ROADWORKS SUMMARY
Dukes Meadow, NEWCASTLE UPON TYNE, NE13 8AU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Dukes Meadow, NE13 8AU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Dukes Meadow, NEWCASTLE UPON TYNE, NE13 8AU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dukes Meadow are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Newcastle City Council logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Pilgrim Street

Newcastle City Council are carrying out Highway improvement works on Pilgrim Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2023 at 07:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Jan 2025 at 09:26.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Sycamore Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Sycamore Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Nov 2024 at 14:37.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Saint Thomas Street

Newcastle City Council are carrying out Highway repair and maintenance works on Saint Thomas Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:39.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Richardson Road

Newcastle City Council are carrying out Highway repair and maintenance works on Richardson Road, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:36.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Victoria Road, Spital Tongues, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Newcastle City Council on 7 Mar 2024 at 11:59.

Newcastle City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Brunswick Place

Newcastle City Council are carrying out Highway repair and maintenance works on Brunswick Place, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 3 Jul 2024 at 14:23.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Central Motorway East A167m

Newcastle City Council are carrying out Highway repair and maintenance works on Central Motorway East A167m, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:56.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
New Bridge Street

Newcastle City Council are carrying out Highway repair and maintenance works on New Bridge Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:59.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Park Terrace

Newcastle City Council are proposing to carry out Highway improvement works on Park Terrace, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway improvement works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Until
22 Apr 2025
Details
View Map
Share
Follow
Elswick Road

Newcastle City Council are carrying out Highway repair and maintenance works on Elswick Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 2 Sep 2024 at 08:46.

Northern Gas Networks logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
U9052 Birney Hall Junction To Callerton Hall Junction

Northern Gas Networks are carrying out Utility repair and maintenance works on U9052 Birney Hall Junction To Callerton Hall Junction, Throckley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 15:29.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 26 Feb 2025
Details
View Map
Share
Follow
Stamfordham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 26 February 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:33.

Northern Gas Networks logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Stamfordham Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 15:37.

Newcastle City Council logo
LONG TERM
Between
6 Dec 2024 and 22 Apr 2025
Details
View Map
Share
Follow
Grainger Park Road

Newcastle City Council are proposing to carry out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 22 April 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 13 Sep 2024 at 09:46.

Newcastle City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Grainger Park Road

Newcastle City Council are carrying out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 08:21.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Beacon Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Beacon Drive, Wideopen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Oct 2024 at 09:10.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rayleigh Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rayleigh Drive, Wideopen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:08.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Ponteland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Ponteland Road, Heddon-on-the-wall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:00 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 15:43.

Northern Gas Networks logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Callerton Lane Ends

Northern Gas Networks are carrying out Utility repair and maintenance works on Callerton Lane Ends, Ponteland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:00 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 15:39.

Newcastle City Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Riversdale Way

Newcastle City Council are carrying out Highway repair and maintenance works on Riversdale Way, Newburn Haugh Industrial Estate, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 19:00 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 27 Jan 2025 at 10:33.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Birch Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Birch Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 9 Jan 2025 at 07:38.

Newcastle City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:14.

Newcastle City Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are carrying out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 20:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Jan 2025 at 09:27.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are proposing to carry out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 11 Dec 2024 at 10:08.

Newcastle City Council logo
LONG TERM
Until
5 May 2025
Details
View Map
Share
Follow
North Walbottle Road

Newcastle City Council are carrying out Section 50 on North Walbottle Road, North Walbottle, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 09:17 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 14 Jan 2025 at 09:23.

Newcastle City Council logo
LONG TERM
Between
13 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Firfield Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:54.

Newcastle City Council logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Firfield Road

Newcastle City Council are carrying out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 12:00 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 14 Jan 2025 at 08:12.

Northern Powergrid (Northeast) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Burn Road

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:26.

Northern Powergrid (Northeast) logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Burn Road

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Feb 2025 at 14:00.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 28 Jan 2025 at 11:11.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are carrying out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 4 Feb 2025 at 11:25.

