ROADWORKS SUMMARY
Duckpool Lane, NEWCASTLE UPON TYNE, NE16 4HB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Duckpool Lane, NE16 4HB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Duckpool Lane, NEWCASTLE UPON TYNE, NE16 4HB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Duckpool Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Saint Thomas Street

Newcastle City Council are carrying out Highway repair and maintenance works on Saint Thomas Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:39.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Richardson Road

Newcastle City Council are carrying out Highway repair and maintenance works on Richardson Road, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:36.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Victoria Road, Spital Tongues, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Newcastle City Council on 7 Mar 2024 at 11:59.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Tyne Bridge

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Tyne Bridge, Gateshead Central, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:04.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
Heath Court

Newcastle City Council are carrying out Highway repair and maintenance works on Heath Court, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:12.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:11.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Central Motorway East A167m

Newcastle City Council are carrying out Highway repair and maintenance works on Central Motorway East A167m, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:56.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Gateshead Highway To Askew Road And Quaysgate To Park Lane

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway To Askew Road And Quaysgate To Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:07.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Tyne Bridge

Newcastle City Council are carrying out Highway repair and maintenance works on Tyne Bridge, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:53.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 21:00.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
New Bridge Street

Newcastle City Council are carrying out Highway repair and maintenance works on New Bridge Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:59.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Bottle Bank

Gateshead Metropolitan Borough Council are carrying out Highway improvement works on Bottle Bank, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 07:00 and could run through until 1 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 15 Apr 2025 at 12:38.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
Askew Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Askew Road, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:51 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 Feb 2025 at 08:19.

Newcastle City Council logo
LONG TERM
Until
15 Jun 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:23.

Newcastle City Council logo
LONG TERM
Until
15 Jun 2028
Details
View Map
Share
Follow
Lombard Street

Newcastle City Council are carrying out Highway repair and maintenance works on Lombard Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:24.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Queen Street

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:25.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Akenside Hill

Newcastle City Council are carrying out Highway repair and maintenance works on Akenside Hill, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:26.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Park Terrace

Newcastle City Council are proposing to carry out Highway improvement works on Park Terrace, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway improvement works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
26 Aug 2024 and 10 Jul 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 10 July 2028. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 1 Jul 2024 at 08:21.

Network Rail logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Heaton Park Road

Network Rail were proposing to carry out Works for Rail Purposes on Heaton Park Road, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Nov 2024 at 13:58.

Newcastle City Council logo
LONG TERM
Until
21 Jul 2028
Details
View Map
Share
Follow
Quayside

Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2024 at 20:00 and could run through until 21 July 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 9 Sep 2024 at 09:13.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Gateshead Highway Lower Level - Park Lane To Sunderland Road Roundabout

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Lower Level - Park Lane To Sunderland Road Roundabout, Gateshead Central, Gateshead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 15:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Mar 2025 at 08:28.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Gateshead Highway Upper Level

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Upper Level, Gateshead Central, Gateshead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 15:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Mar 2025 at 08:23.

Newcastle City Council logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are carrying out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 09:17 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 3 Jun 2025 at 13:32.

Northern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 07:30 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 13:04.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 13 Jun 2025
Details
View Map
Share
Old Durham Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 09:12.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 11:07.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 20 Jun 2025
Details
View Map
Share
Old Durham Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 09:33.

Northern Gas Networks logo
LONG TERM
Between
24 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Broad Chare

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Broad Chare, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:18.

Northern Gas Networks logo
LONG TERM
Between
24 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Broad Chare

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Broad Chare, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 11:09.

Northern Gas Networks logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Broad Chare

Northern Gas Networks are carrying out Utility repair and maintenance works on Broad Chare, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 08:09 and could run through until 27 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 08:09.

Northern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Quayside

Northern Gas Networks are carrying out Utility repair and maintenance works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 08:12 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:24.

Newcastle City Council logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Follow
City Road

Newcastle City Council are proposing to carry out Highway improvement works on City Road, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 06:51.

Newcastle City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway improvement works on City Road, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 3 Apr 2025 at 10:38.

Newcastle City Council logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Cut Bank

Newcastle City Council are proposing to carry out Highway improvement works on Cut Bank, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 4 Feb 2025 at 09:57.

Newcastle City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Cut Bank

Newcastle City Council are carrying out Highway improvement works on Cut Bank, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 28 Apr 2025 at 16:22.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 09:45 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 11:29.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Mar 2025 at 10:37.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Mar 2025 at 16:37.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Mar 2025 at 10:20.

