ROADWORKS SUMMARY
Barnet Close, MILTON KEYNES, MK5 6BF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Barnet Close, MK5 6BF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Barnet Close, MILTON KEYNES, MK5 6BF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Barnet Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Between
12 Aug and 27 Dec 2024
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 27 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 15:11.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Whalley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whalley Drive, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Whalley Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Whalley Drive, Bletchley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 7 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:33.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Whalley Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Whalley Drive, Bletchley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 7 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 12:30.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Windmill Hill Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Windmill Hill Drive, Bletchley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

Milton Keynes Council logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Aylesbury Street

Milton Keynes Council are carrying out Highway repair and maintenance works on Aylesbury Street, Wolverton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:08 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Milton Keynes Council on 4 Dec 2024 at 09:21.

Buckinghamshire Council logo
LONG TERM
Between
25 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 13 Sep 2024 at 14:33.

Milton Keynes Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Abbey Road

Milton Keynes Council are carrying out Highway repair and maintenance works on Abbey Road, Bradwell, Milton Keynes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 27 Nov 2024 at 09:32.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
St Leger Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on St Leger Drive, Great Linford, Milton Keynes.

The works should not impact the carriageway.

The works started on 16 December 2024 at 12:15 and could run through until 24 December 2024. The works will impact the verge only.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 14:46.

Buckinghamshire Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Whaddon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Oct 2024 at 14:50.

Vattenfall Networks logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Saxon Street H10 To Princes Way

Vattenfall Networks are proposing to carry out New service connection on Saxon Street H10 To Princes Way, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 26 Jun 2024 at 08:11.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Leys Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Leys Road, Loughton, Milton Keynes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 15:05.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Bletchley Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Bletchley Road, Newton Longville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 2 Oct 2024 at 14:19.

Vattenfall Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Watling Street

Vattenfall Networks are proposing to carry out New service connection on Watling Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vattenfall Networks on 12 Sep 2024 at 09:26.

Buckinghamshire Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Whaddon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Sep 2024 at 14:33.

Buckinghamshire Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Stock Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stock Lane, Whaddon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Denmark Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Denmark Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 15:40.

BT logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Melrose Avenue

BT are proposing to carry out Utility asset works on Melrose Avenue, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Oct 2024 at 09:54.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Simpson Road

Network Rail are proposing to carry out Works for Rail Purposes on Simpson Road, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 15:02.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Simpson Road

Network Rail are proposing to carry out Works for Rail Purposes on Simpson Road, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 13:12.

Buckinghamshire Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Winslow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Winslow Road, Little Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 09:15.

Buckinghamshire Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 21 Oct 2024 at 15:06.

Western Power Distribution (East Midlands) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bletchley Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bletchley Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Nov 2024 at 10:45.

Buckinghamshire Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 21 Oct 2024 at 15:05.

Buckinghamshire Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 13:47.

Western Power Distribution (East Midlands) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bletchley Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bletchley Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Dec 2024 at 12:45.

Buckinghamshire Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Whaddon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whaddon Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 13:45.

Vattenfall Networks logo
LONG TERM
Between
20 Jan and 8 Mar 2025
Details
View Map
Share
Follow
Denbigh Road

Vattenfall Networks are proposing to carry out New service connection on Denbigh Road, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vattenfall Networks on 26 Jun 2024 at 07:49.

Electricity Network Company logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Snelshall Street H7 To H8

Electricity Network Company are proposing to carry out Utility asset works on Snelshall Street H7 To H8, Milton Keynes.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 12:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Denmark Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Denmark Street, Bletchley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 16:52.

Vattenfall Networks logo
LONG TERM
Between
27 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Watling Street H8 To H10

Vattenfall Networks are proposing to carry out New service connection on Watling Street H8 To H10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vattenfall Networks on 12 Sep 2024 at 09:28.

Vattenfall Networks logo
LONG TERM
Between
27 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Watling Street H8 To H10

Vattenfall Networks are proposing to carry out New service connection on Watling Street H8 To H10, Milton Keynes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vattenfall Networks on 26 Jun 2024 at 07:48.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Brickhill Street

Network Rail were proposing to carry out Works for Rail Purposes on Brickhill Street, Bow Brickhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 11:56.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Brickhill Street H10 To Caldecott Lake Drive

Network Rail were proposing to carry out Works for Rail Purposes on Brickhill Street H10 To Caldecott Lake Drive, Milton Keynes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 11:52.

Vattenfall Networks logo
Between
1 and 9 Feb 2025
Details
View Map
Share
Follow
Bletcham Way A5 To V10

Vattenfall Networks are proposing to carry out New service connection on Bletcham Way A5 To V10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 15 Nov 2024 at 09:57.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
George Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:33.