Northern Powergrid (Northeast) logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Worswick Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Worswick Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Dec 2024 at 11:16.

Northern Powergrid (Northeast) logo
Until
2 Mar 2025
Details
View Map
Share
Follow
Worswick Street

Northern Powergrid (Northeast) are carrying out Utility asset works on Worswick Street, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 09:50 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Feb 2025 at 09:51.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clara Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Clara Street, Benwell, Newcastle Upon Tyne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 13:38 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 12:55.

Northern Powergrid (Northeast) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Twizzell Avenue Back

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:16.

Northern Powergrid (Northeast) logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Twizzell Avenue Back

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 07:00 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Feb 2025 at 10:38.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Main Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Main Road, Barmoor, Ryton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 12:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 12:31.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Shibdon Bank

Northern Gas Networks are carrying out Utility repair and maintenance works on Shibdon Bank, Blaydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 09:23 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 14:15.

Newcastle City Council logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:47.

Newcastle City Council logo
Between
10 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Station Road

Newcastle City Council are proposing to carry out Highway improvement works on Station Road, Kenton Bankfoot, Newcastle Upon Tyne.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the verge only.

This roadwork event was last updated by Newcastle City Council on 23 Jan 2025 at 11:01.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:06.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:25.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:05.

Northern Powergrid (Northeast) logo
Until
4 Mar 2025
Details
View Map
Share
Follow
North Street

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 09:20 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Feb 2025 at 09:33.

North Tyneside Council logo
Between
12 and 25 Feb 2025
Details
View Map
Share
Follow
Rayleigh Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rayleigh Drive, Wideopen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Feb 2025 at 12:56.

Northern Gas Networks logo
Until
25 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bridge Street, Blaydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 15:03 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Feb 2025 at 15:42.

Northern Powergrid (Northeast) logo
Between
15 Feb and 7 Mar 2025
Details
View Map
Share
Follow
North Street

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:17.

Gateshead Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Blaydon Highway

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Blaydon Highway, Blaydon Central, Blaydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2025 at 06:00 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 15 Feb 2025 at 09:26.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Blandford Square

Murphy Power Distribution were proposing to carry out New service connection on Blandford Square, Rye Hill, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 12:56.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Blandford Square

Murphy Power Distribution were proposing to carry out Utility asset works on Blandford Square, Rye Hill, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 15:12.

Newcastle City Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wingrove Gardens

Newcastle City Council are proposing to carry out Highway improvement works on Wingrove Gardens, Newcastle Upon Tyne.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 4 Feb 2025 at 12:56.

Finishing
Friday
Details
View Map
Share
Follow
Buston Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Buston Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Feb 2025 at 10:21.

Newcastle City Council logo
Between
19 Feb and 5 Mar 2025
Details
View Map
Share
Follow
New Mills

Newcastle City Council are proposing to carry out Highway repair and maintenance works on New Mills, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Nov 2024 at 13:24.

Newcastle City Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 10:22.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jan 2025 at 14:42.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Feb 2025 at 11:16.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 07:01.

Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Deuchar Street

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Deuchar Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 13 Jan 2025 at 14:56.

Northumbrian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
The Towne Gate

Northumbrian Water are proposing to carry out Remedial works on The Towne Gate, Heddon-on-the-wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 08:50.

Northumbrian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
The Towne Gate

Northumbrian Water are proposing to carry out Remedial works on The Towne Gate, Heddon-on-the-wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Dec 2024 at 11:38.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Norham Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Norham Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 09:51.

Northern Powergrid (Northeast) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Norham Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.

North Tyneside Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Benton Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, West Moor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 4 Feb 2025 at 09:19.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 11:34.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 11:35.

National Highways logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
A1068 Fisher Lane To Seaton Burn Roundabout

National Highways are proposing to carry out Works for road purposes on A1068 Fisher Lane To Seaton Burn Roundabout, Seaton Burn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Jan 2025 at 10:54.

