornmoor Road, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Oct 2024 at 10:50.

Northern Powergrid (Northeast) logo
Between
14 and 27 Jan 2025
Details
View Map
Share
Follow
Cornmoor Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Cornmoor Road, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Oct 2024 at 11:16.

Gateshead Metropolitan Borough Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Baden Powell Street And Kitchener Street Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Baden Powell Street And Kitchener Street Back, Deckham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 08:28.

Gateshead Metropolitan Borough Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Baden Powell Street And Kitchener Street Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Baden Powell Street And Kitchener Street Back, Deckham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 11:26.

Gateshead Metropolitan Borough Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Old Durham Road Nos 377 - 449 Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Durham Road Nos 377 - 449 Back, Deckham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 08:22.

Gateshead Metropolitan Borough Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Old Durham Road Nos 377 - 449 Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Durham Road Nos 377 - 449 Back, Deckham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 11:25.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Hole Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hole Lane, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 13:17.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Bute Road North And North View Back Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bute Road North And North View Back Lane, High Spen, Rowlands Gill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 Oct 2024 at 08:05.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dryden Road Nos 87 To 127 And Laburnum Gardens Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dryden Road Nos 87 To 127 And Laburnum Gardens Back, Low Fell, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 12:05.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shafto Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Shafto Street, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Oct 2024 at 06:31.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shafto Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Shafto Street, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Oct 2024 at 12:04.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shafto Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Shafto Street, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Oct 2024 at 06:25.

Newcastle City Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Binswood Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Binswood Avenue, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 07:34.

Gateshead Metropolitan Borough Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Armstrong Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Armstrong Street, Racecourse Estate, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Oct 2024 at 08:28.

Gateshead Metropolitan Borough Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Armstrong Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Armstrong Street, Racecourse Estate, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 17 Oct 2024 at 09:51.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jan 2025
Details
View Map
Share
Follow
Spencers Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Spencers Bank, Swalwell, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Sep 2024 at 07:56.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jan 2025
Details
View Map
Share
Follow
Spencers Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Spencers Bank, Swalwell, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Sep 2024 at 08:37.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Orchard Close

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Orchard Close, Rowlands Gill Central, Rowlands Gill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 14:07.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Saltwell Road Back East Side From Bensham Road To Westminster Street

BT are proposing to carry out Utility asset works on Saltwell Road Back East Side From Bensham Road To Westminster Street, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Oct 2024 at 13:13.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Kingsley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kingsley Terrace, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 12:49.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 06:20.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 13:40.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 11:27.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 11:46.

BT logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Chandos Street And Raby Street Back

BT are proposing to carry out Utility asset works on Chandos Street And Raby Street Back, Shipcote, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Oct 2024 at 15:39.

Gateshead Metropolitan Borough Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Winlaton Mill, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 3 Oct 2024 at 08:17.

Gateshead Metropolitan Borough Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Winlaton Mill, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 Oct 2024 at 09:13.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Holmside Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmside Avenue, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 08:04.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Ellison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 08:03.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hyde Park Street Nos 65 To 115 And Whitehall Road Nos 229 To 275 Back

BT are proposing to carry out Utility asset works on Hyde Park Street Nos 65 To 115 And Whitehall Road Nos 229 To 275 Back, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 12:48.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Gladstone Terrace Nos 13 To 39 And Lincoln Street Back

BT are proposing to carry out Utility asset works on Gladstone Terrace Nos 13 To 39 And Lincoln Street Back, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 31 Oct 2024 at 09:39.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Prince Consort Road Nos 146 - 234 Back

BT are proposing to carry out Utility asset works on Prince Consort Road Nos 146 - 234 Back, Shipcote, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 31 Oct 2024 at 09:40.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sidney Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sidney Grove, Bensham, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 12:33.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Derwentwater Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Derwentwater Road, Teams, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:36.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Benton Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Benton Terrace, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Oct 2024 at 07:25.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Northumbrian Water are proposing to carry out Remedial works on Mayfield Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 11:57.

Northumbrian Water logo
Between
5 and 9 Feb 2025
Details
View Map
Share
Follow
Portland Terrace

Northumbrian Water are proposing to carry out Permanent reinstatement on Portland Terrace, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 07:23.

Northumbrian Water logo
Between
5 and 9 Feb 2025
Details
View Map
Share
Follow
Portland Terrace

Northumbrian Water are proposing to carry out Permanent reinstatement on Portland Terrace, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 13:28.