Electricity Network Company logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Snelshall Street H7 To H8

Electricity Network Company are proposing to carry out Utility asset works on Snelshall Street H7 To H8, Milton Keynes.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 14:24.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Singleborough Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Singleborough Lane, Singleborough, Great Horwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 09:04.

Milton Keynes Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Tudor Gardens

Milton Keynes Council are proposing to carry out Highway improvement works on Tudor Gardens, Stony Stratford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the footpath only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 14:26.

Milton Keynes Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Tudor Gardens

Milton Keynes Council are proposing to carry out Highway improvement works on Tudor Gardens, Stony Stratford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the footpath only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:18.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Singleborough Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Singleborough Lane, Singleborough, Great Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 12:52.

Electricity Network Company logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Snelshall Street H7 To H8

Electricity Network Company are proposing to carry out Utility asset works on Snelshall Street H7 To H8, Milton Keynes.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 13:05.

Cityfibre Metro Networks logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Brickhill Street

Cityfibre Metro Networks were proposing to carry out Utility asset works on Brickhill Street, Bow Brickhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Dec 2024 at 15:35.

Vattenfall Networks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Saxon Street H10 To Princes Way

Vattenfall Networks are proposing to carry out New service connection on Saxon Street H10 To Princes Way, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 16 Dec 2024 at 11:25.

Buckinghamshire Council logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bletchley Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bletchley Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 14:41.

West Northamptonshire Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wicken Park Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Wicken Park Road, Wicken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 3 Oct 2024 at 12:40.

Cityfibre Metro Networks logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Brickhill Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Brickhill Street, Bow Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Dec 2024 at 11:56.

Cityfibre Metro Networks logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Brickhill Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Brickhill Street, Bow Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Dec 2024 at 17:06.

Western Power Distribution (East Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Goran Avenue

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Goran Avenue, Stony Stratford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Dec 2024 at 15:47.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winslow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Winslow Road, Little Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 8 Nov 2024 at 11:17.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wolverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 16:05.

Milton Keynes Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Groveway V8 To V10

Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Milton Keynes Council on 2 Dec 2024 at 08:35.

Milton Keynes Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Groveway V8 To V10

Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Milton Keynes Council on 2 Dec 2024 at 14:07.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Granville Square

Anglian Water are proposing to carry out Remedial works on Granville Square, Willen, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 11:37.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Whaddon Way

Anglian Water are proposing to carry out Utility repair and maintenance works on Whaddon Way, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 9 Dec 2024 at 10:30.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Whaddon Way

Anglian Water were proposing to carry out Utility repair and maintenance works on Whaddon Way, Bletchley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 11:14.

Western Power Distribution (East Midlands) logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Bletchley Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bletchley Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 14:46.

BT logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Grasscroft

BT are proposing to carry out Utility asset works on Grasscroft, Furzton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 12:37.

BT logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Rothersthorpe

BT are proposing to carry out Utility asset works on Rothersthorpe, Giffard Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 11:35.

Milton Keynes Council logo
LONG TERM
Between
1 Mar and 17 May 2025
Details
View Map
Share
Follow
Standing Way V10 To V11

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 Oct 2024 at 10:53.

Milton Keynes Council logo
LONG TERM
Between
1 Mar and 17 May 2025
Details
View Map
Share
Follow
Standing Way V10 To V11

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:19.

Buckinghamshire Council logo
Between
1 and 5 Mar 2025
Details
View Map
Share
Follow
Winslow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Winslow Road, Little Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 10:34.

Buckinghamshire Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Nash Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Nash Road, Great Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 10:29.

Electricity Network Company logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Snelshall Street H7 To H8

Electricity Network Company were proposing to carry out Utility asset works on Snelshall Street H7 To H8, Milton Keynes.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 10:21.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Whaddon Way

Anglian Water were proposing to carry out Utility repair and maintenance works on Whaddon Way, Bletchley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 09:43.

Western Power Distribution (East Midlands) logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Goran Avenue

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Goran Avenue, Stony Stratford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Dec 2024 at 09:41.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Thornborough Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Thornborough Road, Nash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 15:34.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Thornborough Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Thornborough Road, Nash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:54.

Cadent Gas logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Patricks Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Patricks Lane, Deanshanger.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 06:39.

Western Power Distribution (East Midlands) logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Bletchley Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bletchley Road, Newton Longville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Dec 2024 at 14:54.

Anglian Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wolverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 11:44.


Roadworks Map near to Barnet Close, MILTON KEYNES, MK5 6BF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Barnet Close, MILTON KEYNES, MK5 6BF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
RAFT WAY, OXLEY PARK 
(0.7 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
2
Milton Keynes Council logo
HEPBURN CRESCENT, Oxley Park 
(0.7 miles)
Milton Keynes Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.7
Details
Share
Follow