Northumbrian Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pilgrim Street

Northumbrian Water are carrying out Utility repair and maintenance works on Pilgrim Street, Newcastle Upon Tyne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 April 2025 at 10:06 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 23 May 2025 at 08:55.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Footpath 3 Newcastle

Northern Powergrid (Northeast) are carrying out Utility asset works on Footpath 3 Newcastle, Newcastle Upon Tyne.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 28 April 2025 at 11:00 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jun 2025 at 07:36.

Northern Gas Networks logo
LONG TERM
Between
24 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 11:59.

Northern Gas Networks logo
LONG TERM
Between
24 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:42.

Northern Gas Networks logo
LONG TERM
Between
25 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 28 Apr 2025 at 09:22.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Booth Street Via Walker View Back To Rowlandson Street Footpath

Northumbrian Water are carrying out Utility repair and maintenance works on Booth Street Via Walker View Back To Rowlandson Street Footpath, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:30.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:29.

Northumbrian Water logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 4 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:28.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stainton Drive Footpaths

Northumbrian Water are carrying out Utility repair and maintenance works on Stainton Drive Footpaths, Felling Central, Felling.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 May 2025 at 17:00 and could run through until 6 June 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 10:27.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Shipcote Terrace

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Shipcote Terrace, Shipcote, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 09:14.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Birch Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Birch Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 Apr 2025 at 09:18.

Northern Gas Networks logo
LONG TERM
Between
29 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 10:10.

Northern Gas Networks logo
LONG TERM
Between
29 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 15 Apr 2025 at 12:31.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Denton Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Denton Road, Scotswood, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 09:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:14.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Burn Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 20 Feb 2025 at 13:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Burn Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 5 May 2025 at 10:47.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Liddells Fell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Liddells Fell Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 20 Feb 2025 at 13:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Liddells Fell Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Liddells Fell Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 10:47 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 5 May 2025 at 10:47.

Newcastle City Council logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Walbottle Road

Newcastle City Council are proposing to carry out Highway improvement works on Walbottle Road, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Apr 2025 at 12:08.

Newcastle City Council logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 13:01.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Saint Cuthberts Road

Newcastle City Council are carrying out Highway improvement works on Saint Cuthberts Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 22:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 6 May 2025 at 22:43.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Gretna Road

Newcastle City Council are carrying out Highway improvement works on Gretna Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 22:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 6 May 2025 at 22:43.

Northern Gas Networks logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Graham Park Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Graham Park Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 10:07.

Northern Gas Networks logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are carrying out Utility repair and maintenance works on High Street, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:00 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 13:20.

Newcastle City Council logo
LONG TERM
Between
7 May and 27 Jun 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 13:36.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Feb 2025 at 10:25.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:03 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 08:03.

Northern Gas Networks logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Frome Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Frome Gardens, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:42.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
West Road

Northern Gas Networks are carrying out Utility repair and maintenance works on West Road, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:50.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Colliery Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Colliery Road, Dunston, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:59 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 Jun 2025 at 07:37.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
St Omers Road From Colliery Road To Handy Drive

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Omers Road From Colliery Road To Handy Drive, Dunston, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:59 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 Jun 2025 at 07:36.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Scotswood Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Scotswood Road, Lemington, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 15:20 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:59.

Northern Gas Networks logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Frome Gardens

Northern Gas Networks are carrying out Utility repair and maintenance works on Frome Gardens, Chowdene, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 12:40 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:42.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Saint Georges Terrace

Northern Gas Networks are carrying out Utility repair and maintenance works on Saint Georges Terrace, Lemington, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:25.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are carrying out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 21 May 2025 at 08:29.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 13:44.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 08:36.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 08:09.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 11:19.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 08:40.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 10:57.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 08:10.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 Apr 2025 at 08:39.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 Apr 2025 at 15:21.

Northumbrian Water logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are carrying out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 May 2025 at 08:16.

Northumbrian Water logo
LONG TERM
Between
27 May and 26 Sep 2025
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 Apr 2025 at 15:22.

Northumbrian Water logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are carrying out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 May 2025 at 08:17.

Gateshead Metropolitan Borough Council logo
Between
27 May and 16 Jun 2025
Details
View Map
Share
Follow
Quarryfield Road

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Quarryfield Road, East Gateshead, Gateshead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 May 2025 at 10:59.

