ROADWORKS SUMMARY
Woolsington Gardens, NEWCASTLE UPON TYNE, NE13 8AP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woolsington Gardens, NE13 8AP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Woolsington Gardens, NEWCASTLE UPON TYNE, NE13 8AP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woolsington Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Saint Thomas Street

Newcastle City Council are carrying out Highway repair and maintenance works on Saint Thomas Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:39.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Richardson Road

Newcastle City Council are carrying out Highway repair and maintenance works on Richardson Road, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:36.

Newcastle City Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Victoria Road, Spital Tongues, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Newcastle City Council on 7 Mar 2024 at 11:59.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
Heath Court

Newcastle City Council are carrying out Highway repair and maintenance works on Heath Court, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:12.

Newcastle City Council logo
LONG TERM
Until
31 May 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:11.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Central Motorway East A167m

Newcastle City Council are carrying out Highway repair and maintenance works on Central Motorway East A167m, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:56.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
Tyne Bridge

Newcastle City Council are carrying out Highway repair and maintenance works on Tyne Bridge, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:53.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
City Road

Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 21:00.

Newcastle City Council logo
LONG TERM
Until
1 Jun 2028
Details
View Map
Share
Follow
New Bridge Street

Newcastle City Council are carrying out Highway repair and maintenance works on New Bridge Street, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:59.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Queen Street

Newcastle City Council are carrying out Highway repair and maintenance works on Queen Street, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:25.

Newcastle City Council logo
LONG TERM
Until
14 Jun 2028
Details
View Map
Share
Follow
Akenside Hill

Newcastle City Council are carrying out Highway repair and maintenance works on Akenside Hill, City Centre, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:26.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Road

Newcastle City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Park Terrace

Newcastle City Council are proposing to carry out Highway improvement works on Park Terrace, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Newcastle City Council logo
LONG TERM
Between
11 Aug 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway improvement works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 09:45 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 11:29.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Mar 2025 at 10:37.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Mar 2025 at 16:37.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Armstrong Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Mar 2025 at 10:20.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stamfordham Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Stamfordham Road, Ponteland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 11:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 May 2025 at 11:18.

Northumbrian Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pilgrim Street

Northumbrian Water are carrying out Utility repair and maintenance works on Pilgrim Street, Newcastle Upon Tyne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 April 2025 at 10:06 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 23 May 2025 at 08:55.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Footpath 3 Newcastle

Northern Powergrid (Northeast) are carrying out Utility asset works on Footpath 3 Newcastle, Newcastle Upon Tyne.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 28 April 2025 at 11:00 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jun 2025 at 07:36.

Northern Gas Networks logo
LONG TERM
Between
24 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 11:59.

Northern Gas Networks logo
LONG TERM
Between
24 Apr and 18 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:42.

Northern Gas Networks logo
LONG TERM
Between
25 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Osborne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 28 Apr 2025 at 09:22.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Birch Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Birch Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 Apr 2025 at 09:18.

Northern Gas Networks logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are carrying out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 09:45 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Apr 2025 at 10:02.

Northern Gas Networks logo
LONG TERM
Between
29 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 10:10.

Northern Gas Networks logo
LONG TERM
Between
29 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 15 Apr 2025 at 12:31.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Denton Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Denton Road, Scotswood, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 09:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:14.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Burn Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 20 Feb 2025 at 13:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Burn Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 5 May 2025 at 10:47.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Liddells Fell Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Liddells Fell Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 20 Feb 2025 at 13:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Liddells Fell Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Liddells Fell Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 10:47 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 5 May 2025 at 10:47.

Newcastle City Council logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Walbottle Road

Newcastle City Council are proposing to carry out Highway improvement works on Walbottle Road, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 15 Apr 2025 at 12:08.

Newcastle City Council logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 13:01.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Saint Cuthberts Road

Newcastle City Council are carrying out Highway improvement works on Saint Cuthberts Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 22:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 6 May 2025 at 22:43.

Newcastle City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Gretna Road

Newcastle City Council are carrying out Highway improvement works on Gretna Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 22:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 6 May 2025 at 22:43.

Northern Gas Networks logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Graham Park Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Graham Park Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 10:07.

Northern Gas Networks logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are carrying out Utility repair and maintenance works on High Street, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:00 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 13:20.

Newcastle City Council logo
LONG TERM
Between
7 May and 27 Jun 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 13:36.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Woodvale Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodvale Road, Killingworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 12:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 12:37.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
West Road

Northern Gas Networks are carrying out Utility repair and maintenance works on West Road, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:50.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Colliery Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Colliery Road, Dunston, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:59 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 Jun 2025 at 07:37.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
St Omers Road From Colliery Road To Handy Drive

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Omers Road From Colliery Road To Handy Drive, Dunston, Gateshead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:59 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 2 Jun 2025 at 07:36.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Scotswood Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Scotswood Road, Lemington, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 15:20 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:59.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cherry Way

Northern Gas Networks are carrying out Utility repair and maintenance works on Cherry Way, Killingworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 07:50.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Saint Georges Terrace

Northern Gas Networks are carrying out Utility repair and maintenance works on Saint Georges Terrace, Lemington, Newcastle Upon Tyne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:25.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hazeldene Avenue

Newcastle City Council are carrying out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 21 May 2025 at 08:29.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 13:44.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 08:36.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 08:09.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 11:19.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 08:40.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 10:57.