National Highways logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
A1068 Fisher Lane To Seaton Burn Roundabout

National Highways are proposing to carry out Works for road purposes on A1068 Fisher Lane To Seaton Burn Roundabout, Seaton Burn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Jan 2025 at 14:16.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 08:54.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Jan 2025 at 12:13.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Fern Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 08:53.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Fern Avenue

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 6 Jan 2025 at 09:09.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Fern Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 7 Jan 2025 at 14:27.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Manor House Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Manor House Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 10:59.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Manor House Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Manor House Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 12:20.

Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Queens Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Queens Road, Jesmond, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 09:23.

Newcastle City Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Sandyford Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sandyford Road, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 13 Feb 2025 at 07:31.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Grosvenor Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 24 Dec 2024 at 08:57.

Between
3 and 7 Mar 2025
Details
View Map
Share
Grosvenor Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 8 Jan 2025 at 08:34.

Between
3 and 7 Mar 2025
Details
View Map
Share
Grosvenor Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Jan 2025 at 11:04.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Grosvenor Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 07:45.

Between
3 and 7 Mar 2025
Details
View Map
Share
Grosvenor Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 08:09.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Grosvenor Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 08:10.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Salisbury Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Nov 2024 at 18:24.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Salisbury Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 11:47.

Between
3 and 7 Mar 2025
Details
View Map
Share
Ripon Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 10:03.

Between
3 and 7 Mar 2025
Details
View Map
Share
Ripon Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 09:38.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Deuchar Street

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Deuchar Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 24 Dec 2024 at 08:52.

Between
3 and 7 Mar 2025
Details
View Map
Share
Deuchar Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Deuchar Street, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 8 Jan 2025 at 08:32.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kimberley Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Kimberley Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 24 Dec 2024 at 08:56.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kimberley Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Kimberley Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 6 Jan 2025 at 13:43.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 08:01.

Between
3 and 7 Mar 2025
Details
View Map
Share
Lansdowne Gardens

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Jan 2025 at 14:14.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 Jan 2025 at 13:27.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Holly Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Holly Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 14:49.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Holly Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Holly Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Jan 2025 at 12:12.

Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Gowan Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Gowan Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 08:58.

Between
3 and 14 Mar 2025
Details
View Map
Share
Gowan Terrace

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Gowan Terrace, Jesmond, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 20 Dec 2024 at 09:09.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Buston Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Buston Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 09:35.

Northern Powergrid (Northeast) logo
LONG TERM
Between
3 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Footpath 4 Hazlerigg

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Footpath 4 Hazlerigg, Newcastle Upon Tyne.

These works are categorised as Major.

The works will start on or after 3 March 2025 and could run through until 9 April 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Feb 2025 at 14:06.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Angus Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Angus Close, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 07:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
3 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Footpath 4 Hazlerigg

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Footpath 4 Hazlerigg, Newcastle Upon Tyne.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 March 2025 and could run through until 9 April 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 Jan 2025 at 14:47.

Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Jan 2025 at 16:30.

Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Shortridge Terrace

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 7 Jan 2025 at 14:23.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Saint Nicholas Church Yard

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Saint Nicholas Church Yard, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 13:35.

Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 Dec 2024 at 10:46.

Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Lansdowne Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 6 Jan 2025 at 08:27.

Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Grosvenor Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Jan 2025 at 10:11.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Graham Park Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Graham Park Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 10:38.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 30 May 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 15:28.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 9 May 2025
Details
View Map
Share
Follow
Great North Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Great North Road, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 10:21.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Angus Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Angus Close, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 15:08.

Newcastle City Council logo
Between
11 and 27 Mar 2025
Details
View Map
Share
Hazeldene Avenue

Newcastle City Council were proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 29 Jan 2025 at 13:42.

LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 10:56.

Newcastle City Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Kinnaird Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Kinnaird Avenue, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 7 Jan 2025 at 11:43.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 7 May 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:17.

Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Ripon Gardens

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Jan 2025 at 16:57.

Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Manor House Road

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Manor House Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Jan 2025 at 09:10.

Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Manor House Road

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Manor House Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Jan 2025 at 10:12.

Between
20 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Fern Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Jan 2025 at 10:05.

Between
20 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Fern Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Jan 2025 at 10:53.

Northern Powergrid (Northeast) logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Twizell Avenue Access Track To Electricity Sub-station

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Twizell Avenue Access Track To Electricity Sub-station, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 11:25.

Northumbrian Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Goldspink Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Goldspink Lane, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 Jan 2025 at 11:18.

Northern Gas Networks logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Woodvale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodvale Road, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:19.

Northern Gas Networks logo
Between
31 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Cherry Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cherry Way, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 13:41.

Northern Powergrid (Northeast) logo
Between
3 and 16 Apr 2025
Details
View Map
Share
Twizzell Avenue Back

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 11:36.

Northumbrian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Westgate Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Westgate Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Jan 2025 at 07:49.

Northumbrian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Doncaster Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Doncaster Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 06:28.

Newcastle City Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Walbottle Road

Newcastle City Council are proposing to carry out Highway improvement works on Walbottle Road, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 13:14.

Northern Powergrid (Northeast) logo
Between
12 Apr and 2 May 2025
Details
View Map
Share
North Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 12:23.

Northern Gas Networks logo
Between
12 and 30 Apr 2025
Details
View Map
Share
Follow
Stella Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stella Road, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 13:22.

Newcastle City Council logo
Between
17 and 24 Apr 2025
Details
View Map
Share
Follow
Axwell Park View

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Axwell Park View, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 17 Jan 2025 at 09:50.

Northern Gas Networks logo
LONG TERM
Between
21 Apr and 23 May 2025
Details
View Map
Share
Follow
Deepdale Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Deepdale Green, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 06:47.

Newcastle City Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 23 Jan 2025 at 14:15.

Northern Powergrid (Northeast) logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Footpath 3 Newcastle

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Footpath 3 Newcastle, Newcastle Upon Tyne.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Feb 2025 at 14:07.

Northern Powergrid (Northeast) logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Footpath 3 Newcastle

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Footpath 3 Newcastle, Newcastle Upon Tyne.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Feb 2025 at 10:15.

Newcastle City Council logo
Between
27 Apr and 7 May 2025
Details
View Map
Share
Follow
Westmorland Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 29 Jan 2025 at 14:52.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Burn Road

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 12:27.

Newcastle City Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out roadworks on Scotswood Road, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 8 Jan 2025 at 09:05.

Newcastle City Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out roadworks on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 8 Jan 2025 at 08:42.

Newcastle City Council logo
Between
1 and 13 May 2025
Details
View Map
Share
Follow
Two Ball Lonnen

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Two Ball Lonnen, Fenham, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 12:59.

Newcastle City Council logo
Between
5 and 8 May 2025
Details
View Map
Share
Follow
William Armstrong Drive

Newcastle City Council are proposing to carry out Highway repair and maintenance works on William Armstrong Drive, Newcastle Business Park, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Feb 2025 at 16:19.

Newcastle City Council logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 13:01.


Roadworks Map near to Dukes Meadow, NEWCASTLE UPON TYNE, NE13 8AU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 15 Feb 2025 19:29
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Dukes Meadow, NEWCASTLE UPON TYNE, NE13 8AU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
BLACK CALLERTON 
(0.5 miles)
Northumbrian Water
Utility repair and maintenance works - Verge - No carriageway incursion
Cancelled
(Scheduled: 12 Feb 2025 - 18 Feb 2025)
0.5
Details
Share
2
Newcastle City Council logo
MAJOR
  
STATION ROAD, KENTON BANKFOOT 
(1.0 miles)
Newcastle City Council
Highway improvement works - Verge - No carriageway incursion
Planned
Scheduled: 10 Feb 2025 - 9 Mar 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.