ROADWORKS SUMMARY
Bass Close, MK18 2QZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bass Close, MK18 2QZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bass Close, MK18 2QZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bass Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Furze Lane

Network Rail are carrying out roadworks on Furze Lane, Winslow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Sep 2024 at 08:36.

Buckinghamshire Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
North Farm Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on North Farm Lane, Grendon Underwood.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 13:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 13:46.

Buckinghamshire Council logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
New Inn Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on New Inn Lane, Gawcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Jul 2024 at 10:45.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are carrying out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:49.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 1 Aug 2024 at 13:48.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 11:13.

ESP Electricity logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are carrying out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 31 December 2024. The works will impact the verge only.

This roadwork event was last updated by ESP Electricity on 14 Nov 2024 at 14:04.

Buckinghamshire Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
North Farm Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on North Farm Lane, Grendon Underwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 00:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 09:39.

Buckinghamshire Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
New Inn Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on New Inn Lane, Gawcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:06.

Buckinghamshire Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Preston Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Preston Road, Gawcott.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Nov 2024 at 09:46.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Queen Catherine Road

Network Rail are proposing to carry out Works for Rail Purposes on Queen Catherine Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 09:25.

Anglian Water logo
Finishing
Today
Details
View Map
Share
Follow
Winslow Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Winslow Road, Granborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Aug 2024 at 16:20.

Buckinghamshire Council logo
Between
21 Nov and 11 Dec 2024
Details
View Map
Share
School Lane

Buckinghamshire Council were proposing to carry out Highway improvement works on School Lane, Twyford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 21 Oct 2024 at 10:37.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Aylesbury Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Aylesbury Road, Winslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 10:31.

Buckinghamshire Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Main Street

Buckinghamshire Council are proposing to carry out Highway improvement works on Main Street, Gawcott.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Aug 2024 at 15:01.

Buckinghamshire Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stowe Avenue

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stowe Avenue, Buckingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Aug 2024 at 10:17.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Swanbourne Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Swanbourne Road, Winslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 10:36.

Anglian Water logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility asset works on Main Street, Chetwode.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 11:53.

Anglian Water logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility asset works on Main Street, Chetwode.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 12:58.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Swanbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swanbourne Road, Winslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2024 at 11:38.

Buckinghamshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
West Street

Buckinghamshire Council are proposing to carry out Highway improvement works on West Street, Buckingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 10:22.

Network Rail logo
Finishing
Thursday
Details
View Map
Share
Follow
Queen Catherine Road

Network Rail are proposing to carry out Works for Rail Purposes on Queen Catherine Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 09:34.

Network Rail logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Queen Catherine Road

Network Rail are proposing to carry out Works for Rail Purposes on Queen Catherine Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 19 Nov 2024 at 08:34.

Buckinghamshire Council logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
School End

Buckinghamshire Council are proposing to carry out Section 50 on School End, Great Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Aug 2024 at 15:10.

Buckinghamshire Council logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Sandhill Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Sandhill Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 12:44.

Anglian Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Herds Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Herds Hill, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 23 Aug 2024 at 12:59.

Anglian Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Herds Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Herds Hill, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 28 Aug 2024 at 15:32.

Buckinghamshire Council logo
Between
28 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Nov 2024 at 11:13.

Buckinghamshire Council logo
Between
28 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Nov 2024 at 10:54.

Buckinghamshire Council logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Edgcott Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Edgcott Road, Hillesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Nov 2024 at 13:09.

Network Rail logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Queen Catherine Road

Network Rail are proposing to carry out Works for Rail Purposes on Queen Catherine Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 19 Nov 2024 at 08:34.

Buckinghamshire Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Manor Farm Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Manor Farm Road, Barton Hartshorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Sep 2024 at 09:50.

Buckinghamshire Council logo
Between
9 and 28 Dec 2024
Details
View Map
Share
Follow
Preston Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Preston Road, Gawcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Aug 2024 at 10:11.

Buckinghamshire Council logo
Between
9 and 28 Dec 2024
Details
View Map
Share
Follow
Radclive Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Radclive Road, Gawcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Aug 2024 at 10:12.

Buckinghamshire Council logo
Between
9 and 28 Dec 2024
Details
View Map
Share
Follow
Hillesden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hillesden Road, Gawcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Aug 2024 at 10:12.

