ROADWORKS SUMMARY
Granet Close, BEDFORD, MK40 4HZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Granet Close, MK40 4HZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Granet Close, BEDFORD, MK40 4HZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Granet Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bedford Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Manton Lane

Bedford Borough Council are carrying out Highway repair and maintenance works on Manton Lane, Bedford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 9 Jan 2025 at 15:34.

Bedford Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Bedford Borough Council are carrying out Highway improvement works on Clapham Road, Bedford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 9 Jan 2025 at 15:31.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Western Street

Bedford Borough Council are carrying out Highway improvement works on Western Street, Bedford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 12:40.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 31 Oct 2025
Details
View Map
Share
Follow
St Pauls Square

Bedford Borough Council are proposing to carry out Highway improvement works on St Pauls Square, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 2 Oct 2024 at 12:20.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 31 Oct 2025
Details
View Map
Share
High Street

Bedford Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Bedford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 17 Dec 2024 at 08:29.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Midland Road

Bedford Borough Council were proposing to carry out Highway improvement works on Midland Road, Bedford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 11 Oct 2024 at 07:24.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Midland Road

Bedford Borough Council are proposing to carry out Highway improvement works on Midland Road, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 23 Oct 2024 at 11:02.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Midland Road

Bedford Borough Council are carrying out Highway improvement works on Midland Road, Bedford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 12:41.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Western Street

Bedford Borough Council are proposing to carry out Highway improvement works on Western Street, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Dec 2024 at 13:50.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Priory Street

Bedford Borough Council are proposing to carry out Highway improvement works on Priory Street, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 17 Oct 2024 at 16:30.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Battison Street

Bedford Borough Council are proposing to carry out Highway improvement works on Battison Street, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Dec 2024 at 13:50.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Battison Street

Bedford Borough Council are carrying out Highway improvement works on Battison Street, Bedford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 12:42.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Maitland Street

Bedford Borough Council are proposing to carry out Highway improvement works on Maitland Street, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Dec 2024 at 13:49.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Maitland Street

Bedford Borough Council are carrying out Highway improvement works on Maitland Street, Bedford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 12:45.

Bedford Borough Council logo
LONG TERM
Between
6 Jan and 6 May 2025
Details
View Map
Share
Follow
Costin Street

Bedford Borough Council are proposing to carry out Highway improvement works on Costin Street, Bedford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Dec 2024 at 13:50.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Costin Street

Bedford Borough Council are carrying out Highway improvement works on Costin Street, Bedford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 12:46.

Bedford Borough Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Priory Street

Bedford Borough Council are carrying out Highway improvement works on Priory Street, Bedford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Jan 2025 at 12:19.

UK Power Networks Eastern & London logo
Until
31 Jan 2025
Details
View Map
Share
Follow
Springfield Avenue

UK Power Networks Eastern & London are carrying out Utility asset works on Springfield Avenue, Kempston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 08:44.

UK Power Networks Eastern & London logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Springfield Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Springfield Avenue, Kempston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Nov 2024 at 08:39.

Network Rail logo
LONG TERM
Between
6 Jan 2025 and 10 Apr 2026
Details
View Map
Share
Manor Road

Network Rail were proposing to carry out Works for Rail Purposes on Manor Road, Kempston Hardwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 April 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 16:24.

Bedford Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Murdock Road

Bedford Borough Council are proposing to carry out Highway improvement works on Murdock Road, Bedford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bedford Borough Council on 16 Jan 2025 at 15:02.

Bedford Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Murdock Road

Bedford Borough Council are carrying out Highway improvement works on Murdock Road, Bedford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 08:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bedford Borough Council on 16 Jan 2025 at 15:06.

Bedford Borough Council logo
Until
27 Jan 2025
Details
View Map
Share
Follow
Milton Road

Bedford Borough Council are carrying out Highway repair and maintenance works on Milton Road, Clapham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 20:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Jan 2025 at 12:35.

Bedford Borough Council logo
Until
27 Jan 2025
Details
View Map
Share
Follow
Twinwood Road

Bedford Borough Council are carrying out Highway repair and maintenance works on Twinwood Road, Clapham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 20:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Jan 2025 at 12:35.

Bedford Borough Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Milton Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Milton Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 31 Oct 2024 at 12:07.

Bedford Borough Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Twinwood Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Twinwood Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 31 Oct 2024 at 12:35.

Bedford Borough Council logo
Until
27 Jan 2025
Details
View Map
Share
Follow
The Glebe

Bedford Borough Council are carrying out Highway repair and maintenance works on The Glebe, Clapham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 20:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Jan 2025 at 12:36.

