ROADWORKS SUMMARY
Westminster Gardens, BEDFORD, MK42 8TX
Introduction

View current and future planned roadworks and road closures for Westminster Gardens, MK42 8TX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Westminster Gardens, BEDFORD, MK42 8TX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Westminster Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
6 Jan 2025 and 10 Apr 2026
Network Rail were proposing to carry out Works for Rail Purposes on Manor Road, Kempston Hardwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 April 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 Jan 2025 at 16:24.
6 Jan and 31 Oct 2025
Bedford Borough Council were proposing to carry out Highway improvement works on St Pauls Square, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 24 Jan 2025 at 08:58.
6 Jan and 31 Oct 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 17 Dec 2024 at 08:29.
19 Dec 2025
Bedford Borough Council are carrying out roadworks on St Marys Street, Bedford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:00 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Jun 2025 at 08:58.
19 Dec 2025
Bedford Borough Council are carrying out Highway repair and maintenance works on St Pauls Square, Bedford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 5 Jun 2025 at 08:58.
4 Jun and 19 Dec 2025
Bedford Borough Council are proposing to carry out Highway improvement works on High Street, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 5 Jun 2025 at 08:59.
19 Dec 2025
Bedford Borough Council are carrying out Highway improvement works on High Street, Bedford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 June 2025 at 08:00 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 09:54.
25 Oct 2025
Bedford Borough Council are carrying out Highway improvement works on Dame Alice Street, Bedford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 25 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 08:42.
28 Jul and 7 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and cycleway.
This roadwork event was last updated by Bedford Borough Council on 12 Jun 2025 at 12:18.
16 Aug and 7 Nov 2025
Bedford Borough Council are proposing to carry out roadworks on Harpur Street, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 26 Jun 2025 at 14:47.
7 Nov 2025
Bedford Borough Council are carrying out roadworks on Dame Alice Street, Bedford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 August 2025 at 20:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 19 Sep 2025 at 10:43.
16 Aug and 7 Nov 2025
Bedford Borough Council are proposing to carry out roadworks on Dame Alice Street, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 26 Jun 2025 at 14:48.
7 Nov 2025
Bedford Borough Council are carrying out roadworks on Dame Alice Street, Bedford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 August 2025 at 20:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 19 Sep 2025 at 10:44.
16 Aug and 7 Nov 2025
Bedford Borough Council are proposing to carry out roadworks on Dame Alice Street, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 26 Jun 2025 at 14:48.
26 Aug and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Harpur Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 6 Jun 2025 at 08:17.
30 Nov 2025
Bedford Borough Council are carrying out Highway improvement works on Harpur Street, Bedford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 08:00 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 26 Aug 2025 at 08:30.
1 Sep and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 17 Jul 2025 at 10:23.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 19 Aug 2025 at 14:38.
1 Sep and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 22 Jul 2025 at 09:38.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 19 Aug 2025 at 15:59.
1 Sep and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 17 Jul 2025 at 09:31.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 19 Aug 2025 at 15:55.
1 Sep and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 22 Jul 2025 at 09:38.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 19 Aug 2025 at 16:26.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 17 Jul 2025 at 10:19.
1 Sep and 30 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Hassett Street, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bedford Borough Council on 22 Jul 2025 at 10:13.
1 Sep and 30 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Hassett Street, Bedford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 19 Aug 2025 at 13:34.
18 Sep and 19 Dec 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on Bedford Road, Houghton Conquest.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 16 Apr 2025 at 14:42.
18 Sep and 19 Dec 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on Bedford Road, Houghton Conquest.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 3 Oct 2025 at 08:38.
Thursday
Bedford Borough Council are proposing to carry out roadworks on Woburn Road, Wootton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Sep 2025 at 11:36.
Wednesday
Anglian Water are carrying out Utility repair and maintenance works on Dudley Street, Bedford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 13:40 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 10 Oct 2025 at 16:30.
6 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 11:50.
6 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 10:30.
Wednesday
Anglian Water are carrying out Utility repair and maintenance works on Turvey Road, Stagsden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2025 at 14:56 and could run through until 15 October 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 10 Oct 2025 at 09:07.
13 Oct and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 14:45.
Wednesday
Anglian Water are proposing to carry out Remedial works on Elliott Crescent, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 Jul 2025 at 13:12.
Thursday
Anglian Water were proposing to carry out roadworks on Thornton Street, Kempston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Sep 2025 at 13:23.
15 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Gold Lane, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 15:00.
15 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Gold Lane, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 15:27.
15 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Deep Spinney, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 15:30.
15 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Deep Spinney, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 15:42.
20 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 11:49.
20 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Biddenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2025 at 12:55.
21 Oct and 10 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Avon Drive, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:47.
22 and 24 Oct 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:45.
22 and 24 Oct 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:46.
22 Oct and 11 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Avon Drive, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2025 and run through until 11 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 21 Aug 2025 at 15:22.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Avon Drive, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 11:48.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Avon Drive, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 8 Oct 2025 at 10:12.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Torridge Rise, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 11:48.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Torridge Rise, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 8 Oct 2025 at 10:13.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Tyne Crescent, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 11:48.
22 Oct and 11 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Tyne Crescent, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 8 Oct 2025 at 10:12.
25 and 27 Oct 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:44.
25 Oct and 2 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:23.
25 and 27 Oct 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Bedford Borough Council on 21 Aug 2025 at 09:57.
25 and 27 Oct 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:46.
27 Oct and 2 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Harpur Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 21 Aug 2025 at 12:10.