Buckinghamshire Council logo
Between
13 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Twyford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford Road, Poundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Jul 2024 at 11:39.

Buckinghamshire Council logo
Between
13 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Jul 2024 at 10:59.

Buckinghamshire Council logo
Between
13 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Twyford To Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford To Marsh Gibbon Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Jul 2024 at 11:28.

Buckinghamshire Council logo
Between
22 and 27 Dec 2024
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 11:15.

Buckinghamshire Council logo
Between
22 and 27 Dec 2024
Details
View Map
Share
Follow
Twyford To Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford To Marsh Gibbon Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 08:42.

Buckinghamshire Council logo
Between
22 and 27 Dec 2024
Details
View Map
Share
Follow
Twyford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford Road, Poundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 11:15.

Buckinghamshire Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
South Hall

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on South Hall, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 14:18.

Anglian Water logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Steeple Claydon To Calvert Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Steeple Claydon To Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 15:41.

Anglian Water logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Steeple Claydon To Calvert Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Steeple Claydon To Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 10:08.

Anglian Water logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Steeple Claydon To Calvert Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Steeple Claydon To Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 11:49.

ESP Electricity logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by ESP Electricity on 8 Oct 2024 at 15:53.

ESP Electricity logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 15:05.

Anglian Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 13:34.

Anglian Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:38.

Anglian Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 11:53.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Oct 2024 at 14:03.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Oct 2024 at 14:03.

Buckinghamshire Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Twyford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford Road, Poundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:58.

Buckinghamshire Council logo
Between
21 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:03.

Anglian Water logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 1 Nov 2024 at 12:52.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:58.

Anglian Water logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 10:05.

Buckinghamshire Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Sandhill Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Sandhill Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Oct 2024 at 08:37.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Singleborough Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Singleborough Lane, Singleborough, Great Horwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 12:52.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Singleborough Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Singleborough Lane, Singleborough, Great Horwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 09:04.

Buckinghamshire Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 08:36.

Buckinghamshire Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 10:03.

Anglian Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 12:29.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 13:29.

Anglian Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 14:15.

Anglian Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 13:16.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Winslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 14:26.

Buckinghamshire Council logo
Between
18 Feb and 1 Mar 2025
Details
View Map
Share
Follow
North Farm Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on North Farm Lane, Grendon Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Nov 2024 at 14:43.


Roadworks Map near to Bass Close, MK18 2QZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bass Close, MK18 2QZ (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Buckinghamshire Council logo
BUCKINGHAM ROAD 
(0.2 miles)
Buckinghamshire Council
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.2
Details
Share
Follow
2
QUEEN CATHERINE ROAD 
(0.2 miles)
Internetty.uk
Statutory Infrastructure Works - Footway - Give and take
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
3
WEST STREET 
(0.5 miles)
Internetty.uk
Statutory Infrastructure Works - Verge - No carriageway incursion
In Progress
Since: 21 Nov 2024 12:00
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.5
Details
Share
Follow
4
Network Rail logo
MAJOR
  
QUEEN CATHERINE ROAD 
(0.5 miles)
Network Rail
Works for Rail Purposes - Carriageway, Verge - Road closure
Planned
Scheduled: 18 Nov 2024 - 22 Nov 2024
0.5
Details
Share
Follow
5
Anglian Water logo
MAJOR
  
HERDS HILL 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Carriageway, Verge - Road closure
Planned
Scheduled: 23 Nov 2024 - 24 Nov 2024
0.7
Details
Share
Follow
6
Anglian Water logo
MAJOR
  
HERDS HILL 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Carriageway, Verge - Road closure
Planned
Scheduled: 23 Nov 2024 - 24 Nov 2024
0.7
Details
Share
Follow
7
HS2 logo
STEEPLE CLAYDON TO CALVERT ROAD 
(0.8 miles)
HS2
Works for Rail Purposes - Footway, Verge - No carriageway incursion
In Progress
Since: 14 Oct 2024 10:00
(Scheduled: 14 Oct 2024 - 11 Apr 2025)
0.8
Details
Share
Follow
8
HS2 logo
STEEPLE CLAYDON FOOTPATH 8 
(0.8 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
In Progress
Since: 8 Jul 2024 08:00
(Scheduled: 8 Jul 2024 - 31 May 2026)
0.8
Details
Share
Follow