Gateshead Metropolitan Borough Council logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Quarryfield Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Quarryfield Road, East Gateshead, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 27 May 2025 at 08:49.

Newcastle City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Pottery Lane

Newcastle City Council are carrying out Highway improvement works on Pottery Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 27 May 2025 at 11:59.

Newcastle City Council logo
LONG TERM
Between
27 May and 4 Jul 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out Highway improvement works on Scotswood Road, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 13:34.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Apr 2025 at 12:00.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 11:57.

Northern Gas Networks logo
LONG TERM
Until
15 Jul 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 15 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:10.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ashtree Lane

Northumbrian Water are carrying out Utility repair and maintenance works on Ashtree Lane, High Spen, Rowlands Gill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 02:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 11:31.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 13:35.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Apr 2025 at 09:23.

Northumbrian Water logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are carrying out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 14:45 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 14:50.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 15:46.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 Apr 2025 at 11:53.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 12:30.

Northumbrian Water logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are carrying out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:50 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:50.

Northumbrian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road

Northumbrian Water are carrying out Utility repair and maintenance works on Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road, Birtley Central, Birtley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 13:54 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 07:57.

Gateshead Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Lead Road From Leadgate To Spen Lane

Gateshead Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Lead Road From Leadgate To Spen Lane, Ryton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 10 Mar 2025 at 07:20.

Gateshead Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Lead Road From Spen Lane To Stargate Lane And Beweshill Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lead Road From Spen Lane To Stargate Lane And Beweshill Lane, Greenside, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 08:30.

Northern Gas Networks logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Main Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Main Road, Barmoor, Ryton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:52 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:13.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Kingsway Roundabout

National Highways are proposing to carry out Works for road purposes on Kingsway Roundabout, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 May 2025 at 15:17.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 5 Mar 2025 at 13:56.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Claremont Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Mar 2025 at 09:07.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Claremont Place

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:09.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Mar 2025 at 09:06.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:09.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Feb 2025 at 10:20.

Newcastle City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chillingham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 15:30.

Northumbrian Water logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Benton Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Benton Terrace, Sandyford, Newcastle Upon Tyne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 12:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 15:46.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 11:53.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sackville Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sackville Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 15:26.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:24.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Easedale Gardens From Harlow Green Lane To Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Easedale Gardens From Harlow Green Lane To Long Bank, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:45.

Gateshead Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Springwell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springwell Road, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:21.

Gateshead Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Holburn Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Holburn Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:08.

Northern Gas Networks logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Bedeburn Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bedeburn Road, Newbiggin Hall, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 24 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:18.

Durham County Council logo
Between
9 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Ouston Lane

Durham County Council are proposing to carry out New service connection on Ouston Lane, Ouston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 10:06.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
School Lane

BT are proposing to carry out Utility repair and maintenance works on School Lane, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 15:56.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
School Lane

BT are proposing to carry out Utility repair and maintenance works on School Lane, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Jun 2025 at 07:38.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Field House Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Field House Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:07.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Fern Dene Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fern Dene Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 12:01.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Saltwell View

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saltwell View, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 11:51.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Dunston Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dunston Bank, Dunston Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Mar 2025 at 08:13.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Market Lane From Dunston Bank To Hollinside Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Lane From Dunston Bank To Hollinside Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Mar 2025 at 08:12.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Park Terrace

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Terrace, Dunston Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Mar 2025 at 08:14.

Gateshead Metropolitan Borough Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Ellison Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ellison Road, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 18 Mar 2025 at 08:21.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 May 2025 at 12:54.

Gateshead Metropolitan Borough Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Herbert Street

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Herbert Street, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 May 2025 at 10:24.

Gateshead Metropolitan Borough Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Herbert Street

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Herbert Street, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 May 2025 at 14:54.

Northern Powergrid (Northeast) logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 May 2025 at 09:25.

Newcastle City Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 07:01.

Northumbrian Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Mistletoe Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mistletoe Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Mar 2025 at 10:30.

Northumbrian Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Mistletoe Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mistletoe Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 10:10.

Gateshead Metropolitan Borough Council logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 10:26.

Newcastle City Council logo
Between
12 and 23 Jun 2025
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 06:28.

Newcastle City Council logo
Between
12 and 23 Jun 2025
Details
View Map
Share
Follow
Sackville Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sackville Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 07:01.

Gateshead Metropolitan Borough Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Seventh Avenue

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seventh Avenue, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 11:52.