27 Oct and 2 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on High Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 20 Aug 2025 at 12:47.
27 Oct and 2 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on High Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 10:22.
27 Oct and 2 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:45.
27 Oct and 2 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 5 Aug 2025 at 08:43.
27 Oct and 2 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 20 Aug 2025 at 12:45.
27 Oct and 2 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 21 Aug 2025 at 10:29.
27 Oct and 2 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on St Loyes Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 10:22.
27 Oct and 2 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Bromham Road, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 22 Aug 2025 at 10:22.
27 Oct and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Bromham Road, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 15:38.
27 and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Bromham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 10:23.
27 and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Bromham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 11:08.
3 and 14 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on St Marys Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 14 Aug 2025 at 15:24.
3 and 14 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on The Embankment, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 14 Aug 2025 at 15:24.
3 and 14 Nov 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on The Embankment, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 13 Aug 2025 at 09:06.
3 and 14 Nov 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 12 Aug 2025 at 12:23.
3 and 14 Nov 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 12 Aug 2025 at 16:22.
3 and 14 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 14 Aug 2025 at 15:24.
3 and 14 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on St Pauls Square, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 14 Aug 2025 at 15:22.
3 and 14 Nov 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on St Pauls Square, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 12 Aug 2025 at 13:17.
3 and 14 Nov 2025
Bedford Borough Council were proposing to carry out Highway repair and maintenance works on Horne Lane, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 13 Aug 2025 at 09:47.
3 and 14 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Horne Lane, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 14 Aug 2025 at 15:23.
3 and 8 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on High Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:37.
3 and 8 Nov 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 26 Jun 2025 at 15:08.
3 and 8 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on St Peters Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:37.
3 and 8 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on The Broadway, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 8 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:36.
3 and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Bromham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 11:23.
3 and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Bromham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 15:32.
3 and 5 Nov 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Woodfield Lane, Renhold.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Sep 2025 at 09:19.
7 and 24 Nov 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Bromham Road, Biddenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 20 Aug 2025 at 14:57.
10 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Bedford Road, Wilstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:50.
10 and 15 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 17 Jun 2025 at 18:34.
10 and 15 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Dame Alice Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:22.
10 and 15 Nov 2025
Bedford Borough Council were proposing to carry out Highway improvement works on Harpur Street, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 24 Jun 2025 at 17:22.
24 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Barkers Lane, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 07:05.
24 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Barkers Lane, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 12:55.
24 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Barkers Lane, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 09:39.
24 and 26 Nov 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Pavenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 9 Sep 2025 at 15:03.
1 Dec 2025 and 13 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on Cotton End Road, Wilstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 15:20.
1 Dec 2025 and 13 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on Cotton End Road, Wilstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 16:54.
1 and 3 Dec 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Bedford Road, Kempston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Aug 2025 at 06:48.
1 and 3 Dec 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Thornton Street, Kempston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Aug 2025 at 08:23.
1 and 3 Dec 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Thornton Street, Kempston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Sep 2025 at 13:23.
1 and 15 Dec 2025
BT were proposing to carry out Utility asset works on The Grove, Bedford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Sep 2025 at 14:01.
2 and 4 Dec 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Mill Lane, Houghton Conquest.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Aug 2025 at 10:32.
3 and 18 Dec 2025
Bedford Borough Council are proposing to carry out roadworks on Stagsden Road, Bromham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bedford Borough Council on 13 Aug 2025 at 07:13.
10 and 12 Dec 2025
Anglian Water were proposing to carry out New service connection on Stagsden Road, Bromham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Sep 2025 at 09:54.
5 and 23 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Northwood Lane, Wilstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 13:30.
5 and 23 Jan 2026
Cadent Gas were proposing to carry out Utility asset works on Northwood Lane, Wilstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 23 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 12:14.
5 and 23 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Northwood Lane, Wilstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 14:01.
5 Jan and 31 Aug 2026
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 10:28.
5 Jan and 31 Aug 2026
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 11:41.
5 Jan and 31 Aug 2026
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 11:41.
5 Jan and 31 Aug 2026
Bedford Borough Council are proposing to carry out Highway improvement works on Greyfriars, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 11:40.
5 Jan and 31 Aug 2026
Bedford Borough Council are proposing to carry out Highway improvement works on Hassett Street, Bedford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Sep 2025 at 11:40.
5 and 14 Jan 2026
Bedford Borough Council were proposing to carry out Highway improvement works on Church End, Biddenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 14 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 16 Sep 2025 at 09:21.
5 and 14 Jan 2026
Bedford Borough Council were proposing to carry out Highway improvement works on Gold Lane, Biddenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 14 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 16 Sep 2025 at 09:19.
5 and 14 Jan 2026
Bedford Borough Council were proposing to carry out Highway improvement works on Duck End Lane, Biddenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 14 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 16 Sep 2025 at 09:20.
5 and 30 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Goldington Road, Bedford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:49.
6 and 8 Jan 2026
Anglian Water are proposing to carry out New service connection on Stagsden Road, Bromham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2026 and could run through until 8 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 19 Sep 2025 at 12:43.
7 and 9 Jan 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Risborough Road, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 3 Oct 2025 at 14:20.
7 and 9 Jan 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Princes Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Sep 2025 at 10:06.
7 and 9 Jan 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Princes Street, Bedford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Sep 2025 at 14:25.
Roadworks Map near to Westminster Gardens, BEDFORD, MK42 8TX (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Westminster Gardens, BEDFORD, MK42 8TX (2 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.