Bedford Borough Council logo
Until
29 Jan 2025
Details
View Map
Share
Follow
Harrowden Road Service Road

Bedford Borough Council are carrying out Highway repair and maintenance works on Harrowden Road Service Road, Bedford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 08:00 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Jan 2025 at 18:37.

Bedford Borough Council logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Harrowden Road Service Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Harrowden Road Service Road, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 31 Oct 2024 at 11:58.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kimbolton Road

Anglian Water are carrying out Utility repair and maintenance works on Kimbolton Road, Bedford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 13:47 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Jan 2025 at 15:30.

UK Power Networks Eastern & London logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Margetts Road

UK Power Networks Eastern & London are carrying out Utility asset works on Margetts Road, Kempston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 10:53 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 11:55.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, Wootton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:05.

Cadent Gas logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are carrying out Utility asset works on Bedford Road, Wootton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:22 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 08:25.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Green Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Green Lane, Clapham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 09:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Margetts Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Margetts Road, Kempston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 05:40.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
St Alban Road

Anglian Water were proposing to carry out Utility repair and maintenance works on St Alban Road, Bedford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 09:04.

Anglian Water logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
West End

Anglian Water were proposing to carry out Utility repair and maintenance works on West End, Stevington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Nov 2024 at 14:36.

Anglian Water logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Hurst Grove

Anglian Water were proposing to carry out Utility repair and maintenance works on Hurst Grove, Bedford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Dec 2024 at 16:08.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Wootton Road

Cadent Gas are proposing to carry out Utility asset works on Wootton Road, Kempston Rural.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 00:10.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Wootton Road

Cadent Gas are proposing to carry out Utility asset works on Wootton Road, Kempston Rural.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:03.

Bedford Borough Council logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Furzefield

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Furzefield, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Nov 2024 at 10:51.

Bedford Borough Council logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Fairholme

Bedford Borough Council were proposing to carry out Highway repair and maintenance works on Fairholme, Bedford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 7 Nov 2024 at 14:59.

Bedford Borough Council logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Fairholme

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Fairholme, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Nov 2024 at 10:51.

Bedford Borough Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Main Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Main Road, Biddenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 13 Nov 2024 at 11:57.

Bedford Borough Council logo
Between
10 and 20 Feb 2025
Details
View Map
Share
Follow
Lorraine Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Lorraine Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 14 Nov 2024 at 14:28.

Bedford Borough Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Turvey Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Turvey Road, Stagsden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 15 Nov 2024 at 13:10.

Bedford Borough Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Church Lane

Bedford Borough Council were proposing to carry out Highway repair and maintenance works on Church Lane, Stagsden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 15 Nov 2024 at 13:30.

Bedford Borough Council logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Station Road, Willington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 18 Nov 2024 at 18:20.

Bedford Borough Council logo
Between
10 and 20 Feb 2025
Details
View Map
Share
Follow
Dimmock Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Dimmock Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 19 Nov 2024 at 10:37.

Bedford Borough Council logo
Between
10 and 20 Feb 2025
Details
View Map
Share
Follow
Studley Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Studley Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 19 Nov 2024 at 10:38.

Bedford Borough Council logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Church Lane

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Church Lane, Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 15:21.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Oakley Road

Bedford Borough Council are proposing to carry out Highway improvement works on Oakley Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 15:30.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Lovell Road

Bedford Borough Council were proposing to carry out Highway improvement works on Lovell Road, Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 15 Nov 2024 at 15:06.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lovell Road

Bedford Borough Council are proposing to carry out Highway improvement works on Lovell Road, Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 18 Nov 2024 at 12:09.

Anglian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
West End

Anglian Water are proposing to carry out Utility repair and maintenance works on West End, Stevington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 15:21.

Bedford Borough Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Main Road, Biddenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 15 Nov 2024 at 13:13.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Lovell Road

Bedford Borough Council were proposing to carry out Highway improvement works on Lovell Road, Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 15 Nov 2024 at 15:10.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Oakley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Oakley Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 14:25.

Bedford Borough Council logo
Between
21 and 23 Feb 2025
Details
View Map
Share
Follow
Church Lane

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Church Lane, Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 15:21.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Oakley Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Oakley Road, Clapham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 13:51.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Oakley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Oakley Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 11:57.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Oakley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Oakley Road, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 13:02.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Bedford Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bedford Road, Milton Ernest.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 11:56.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
George Street

Anglian Water are proposing to carry out Utility repair and maintenance works on George Street, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 11:59.

Bedford Borough Council logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
London Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on London Road, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 4 Dec 2024 at 12:40.

Bedford Borough Council logo
Between
6 and 11 Mar 2025
Details
View Map
Share
Follow
Rope Walk

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Rope Walk, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 4 Dec 2024 at 13:01.

Bedford Borough Council logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Keeley Lane

Bedford Borough Council are proposing to carry out Section 50 on Keeley Lane, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 16 Jan 2025 at 17:04.