Northumbrian Water logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street, Felling Central, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 18 Mar 2025 at 11:25.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Mar 2025 at 11:45.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 08:58.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salters Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Salters Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 19 Mar 2025 at 12:33.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salters Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Salters Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:18.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hedley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hedley Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Mar 2025 at 07:17.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hedley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hedley Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 10:01.

Gateshead Metropolitan Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Whitehall Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:30.

Gateshead Metropolitan Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Coatsworth Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coatsworth Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:35.

Gateshead Metropolitan Borough Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Lead Road From Spen Lane To Stargate Lane And Beweshill Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lead Road From Spen Lane To Stargate Lane And Beweshill Lane, Greenside, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:51.

Gateshead Metropolitan Borough Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Seventh Avenue

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seventh Avenue, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 10 Mar 2025 at 15:09.

Gateshead Metropolitan Borough Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Spa Well Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Spa Well Road, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:26.

Gateshead Metropolitan Borough Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Riverside Way

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Riverside Way, Metro Centre, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:28.

Newcastle City Council logo
Between
22 and 26 Jun 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Mar 2025 at 07:57.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 12:17.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Easedale Gardens From Harlow Green Lane To Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Easedale Gardens From Harlow Green Lane To Long Bank, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 11:12.

Gateshead Metropolitan Borough Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Springwell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springwell Road, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 12:06.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Apr 2025 at 09:38.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 15:59.

Northern Gas Networks logo
LONG TERM
Between
23 Jun and 30 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 10:59.

Northern Gas Networks logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Argyle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Argyle Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 15:11.

Northern Gas Networks logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Argyle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Argyle Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 15:52.

Northumbrian Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Diana Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Diana Street, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 25 Mar 2025 at 08:22.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 31 Mar 2025 at 09:30.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Apr 2025 at 06:30.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 17 Apr 2025 at 10:54.

Northumbrian Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Saint Georges Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Georges Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 25 Mar 2025 at 10:52.

Gateshead Metropolitan Borough Council logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
North Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:32.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Field House Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Field House Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:30.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Fern Dene Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fern Dene Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:25.

Gateshead Metropolitan Borough Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Saltwell View

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saltwell View, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 Mar 2025 at 16:11.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:01.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:07.

Northern Gas Networks logo
Between
26 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Bedeburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedeburn Road, Newbiggin Hall, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 13:58.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Trevelyan Drive

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Trevelyan Drive, Newbiggin Hall, Newcastle Upon Tyne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 17 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:26.

Newcastle City Council logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Mar 2025 at 07:55.

Gateshead Metropolitan Borough Council logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Consett Route

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Consett Route, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 19 Mar 2025 at 08:47.

Gateshead Metropolitan Borough Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Consett Route

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Consett Route, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:33.

Gateshead Metropolitan Borough Council logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Cuthbert Street To Consett Route Westbound Slip On

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cuthbert Street To Consett Route Westbound Slip On, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 19 Mar 2025 at 08:30.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 6 Nov 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 11:02.

Northumbrian Water logo
Between
1 and 5 Jul 2025
Details
View Map
Share
Follow
Millfield Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Millfield Road, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Apr 2025 at 07:57.

Newcastle City Council logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Chillingham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 17 Mar 2025 at 08:31.

Newcastle City Council logo
Between
2 and 9 Jul 2025
Details
View Map
Share
Follow
Northumberland Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Mar 2025 at 12:33.

Gateshead Metropolitan Borough Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Holburn Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Holburn Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 May 2025 at 10:43.

Northumbrian Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Ridley Place

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Place, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 10 Apr 2025 at 17:15.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Deepdale Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Deepdale Green, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 09:51.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Deepdale Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Deepdale Green, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 May 2025 at 11:40.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:16.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:17.

Newcastle City Council logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Willow Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Willow Avenue, Fenham, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Mar 2025 at 12:34.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 12:35.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 13:06.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:07.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Albemarle Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Albemarle Avenue, South Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 May 2025 at 13:34.

Northern Powergrid (Northeast) logo
Between
16 and 29 Jul 2025
Details
View Map
Share
Follow
Brown Crescent

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Brown Crescent, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Apr 2025 at 08:07.

Northern Powergrid (Northeast) logo
Between
16 and 29 Jul 2025
Details
View Map
Share
Follow
Brown Crescent

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Brown Crescent, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 15:26.