Northern Gas Networks logo
LONG TERM
Between
26 May and 3 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 08:10.

Newcastle City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Pottery Lane

Newcastle City Council are carrying out Highway improvement works on Pottery Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 27 May 2025 at 11:59.

Newcastle City Council logo
LONG TERM
Between
27 May and 4 Jul 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out Highway improvement works on Scotswood Road, Newcastle Upon Tyne.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 13:34.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Apr 2025 at 12:00.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 11:57.

Northern Gas Networks logo
LONG TERM
Until
15 Jul 2025
Details
View Map
Share
Follow
Newbiggin Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Newbiggin Lane, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 15 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:10.

Northern Gas Networks logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Main Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Main Road, Barmoor, Ryton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:52 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:13.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 11:53.

Gateshead Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Holburn Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Holburn Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Mar 2025 at 08:08.

Northern Gas Networks logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Bedeburn Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bedeburn Road, Newbiggin Hall, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 24 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:18.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 May 2025 at 12:54.

Northumbrian Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Mistletoe Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mistletoe Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Mar 2025 at 10:30.

Northumbrian Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Mistletoe Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mistletoe Road, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 10:10.

North Tyneside Council logo
LONG TERM
Between
10 Jun and 3 Sep 2025
Details
View Map
Share
Follow
Benton Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 19 Mar 2025 at 13:09.

North Tyneside Council logo
LONG TERM
Between
10 Jun and 3 Sep 2025
Details
View Map
Share
Follow
Benton Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.

These works are categorised as Major.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 19 Mar 2025 at 09:12.

North Tyneside Council logo
LONG TERM
Between
10 Jun and 3 Sep 2025
Details
View Map
Share
Follow
Salters Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Longbenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 19 Mar 2025 at 11:41.

North Tyneside Council logo
LONG TERM
Between
10 Jun and 3 Sep 2025
Details
View Map
Share
Follow
Salters Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Longbenton.

These works are categorised as Major.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 19 Mar 2025 at 11:45.

Newcastle City Council logo
Between
12 and 23 Jun 2025
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 06:28.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Mar 2025 at 11:45.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 08:58.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salters Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Salters Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 19 Mar 2025 at 12:33.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salters Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Salters Road, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 10:58.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hedley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hedley Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Mar 2025 at 07:17.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hedley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hedley Terrace, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 10:01.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Grenville Drive

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grenville Drive, Brunton Park, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Apr 2025 at 12:14.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Grenville Drive

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grenville Drive, Brunton Park, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 08:35.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Chapel Place

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Chapel Place, Seaton Burn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Mar 2025 at 10:01.

Northumbrian Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Chapel Place

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Chapel Place, Seaton Burn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:44.

Gateshead Metropolitan Borough Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Riverside Way

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Riverside Way, Metro Centre, Whickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:28.

LONG TERM
Between
21 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Stamfordham Road

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Stamfordham Road, Throckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 16 May 2025 at 11:46.

Newcastle City Council logo
Between
22 and 26 Jun 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Mar 2025 at 07:57.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Apr 2025 at 09:38.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 15:59.

Northern Gas Networks logo
LONG TERM
Between
23 Jun and 30 Oct 2025
Details
View Map
Share
Follow
Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Close, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 10:59.

Northumbrian Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Diana Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Diana Street, Arthurs Hill, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 25 Mar 2025 at 08:22.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 31 Mar 2025 at 09:30.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Apr 2025 at 06:30.

T-Mobile (UK) logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Portland Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Portland Road, Sandyford, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 17 Apr 2025 at 10:54.

Northumbrian Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Saint Georges Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Georges Terrace, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 25 Mar 2025 at 10:52.

Gateshead Metropolitan Borough Council logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
North Street

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 May 2025 at 13:32.

Northern Gas Networks logo
Between
26 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Bedeburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedeburn Road, Newbiggin Hall, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 13:58.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Trevelyan Drive

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Trevelyan Drive, Newbiggin Hall, Newcastle Upon Tyne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 17 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:26.

Newcastle City Council logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Claremont Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Claremont Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 25 Mar 2025 at 07:55.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 6 Nov 2025
Details
View Map
Share
Follow
Skinnerburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skinnerburn Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 11:02.

Northern Gas Networks logo
LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Great North Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Great North Road, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 11:13.

Northern Gas Networks logo
LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Great North Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Great North Road, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 10:26.

Newcastle City Council logo
Between
2 and 9 Jul 2025
Details
View Map
Share
Follow
Northumberland Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Mar 2025 at 12:33.

Newcastle City Council logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
East Acres

Newcastle City Council are proposing to carry out Highway repair and maintenance works on East Acres, Dinnington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 10 Mar 2025 at 10:28.

Newcastle City Council logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
East Acres

Newcastle City Council are proposing to carry out Highway repair and maintenance works on East Acres, Dinnington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 20 Mar 2025 at 10:55.