Bedford Borough Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Robins Folly

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Robins Folly, Thurleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 5 Dec 2024 at 12:18.

Bedford Borough Council logo
Between
21 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Kingswood Way

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Kingswood Way, Great Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 5 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 6 Jan 2025 at 13:52.

Bedford Borough Council logo
Between
21 Mar and 5 Apr 2025
Details
View Map
Share
Follow
The Branston Way

Bedford Borough Council are proposing to carry out roadworks on The Branston Way, Great Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 17 Dec 2024 at 14:43.

Bedford Borough Council logo
Between
21 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Carnoustie Drive

Bedford Borough Council are proposing to carry out roadworks on Carnoustie Drive, Great Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 17 Dec 2024 at 14:44.

BT logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Eugster Avenue

BT were proposing to carry out Utility asset works on Eugster Avenue, Kempston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Dec 2024 at 13:05.

Bedford Borough Council logo
LONG TERM
Between
31 Mar and 10 May 2025
Details
View Map
Share
Follow
The Embankment

Bedford Borough Council are proposing to carry out Highway improvement works on The Embankment, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 24 Dec 2024 at 12:34.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
St Pauls Road

Anglian Water are proposing to carry out Utility repair and maintenance works on St Pauls Road, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Jan 2025 at 11:20.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
St Pauls Road

Anglian Water are proposing to carry out Utility repair and maintenance works on St Pauls Road, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 11:02.

Bedford Borough Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Goldington Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Goldington Road, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 4 Dec 2024 at 13:13.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Bedford Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bedford Road, Milton Ernest.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 15:45.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Bedford Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Bedford Road, Milton Ernest.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 12:29.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Bedford Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bedford Road, Milton Ernest.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 12:30.

Bedford Borough Council logo
Between
10 and 12 Apr 2025
Details
View Map
Share
Follow
Rope Walk

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Rope Walk, Bedford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 4 Dec 2024 at 13:01.

Bedford Borough Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Bedford Road

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Kempston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 16 Jan 2025 at 12:13.

Bedford Borough Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Bedford Road

Bedford Borough Council were proposing to carry out Highway repair and maintenance works on Bedford Road, Kempston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bedford Borough Council on 16 Jan 2025 at 12:12.


Roadworks Map near to Granet Close, BEDFORD, MK40 4HZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Jan 2025 18:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Granet Close, BEDFORD, MK40 4HZ (46 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bedford Borough Council logo
MAJOR
  
ASHBURNHAM ROAD 
(0.1 miles)
Bedford Borough Council
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
In Progress
Since: 29 Jul 2024 16:00
(Scheduled: 29 Jul 2024 - 30 Apr 2025)
0.1
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
HURST GROVE 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Jan 2025 08:49
(Scheduled: 17 Jan 2025 - 27 Jan 2025)
0.2
Details
Share
Follow
3
Anglian Water logo
CLAPHAM ROAD 
(0.4 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 20 Jan 2025 - 22 Jan 2025
0.4
Details
Share
Follow
4
Bedford Borough Council logo
CLAPHAM ROAD 
(0.4 miles)
Bedford Borough Council
New service connection - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 24 Jan 2025
0.4
Details
Share
Follow
5
Bedford Borough Council logo
MAJOR
  
FORD END ROAD 
(0.5 miles)
Bedford Borough Council
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
In Progress
Since: 29 Jul 2024 16:00
(Scheduled: 29 Jul 2024 - 30 Apr 2025)
0.5
Details
Share
Follow
6
Bedford Borough Council logo
MAJOR
  
MIDLAND ROAD 
(0.5 miles)
Bedford Borough Council
Highway improvement works - Footway, Carriageway - Lane closure
Cancelled
(Scheduled: 6 Jan 2025 - 6 May 2025)
0.5
Details
Share
7
Bedford Borough Council logo
MAJOR
  
MIDLAND ROAD 
(0.5 miles)
Bedford Borough Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 6 Jan 2025 - 6 May 2025
0.5
Details
Share
Follow
8
Bedford Borough Council logo
MAJOR
  
MIDLAND ROAD 
(0.5 miles)
Bedford Borough Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 6 Jan 2025 08:00
(Scheduled: 6 Jan 2025 - 6 May 2025)
0.5
Details
Share
Follow
9
Bedford Borough Council logo
MAJOR
  
ALEXANDRA ROAD 
(0.5 miles)
Bedford Borough Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 6 May 2025
0.5
Details
Share
Follow
10
Bedford Borough Council logo
MAJOR
  
ALEXANDRA ROAD 
(0.5 miles)
Bedford Borough Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 6 Jan 2025 08:00
(Scheduled: 6 Jan 2025 - 6 May 2025)
0.5
Details
Share
Follow
  • ...