Northern Gas Networks logo
Between
16 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Market Lane From Dunston Bank To Hollinside Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Market Lane From Dunston Bank To Hollinside Road, Gateshead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:17.

Northern Powergrid (Northeast) logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Shields Road From Heworth Roundabout To Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shields Road From Heworth Roundabout To Victoria Road West, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:03.

Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Quayside

Commsworld are proposing to carry out Utility asset works on Quayside, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Commsworld on 17 Apr 2025 at 12:46.

Newcastle City Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Great North Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Great North Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 20 May 2025 at 09:50.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Netherby Drive

Newcastle City Council are proposing to carry out Highway improvement works on Netherby Drive, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 07:10.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Netherby Drive

Newcastle City Council are proposing to carry out Highway improvement works on Netherby Drive, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 07:12.

Newcastle City Council logo
LONG TERM
Between
21 Jul 2025 and 10 Oct 2026
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 26 Mar 2025 at 12:33.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 28 Mar 2025 at 06:58.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Pawston Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pawston Road, High Spen, Rowlands Gill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 Apr 2025 at 08:59.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Pawston Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pawston Road, High Spen, Rowlands Gill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 08:03.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Dunston Bank

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunston Bank, Dunston Hill, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:18.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Ellison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:21.

Northumbrian Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Barlowfield Close

Northumbrian Water are proposing to carry out Utility asset works on Barlowfield Close, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 May 2025 at 07:49.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Claremont Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Place, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 12:51.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sedgewick Place And Claremonet Place Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sedgewick Place And Claremonet Place Access Road, Bensham, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 12:51.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Road, East Gateshead, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:33.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Road, East Gateshead, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:18.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:33.

Gateshead Metropolitan Borough Council logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Park Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Gateshead Central, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:20.

Northumbrian Water logo
Between
29 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Dene Crescent

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dene Crescent, Rowlands Gill Central, Rowlands Gill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 May 2025 at 08:07.

Gateshead Metropolitan Borough Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
West Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on West Lane, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 Apr 2025 at 08:59.

Gateshead Metropolitan Borough Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
West Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on West Lane, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 08:03.

Gateshead Metropolitan Borough Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knobbyends Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Knobbyends Lane, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 Apr 2025 at 09:00.

Gateshead Metropolitan Borough Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knobbyends Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Knobbyends Lane, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 08:04.

Gateshead Metropolitan Borough Council logo
Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Fellside Road From Hole Lane To Lobley Hill Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fellside Road From Hole Lane To Lobley Hill Road, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 30 Apr 2025 at 09:01.

Gateshead Metropolitan Borough Council logo
Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Fellside Road From Hole Lane To Lobley Hill Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fellside Road From Hole Lane To Lobley Hill Road, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 08:05.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Apr 2025 at 09:53.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 09:30.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Apr 2025 at 09:54.

Gateshead Metropolitan Borough Council logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 7 May 2025 at 09:33.

Newcastle City Council logo
LONG TERM
Between
31 Jul and 4 Nov 2025
Details
View Map
Share
Follow
Pottery Lane

Newcastle City Council are proposing to carry out Highway improvement works on Pottery Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 8 May 2025 at 13:58.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
B6310 (From Longclose Bank To B6314 New Road Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on B6310 (From Longclose Bank To B6314 New Road Junc), Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 12:05.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
B6310 (From B6314 New Road Junc To A692 Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on B6310 (From B6314 New Road Junc To A692 Junc), Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 11:58.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
New Road

Durham County Council are proposing to carry out Highway repair and maintenance works on New Road, Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 12:02.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Sheephill

Durham County Council are proposing to carry out Highway repair and maintenance works on Sheephill, Stanley, Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 13:08.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Busty Bank

Durham County Council are proposing to carry out Highway repair and maintenance works on Busty Bank, Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 13:06.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Watson Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Watson Street, Burnopfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2025 at 12:00.

Newcastle City Council logo
Between
3 and 11 Aug 2025
Details
View Map
Share
Follow
Westmorland Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 07:25.

Northern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Kepier Chare

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kepier Chare, Crawcrook, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 10:02.

Northern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Main Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Street, Crawcrook, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 10:46.

Newcastle City Council logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Two Ball Lonnen

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Two Ball Lonnen, Fenham, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 20 Mar 2025 at 11:30.

Northumbrian Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Holly Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holly Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 May 2025 at 14:55.

Northumbrian Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Windsor Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Windsor Terrace, South Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 May 2025 at 14:53.