Northumbrian Water logo
Between
5 and 9 Feb 2025
Details
View Map
Share
Follow
Coach House Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coach House Lane, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 15:05.

Northumbrian Water logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Ellesmere Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 14:51.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Sunniside Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 13:43.

Northern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Teams Village Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Teams Village Access Road, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:30.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Wolseley Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wolseley Close, Redheugh, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:32.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Askew Road West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askew Road West, Teams, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:33.

Newcastle City Council logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:47.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Crawcrook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawcrook Lane, Crawcrook, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:14.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Stannerford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stannerford Road, Clara Vale, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:16.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Westfield Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 3 Oct 2024 at 08:24.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Westfield Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 Oct 2024 at 09:41.

Gateshead Metropolitan Borough Council logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Affleck Street And Claremont North Avenue Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Affleck Street And Claremont North Avenue Back, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 09:49.

Gateshead Metropolitan Borough Council logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Alexandra Road Nos 145 To 159 Back

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Alexandra Road Nos 145 To 159 Back, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 10:10.

Gateshead Metropolitan Borough Council logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Affleck Street And Havelock Terrace Back Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Affleck Street And Havelock Terrace Back Lane, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 10:17.

Gateshead Metropolitan Borough Council logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Claremont South Avenue

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Claremont South Avenue, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 09:10.

Murphy Power Distribution logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Blandford Square

Murphy Power Distribution were proposing to carry out New service connection on Blandford Square, Rye Hill, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 12:56.

Murphy Power Distribution logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Blandford Square

Murphy Power Distribution were proposing to carry out Utility asset works on Blandford Square, Rye Hill, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 15:12.

Newcastle City Council logo
Between
19 Feb and 5 Mar 2025
Details
View Map
Share
Follow
New Mills

Newcastle City Council are proposing to carry out Highway repair and maintenance works on New Mills, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Nov 2024 at 13:24.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 13 Jun 2025
Details
View Map
Share
Follow
Old Durham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 09:37.

Newcastle City Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 10:22.


Roadworks Map near to Oak Terrace, BLAYDON-ON-TYNE, NE21 5HL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Oak Terrace, BLAYDON-ON-TYNE, NE21 5HL (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
BETSEY PLACE, BLEACH GREEN 
(0.2 miles)
Virgin Media
Utility asset works - Carriageway - Some carriageway incursion
Complete
26 Nov 2024 09:47 - 13:00
0.2
Details
Share
2
Gateshead Metropolitan Borough Council logo
MAJOR
  
SYCAMORE ROAD, BLEACH GREEN 
(0.3 miles)
Gateshead Metropolitan Borough Council
Section 50 - Footway, Carriageway - Road closure
In Progress
Since: 2 Oct 2023 08:00
(Scheduled: 2 Oct 2023 - 31 Mar 2025)
0.3
Details
Share
Follow
3
Northumbrian Water logo
URGENT
  
WOODLANDS PARK DRIVE, AXWELL PARK 
(0.3 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
21 Nov 2024 14:33 - 26 Nov 2024 16:09
0.3
Details
Share
4
Northern Gas Networks logo
EMERGENCY
  
BLAYDON BANK, BLAYDON CENTRAL 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Complete
12 Nov 2024 10:51 - 26 Nov 2024 06:51
0.4
Details
Share
5
Northern Gas Networks logo
EMERGENCY
  
WYLAM VIEW, WINLATON 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Complete
13 Nov 2024 11:22 - 25 Nov 2024 12:09
0.4
Details
Share
6
Northumbrian Water logo
BURNLEY STREET AND HARRIET STREET BACK, BLAYDON CENTRAL 
(0.4 miles)
Northumbrian Water
Permanent reinstatement - Footway, Carriageway - Give and take
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.4
Details
Share
Follow
7
Northumbrian Water logo
HALF FIELDS ROAD, WINLATON 
(0.5 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.5
Details
Share
Follow
8
Northumbrian Water logo
URGENT
  
BLACKSTONE COURT, BLAYDON BURN 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
22 Nov 2024 09:37 - 10:13
0.7
Details
Share
9
Virgin Media logo
COLDSTREAM DRIVE, WINLATON 
(0.9 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
26 Nov 2024 13:44 - 14:24
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.