Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for North End Road, MK18 2PF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to North End Road, BUCKINGHAM, MK18 2PF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for North End Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Furze Lane

Network Rail are carrying out roadworks on Furze Lane, Winslow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 13:07.

Buckinghamshire Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Beech Close

Buckinghamshire Council are carrying out Highway improvement works on Beech Close, Buckingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Jan 2025 at 09:58.

ESP Electricity logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by ESP Electricity on 8 Oct 2024 at 15:53.

ESP Electricity logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Tingewick Bypass

ESP Electricity are proposing to carry out Utility asset works on Tingewick Bypass, Tingewick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 15:05.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Oct 2024 at 14:03.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Calvert Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Calvert Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Oct 2024 at 14:03.

Buckinghamshire Council logo
Today
Details
View Map
Share
Middle Claydon

Buckinghamshire Council carried out Highway improvement works on Middle Claydon, Middle Claydon.

The road was closed for some or all of the period.

The works were completed on 21 January 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Jan 2025 at 11:21.

Buckinghamshire Council logo
Between
21 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:03.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Twyford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Twyford Road, Poundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:58.

Buckinghamshire Council logo
Today
Details
View Map
Share
Middle Claydon

Buckinghamshire Council carried out Highway improvement works on Middle Claydon, Middle Claydon.

The road was closed for some or all of the period.

The works were completed on 21 January 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Jan 2025 at 11:11.

Buckinghamshire Council logo
Today
Details
View Map
Share
Three Points Lane

Buckinghamshire Council carried out Highway improvement works on Three Points Lane, Botolph Claydon.

The road was closed for some or all of the period.

The works were completed on 21 January 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Jan 2025 at 12:16.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Castle Street

Buckinghamshire Council are carrying out Highway repair and maintenance works on Castle Street, Marsh Gibbon.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 21 January 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Jan 2025 at 09:10.

Buckinghamshire Council logo
Today
Details
View Map
Share
North Farm Lane

Buckinghamshire Council carried out Highway improvement works on North Farm Lane, Grendon Underwood.

The road was closed for some or all of the period.

The works were completed on 21 January 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Jan 2025 at 14:11.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 1 Nov 2024 at 12:52.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:58.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 10:05.

Buckinghamshire Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Sandhill Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Sandhill Road, Middle Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Oct 2024 at 08:37.

Cityfibre Metro Networks logo
Between
30 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on High Street, Thornborough.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 12:10.

Buckinghamshire Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
North End Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on North End Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Jan 2025 at 08:47.

Buckinghamshire Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
West Edge

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on West Edge, Marsh Gibbon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Jan 2025 at 08:48.

Buckinghamshire Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 08:36.

Buckinghamshire Council logo
Between
3 and 15 Feb 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Jan 2025 at 14:08.

Anglian Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 12:29.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Tingewick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 13:29.

Cityfibre Metro Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on High Street, Thornborough.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 15:56.

Anglian Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 10:23.

Anglian Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 14:15.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Winslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 14:26.

Buckinghamshire Council logo
Between
18 Feb and 1 Mar 2025
Details
View Map
Share
Follow
North Farm Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on North Farm Lane, Grendon Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Nov 2024 at 14:43.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pound Lane

Buckinghamshire Council are proposing to carry out Section 50 on Pound Lane, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 15:04.

Vodafone logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Buckingham Road

Vodafone are proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 17 Dec 2024 at 09:45.

Buckinghamshire Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
North End Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on North End Road, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 15:00.

Buckinghamshire Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Stone Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stone Road, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Nov 2024 at 11:51.

Buckinghamshire Council logo
Between
2 and 7 Mar 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:45.

Buckinghamshire Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Stratford Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stratford Road, Maids Moreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Jan 2025 at 14:11.

Anglian Water logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Jan 2025 at 11:23.

Anglian Water logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Adstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Jan 2025 at 11:37.

Anglian Water logo
Between
25 Mar and 17 Apr 2025
Details
View Map
Share
Buckingham Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Buckingham Road, Winslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Jan 2025 at 15:21.

Buckinghamshire Council logo
Between
30 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Jubilee Farm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Jubilee Farm Road, Hillesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 15:23.

National Grid Electricity Transmission logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Bicester Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Bicester Road, Ludgershall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 7 Jan 2025 at 14:00.

Buckinghamshire Council logo
Between
6 and 10 Apr 2025
Details
View Map
Share
Follow
West Street

Buckinghamshire Council are proposing to carry out Highway improvement works on West Street, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 10:33.

Vodafone logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Buckingham Road

Vodafone were proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 17 Jan 2025 at 14:49.

Anglian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 08:09.

Anglian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Preston Bissett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Jan 2025 at 14:36.

Vodafone logo
Between
7 and 14 Apr 2025
Details
View Map
Share
Follow
Buckingham Road

Vodafone are proposing to carry out Utility asset works on Buckingham Road, Newton Purcell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 17 Jan 2025 at 14:51.

Buckinghamshire Council logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Shipton Lee Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Shipton Lee Road, Grendon Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Jan 2025 at 15:43.

Buckinghamshire Council logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Lee Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Lee Road, Quainton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Jan 2025 at 15:48.

Buckinghamshire Council logo
Between
11 and 13 Apr 2025
Details
View Map
Share
Follow
West Street

Buckinghamshire Council are proposing to carry out Highway improvement works on West Street, Steeple Claydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:23.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Padbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 11:02.

Anglian Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Main Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Street, Padbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 10 Oct 2024 at 14:47.

Buckinghamshire Council logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Tingewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Tingewick Road, Buckingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 14:54.

Buckinghamshire Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Edgcott Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Edgcott Road, Marsh Gibbon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:45.

Buckinghamshire Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marsh Gibbon Road, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:46.

Buckinghamshire Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Marsh Gibbon Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marsh Gibbon Road, Grendon Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Dec 2024 at 12:47.

Buckinghamshire Council logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Follow
Lawn Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Lawn Hill, Edgcott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Dec 2024 at 12:00.

Buckinghamshire Council logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Follow
Shipton Lee Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Shipton Lee Road, Grendon Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Jan 2025 at 14:22.

Buckinghamshire Council logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Follow
Shipton Lee

Buckinghamshire Council are proposing to carry out Highway improvement works on Shipton Lee, Quainton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Jan 2025 at 12:07.


Roadworks Map near to North End Road, BUCKINGHAM, MK18 2PF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Jan 2025 18:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to North End Road, BUCKINGHAM, MK18 2PF (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
URGENT
  
BUCKINGHAM ROAD 
(0.4 miles)
Anglian Water
Utility repair and maintenance works - Verge - Some carriageway incursion
Complete
16 Jan 2025 09:27 - 17 Jan 2025 16:07
0.4
Details
Share
2
HS2 logo
STEEPLE CLAYDON TO CALVERT ROAD 
(0.5 miles)
HS2
Works for Rail Purposes - Footway, Verge - No carriageway incursion
In Progress
Since: 14 Oct 2024 10:00
(Scheduled: 14 Oct 2024 - 11 Apr 2025)
0.5
Details
Share
Follow
3
HS2 logo
STEEPLE CLAYDON FOOTPATH 8 
(0.7 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
In Progress
Since: 8 Jul 2024 08:00
(Scheduled: 8 Jul 2024 - 31 May 2026)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.