ROADWORKS SUMMARY
School Lane, BUCKINGHAM, MK18 4LS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for School Lane, MK18 4LS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to School Lane, BUCKINGHAM, MK18 4LS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for School Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Beech Close

Buckinghamshire Council are carrying out Highway improvement works on Beech Close, Buckingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Jan 2025 at 09:58.

ESP Electricity logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ESP Electricity on 8 Oct 2024 at 15:53.

ESP Electricity logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 15:05.

Buckinghamshire Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 08:36.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 10:31.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are carrying out Highway improvement works on Bicester Road, Marsh Gibbon.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 16 February 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 09:30.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 10:31.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 10:31.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 09:03.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 08:59.

Buckinghamshire Council logo
Today
Details
View Map
Share
Bicester Road

Buckinghamshire Council carried out Highway improvement works on Bicester Road, Marsh Gibbon.

The road was closed for some or all of the period.

The works were completed on 16 February 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Feb 2025 at 08:49.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 13:29.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 10:23.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 14:15.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mitre Street

Buckinghamshire Council are proposing to carry out roadworks on Mitre Street, Buckingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Jan 2025 at 15:19.

Buckinghamshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Jubilee Farm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Jubilee Farm Road, Hillesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Jan 2025 at 10:04.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Feb 2025 at 16:25.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Feb 2025 at 10:01.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Jan 2025 at 11:12.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pound Lane

Buckinghamshire Council are proposing to carry out Section 50 on Pound Lane, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 15:04.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pound Lane

Buckinghamshire Council are proposing to carry out Section 50 on Pound Lane, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 7 Feb 2025 at 15:34.

Vodafone logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Buckingham Road

Vodafone are proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 17 Dec 2024 at 09:45.

Buckinghamshire Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
North End Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on North End Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 15:00.

Buckinghamshire Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Stone Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stone Road, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Nov 2024 at 11:51.

Buckinghamshire Council logo
Between
2 and 7 Mar 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:45.

Buckinghamshire Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Jan 2025 at 14:11.

Thames Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Launton Road

Thames Water were proposing to carry out Utility repair and maintenance works on Launton Road, Stratton Audley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 7 Jan 2025 at 09:37.

Anglian Water logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Jan 2025 at 11:37.

Anglian Water logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Jan 2025 at 10:13.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Gawcott Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gawcott Road, Buckingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 13:05.

Buckinghamshire Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Middle Claydon

Buckinghamshire Council are proposing to carry out Core Sampling on Middle Claydon, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:00.

Oxfordshire County Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road, Mixbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Nov 2024 at 12:17.

Oxfordshire County Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road, Mixbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Nov 2024 at 12:19.

West Northamptonshire Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Buckingham Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Buckingham Road, Evenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 30 Oct 2024 at 06:21.

West Northamptonshire Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Buckingham Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Buckingham Road, Evenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 9 Jan 2025 at 06:10.

Buckinghamshire Council logo
Between
30 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Jubilee Farm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Jubilee Farm Road, Hillesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 15:23.

Thames Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Launton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Launton Road, Stratton Audley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:46.

Buckinghamshire Council logo
Between
6 and 10 Apr 2025
Details
View Map
Share
West Street

Buckinghamshire Council were proposing to carry out Highway improvement works on West Street, Steeple Claydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 08:37.

Anglian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 08:09.

Vodafone logo
Between
7 and 14 Apr 2025
Details
View Map
Share
Follow
Buckingham Road

Vodafone are proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 14 Feb 2025 at 10:17.

Vodafone logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Buckingham Road

Vodafone were proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 17 Jan 2025 at 14:49.

Anglian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Jan 2025 at 14:36.

Buckinghamshire Council logo
Between
11 and 13 Apr 2025
Details
View Map
Share
West Street

Buckinghamshire Council were proposing to carry out Highway improvement works on West Street, Steeple Claydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 April 2025 and run through until 13 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 08:36.

Anglian Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Padbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 10 Oct 2024 at 14:47.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Padbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 11:02.

Buckinghamshire Council logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:23.

Buckinghamshire Council logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:52.

Buckinghamshire Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Edgcott Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Edgcott Road, Marsh Gibbon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:45.

Buckinghamshire Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marsh Gibbon Road, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:46.

Buckinghamshire Council logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Lawn Hill

Buckinghamshire Council were proposing to carry out Highway improvement works on Lawn Hill, Edgcott.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 April 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Feb 2025 at 10:23.

Buckinghamshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Sandholme

Buckinghamshire Council are proposing to carry out Highway improvement works on Sandholme, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Jan 2025 at 16:18.

Buckinghamshire Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Edgcott Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Edgcott Road, Marsh Gibbon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Jan 2025 at 10:44.

Buckinghamshire Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marsh Gibbon Road, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Jan 2025 at 11:02.

Buckinghamshire Council logo
Between
10 and 12 May 2025
Details
View Map
Share
Follow
Middle Claydon

Buckinghamshire Council are proposing to carry out Core Sampling on Middle Claydon, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 09:35.


Roadworks Map near to School Lane, BUCKINGHAM, MK18 4LS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 12:14
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to School Lane, BUCKINGHAM, MK18 4LS (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
MAJOR
  
MAIN STREET 
(0.1 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 17 Feb 2025 - 20 Feb 2025)
0.1
Details
Share
2
Anglian Water logo
MAJOR
  
MAIN STREET 
(0.1 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 17 Feb 2025 - 20 Feb 2025)
0.1
Details
Share
3
Anglian Water logo
PRESTON BISSETT ROAD 
(1.0 miles)
Anglian Water
Utility asset works - Verge - Some carriageway incursion
In Progress
Since: 11 Feb 2025 08:30
(Scheduled: 10 Feb 2025 - 24 Feb 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.