ROADWORKS SUMMARY
Fenwick Close, NEWCASTLE UPON TYNE, NE20 0BZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fenwick Close, NE20 0BZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fenwick Close, NEWCASTLE UPON TYNE, NE20 0BZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fenwick Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Gas Networks logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Stamfordham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 14:30.

Newcastle City Council logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
North Walbottle Road

Newcastle City Council were proposing to carry out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 12 Nov 2024 at 12:22.

Northern Gas Networks logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Stamfordham Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 14:35.

Northern Gas Networks logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 11:13.

LONG TERM
Between
21 Oct and 18 Dec 2024
Details
View Map
Share
Follow
Parkwood Avenue

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Parkwood Avenue, West Wylam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 31 Jul 2024 at 16:58.

Northern Gas Networks logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 14:41.

Northern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Stamfordham Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:23.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 26 Feb 2025
Details
View Map
Share
Follow
Stamfordham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:33.

Northern Gas Networks logo
LONG TERM
Until
29 Jan 2025
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are carrying out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:22.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 15:51.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Castlefields Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Castlefields Drive, Castlefields, Prudhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Aug 2024 at 09:36.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Castlefields Drive

Northern Powergrid (Northeast) were proposing to carry out New service connection on Castlefields Drive, Castlefields, Prudhoe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 09:30.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Princess Way

Northern Powergrid (Northeast) were proposing to carry out New service connection on Princess Way, Prudhoe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 12:12.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Princess Way

Northern Powergrid (Northeast) are proposing to carry out New service connection on Princess Way, Prudhoe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 15:26.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Princess Way

Northern Powergrid (Northeast) are proposing to carry out New service connection on Princess Way, Prudhoe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 12:11.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Princess Way

Northern Powergrid (Northeast) were proposing to carry out New service connection on Princess Way, Prudhoe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 09:45.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Princess Way

Northern Powergrid (Northeast) are proposing to carry out New service connection on Princess Way, Prudhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Aug 2024 at 09:18.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Castlefields Drive

Northern Powergrid (Northeast) were proposing to carry out New service connection on Castlefields Drive, Castlefields, Prudhoe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 12:12.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Castlefields Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Castlefields Drive, Castlefields, Prudhoe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 15:29.

Northern Powergrid (Northeast) logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Castlefields Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Castlefields Drive, Castlefields, Prudhoe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 13:28.

Newcastle City Council logo
Until
12 Dec 2024
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are carrying out Highway repair and maintenance works on North Walbottle Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:30 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 28 Nov 2024 at 11:43.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Pilton Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Sep 2024 at 12:53.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Pilton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Sep 2024 at 13:21.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Pilton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pilton Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 10:13.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Stannerford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stannerford Road, Clara Vale, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 09:03.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Crawcrook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawcrook Lane, Crawcrook, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 09:04.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Callerton Lane Ends

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Callerton Lane Ends, Ponteland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 10:03.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:57.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Callerton Lane Ends

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Callerton Lane Ends, Ponteland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:59.

Newcastle City Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Riversdale Way

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Riversdale Way, Newburn Haugh Industrial Estate, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 07:35.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Lesbury Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lesbury Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 13:05.

G2 Energy IDNO logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Newburn Bridge Road

G2 Energy IDNO are proposing to carry out New service connection on Newburn Bridge Road, Stella, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 24 Sep 2024 at 08:05.

G2 Energy IDNO logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Newburn Bridge Road

G2 Energy IDNO are proposing to carry out New service connection on Newburn Bridge Road, Stella, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 26 Nov 2024 at 10:14.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are proposing to carry out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 21 Nov 2024 at 10:06.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Wellington Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 13:09.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 11:46.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 11:27.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Station Road, Newburn, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 13:40.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 06:20.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Westfield Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 Oct 2024 at 09:41.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Westfield Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 3 Oct 2024 at 08:24.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Stannerford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stannerford Road, Clara Vale, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:16.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Crawcrook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawcrook Lane, Crawcrook, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:14.


Roadworks Map near to Fenwick Close, NEWCASTLE UPON TYNE, NE20 0BZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fenwick Close, NEWCASTLE UPON TYNE, NE20 0BZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
URGENT
  
C345 MEDBURN JUNCTION TO BLACK HEDDON JUNCTION 
(0.1 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway, Verge - Two-way signals
In Progress
Since: 28 Nov 2024 15:17
(Scheduled: 28 Nov 2024 - 4 Dec 2024)
0.1
Details
Share
Follow
2
Northumbrian Water logo
URGENT
  
C345 MEDBURN JUNCTION TO BLACK HEDDON JUNCTION 
(0.1 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 26 Nov 2024 11:59
(Scheduled: 26 Nov 2024 - 2 Dec 2024)
0.1
Details
Share
Follow
3
Northern Gas Networks logo
EMERGENCY
  
BEECH COURT, DARRAS HALL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 27 Nov 2024 18:00
(Scheduled: 27 Nov 2024 - 9 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.