Gateshead Metropolitan Borough Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Holburn Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Holburn Lane, Ryton Central, Ryton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 May 2025 at 10:43.

Northumbrian Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Ridley Place

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Place, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 10 Apr 2025 at 17:15.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Deepdale Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Deepdale Green, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 09:51.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Deepdale Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Deepdale Green, Kenton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 May 2025 at 11:40.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Hexham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hexham Road, Heddon-on-the-wall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 12:48.

Northumbrian Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Ford View

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ford View, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Apr 2025 at 12:10.

Newcastle City Council logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Willow Avenue

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Willow Avenue, Fenham, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 24 Mar 2025 at 12:34.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Albemarle Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Albemarle Avenue, South Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 May 2025 at 13:34.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Grenville Drive

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grenville Drive, Brunton Park, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 14:47.

Between
14 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Eastern Way

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Darras Hall, Ponteland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 8 Apr 2025 at 16:31.

Between
14 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Eastern Way

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Darras Hall, Ponteland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 21 May 2025 at 11:23.

Newcastle City Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Great North Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Great North Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 20 May 2025 at 09:50.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Netherby Drive

Newcastle City Council are proposing to carry out Highway improvement works on Netherby Drive, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 07:10.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Netherby Drive

Newcastle City Council are proposing to carry out Highway improvement works on Netherby Drive, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Feb 2025 at 07:12.

Newcastle City Council logo
LONG TERM
Between
21 Jul 2025 and 10 Oct 2026
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 26 Mar 2025 at 12:33.

Newcastle City Council logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
West Denton Way

Newcastle City Council are proposing to carry out Highway improvement works on West Denton Way, West Denton, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Newcastle City Council on 28 Mar 2025 at 06:58.

Northern Gas Networks logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Hexham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hexham Road, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 12:13.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Lutterworth Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Lutterworth Close, Longbenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:44.

Newcastle City Council logo
LONG TERM
Between
31 Jul and 4 Nov 2025
Details
View Map
Share
Follow
Pottery Lane

Newcastle City Council are proposing to carry out Highway improvement works on Pottery Lane, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 8 May 2025 at 13:58.

Newcastle City Council logo
Between
3 and 11 Aug 2025
Details
View Map
Share
Follow
Westmorland Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 29 Apr 2025 at 07:25.

Newcastle City Council logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Two Ball Lonnen

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Two Ball Lonnen, Fenham, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 20 Mar 2025 at 11:30.

Northumbrian Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Holly Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holly Avenue, Jesmond, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 May 2025 at 14:55.

Northumbrian Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Windsor Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Windsor Terrace, South Gosforth, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 May 2025 at 14:53.

Northern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Stella Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stella Road, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 10:52.

Northumbrian Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Brignall Gardens

Northumbrian Water are proposing to carry out Utility asset works on Brignall Gardens, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 May 2025 at 09:36.

Northumbrian Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Percy Street

Northumbrian Water are proposing to carry out Utility asset works on Percy Street, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 09:09.

Northumbrian Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Tynevale Terrace

Northumbrian Water are proposing to carry out Utility asset works on Tynevale Terrace, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:02.

Newcastle City Council logo
Between
26 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Stamfordham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Stamfordham Road, Westerhope, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Mar 2025 at 08:13.


Roadworks Map near to Woolsington Gardens, NEWCASTLE UPON TYNE, NE13 8AP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woolsington Gardens, NEWCASTLE UPON TYNE, NE13 8AP (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CALLERTON LANE, CALLERTON 
(0.6 miles)
BT
Utility asset works - Verge - No carriageway incursion
Cancelled
(Scheduled: 30 May 2025 - 3 Jun 2025)
0.6
Details
Share
2
Northern Gas Networks logo
MAJOR
  
NEWBIGGIN LANE, WESTERHOPE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 29 Apr 2025 - 18 Jun 2025
0.9
Details
Share
Follow
3
Northern Gas Networks logo
MAJOR
  
NEWBIGGIN LANE, WESTERHOPE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 29 Apr 2025 - 18 Jun 2025
0.9
Details
Share
Follow
4
Northern Gas Networks logo
MAJOR
  
NEWBIGGIN LANE, WESTERHOPE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Multi-way signals
Planned
Scheduled: 29 Apr 2025 - 18 Jun 2025
0.9
Details
Share
Follow
5
Northern Gas Networks logo
MAJOR
  
NEWBIGGIN LANE, WESTERHOPE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Multi-way signals
In Progress
Since: 2 Jun 2025 09:00
(Scheduled: 27 May 2025 - 15 Jul 2025)
0.9
Details
Share
Follow
6
Northern Gas Networks logo
MAJOR
  
NEWBIGGIN LANE, WESTERHOPE 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 29 Apr 2025 - 18 Jun 2025
0.9
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
WEST THORP, NEWBIGGIN HALL 
(1.0 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Give and take
In Progress
Since: 29 Apr 2025 10:54
(Scheduled: 28 Apr 2025 - 9 Jun 2025)
1.0
Details
Share
Follow