Cityfibre Metro Networks logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Elliot Road

Cityfibre Metro Networks are proposing to carry out Remedial works on Elliot Road, Old Fold, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 May 2025 at 15:15.

Northern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Stella Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stella Road, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 10:52.

Northumbrian Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Brignall Gardens

Northumbrian Water are proposing to carry out Utility asset works on Brignall Gardens, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 May 2025 at 09:36.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Shelley Drive

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shelley Drive, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 May 2025 at 12:30.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Byron Walk

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Byron Walk, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 May 2025 at 15:48.

Gateshead Metropolitan Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Keats Walk

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Keats Walk, Sunderland Road, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 May 2025 at 15:40.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Back Row

BT are proposing to carry out Utility repair and maintenance works on Back Row, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 11:03.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Back Row

BT are proposing to carry out Utility repair and maintenance works on Back Row, Whickham Central, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 07:35.

BT logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Park Terrace Back Odd Numbers 1 To 63

BT are proposing to carry out Utility asset works on Park Terrace Back Odd Numbers 1 To 63, Dunston Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 May 2025 at 09:59.

Northumbrian Water logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Park Row

Northumbrian Water are proposing to carry out Utility asset works on Park Row, Felling Central, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 May 2025 at 09:41.

Northern Gas Networks logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Park Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Terrace, Dunston Hill, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:29.

Northern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Dunston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunston Road, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:33.

Northumbrian Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Percy Street

Northumbrian Water are proposing to carry out Utility asset works on Percy Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 09:09.

Northumbrian Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Tynevale Terrace

Northumbrian Water are proposing to carry out Utility asset works on Tynevale Terrace, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:02.

BT logo
Between
22 and 29 Aug 2025
Details
View Map
Share
Follow
Glebe Terrace Back Numbers 52 To 92

BT are proposing to carry out Utility asset works on Glebe Terrace Back Numbers 52 To 92, Dunston Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 May 2025 at 09:57.

Gateshead Metropolitan Borough Council logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Albany Road From Park Lane To Quarryfield Road Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Albany Road From Park Lane To Quarryfield Road Roundabout, East Gateshead, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 12 May 2025 at 14:32.

Gateshead Metropolitan Borough Council logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Albany Road From Park Lane To Quarryfield Road Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Albany Road From Park Lane To Quarryfield Road Roundabout, East Gateshead, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 May 2025 at 13:19.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 29 Sep 2025
Details
View Map
Share
Dunston Bank

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Dunston Bank, Dunston Hill, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 11:41.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 May 2025 at 13:49.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:35.

Newcastle City Council logo
Between
26 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Stamfordham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Stamfordham Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Mar 2025 at 08:13.


Roadworks Map near to Duckpool Lane, NEWCASTLE UPON TYNE, NE16 4HB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 18:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Duckpool Lane, NEWCASTLE UPON TYNE, NE16 4HB (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CONISTON AVENUE, WHICKHAM CENTRAL 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
30 May 2025 15:15 - 17:45
0.2
Details
Share
2
Gateshead Metropolitan Borough Council logo
MAJOR
  
RECTORY LANE, WHICKHAM CENTRAL 
(0.3 miles)
Gateshead Metropolitan Borough Council
Section 50 - Footway, Carriageway - No carriageway incursion
In Progress
Since: 28 May 2025 08:00
(Scheduled: 27 May 2025 - 16 Jun 2025)
0.3
Details
Share
Follow
3
Northern Powergrid (Northeast) logo
URGENT
  
CLAVERING ROAD, SWALWELL 
(0.6 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 09:05
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.6
Details
Share
Follow
4
Northern Powergrid (Northeast) logo
URGENT
  
CLAVERING ROAD, SWALWELL 
(0.6 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 10:25
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.6
Details
Share
Follow
5
Virgin Media logo
ST MICHAELS WAY, METRO CENTRE 
(0.7 miles)
Virgin Media
Utility asset works - Footway, Verge - No carriageway incursion
In Progress
Since: 3 Jun 2025 10:05
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.7
Details
Share
Follow
6
Gateshead Metropolitan Borough Council logo
L'ARBRE CRESCENT, FELLSIDE PARK 
(0.8 miles)
Gateshead Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 21 May 2025 08:08
(Scheduled: 21 May 2025 - 4 Jun 2025)
0.8
Details
Share
Follow
7
Virgin Media logo
CROSS LANE, DUNSTON 
(0.8 miles)
Virgin Media
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.