ROADWORKS SUMMARY
Bolebec Avenue, MILTON KEYNES, MK17 7AF
Introduction

View current and future planned roadworks and road closures for Bolebec Avenue, MK17 7AF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bolebec Avenue, MILTON KEYNES, MK17 7AF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bolebec Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Sep 2025
Milton Keynes Council are carrying out Highway repair and maintenance works on Secklow Gate, Central Milton Keynes, Milton Keynes.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 December 2024 at 13:11 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 27 Feb 2025 at 11:50.
Monday
Central Bedfordshire Council are proposing to carry out Highway improvement works on Bedford Road, Brogborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Central Bedfordshire Council on 20 Dec 2024 at 11:19.
3 Mar 2025 and 29 May 2026
Network Rail are proposing to carry out Works for Rail Purposes on Marston Road, Lidlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 14:51.
7 Apr and 28 Jun 2025
National Highways are proposing to carry out Works for road purposes on Marston Bypass, Marston Moreteyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 15 Jan 2025 at 09:57.
Friday
Anglian Water were proposing to carry out Utility repair and maintenance works on Berry Lane, Aspley Guise.
These works were categorised as Major.
The works were originally planned to start 8 April 2025 and run through until 6 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 28 Apr 2025 at 11:19.
30 Jun 2025
Anglian Water are carrying out Utility repair and maintenance works on Berry Lane, Aspley Guise.
The works started on 8 April 2025 at 09:00 and could run through until 30 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 May 2025 at 16:34.
22 Apr 2025 and 29 Sep 2026
Network Rail were proposing to carry out Works for Rail Purposes on Saxon Street H10 To Princes Way, Milton Keynes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 29 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Sep 2024 at 10:55.
29 Apr and 10 Jun 2025
Vattenfall Networks are proposing to carry out New service connection on Denbigh Road, Bletchley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Vattenfall Networks on 19 May 2025 at 08:39.
Sunday
Vattenfall Networks are proposing to carry out New service connection on Denbigh Road, Bletchley.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 29 April 2025 and could run through until 8 June 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Vattenfall Networks on 19 May 2025 at 08:44.
Friday
Vattenfall Networks are carrying out New service connection on Bletcham Way A5 To V10, Milton Keynes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vattenfall Networks on 10 May 2025 at 09:54.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on London Road, Newport Pagnell.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:53.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Crawley Road, Woburn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 11:30 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:02.
19 Jul 2025
National Highways are carrying out Works for road purposes on Marston Bypass, Marston Moreteyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 20:00 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 10:45.
19 May and 16 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Milton Drive, Newport Pagnell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:55.
23 May and 16 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 16 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 08:21.
23 May and 16 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:40.
23 May and 16 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 09:54.
26 May and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Newport Pagnell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:35.
26 May and 23 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Severn Drive, Newport Pagnell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 14:03.
Tomorrow
BT are proposing to carry out Utility asset works on Hunter Drive, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Mar 2025 at 10:35.
Tomorrow
BT were proposing to carry out Utility asset works on Hunter Drive, Bletchley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Apr 2025 at 13:34.
Tomorrow
BT are proposing to carry out Utility asset works on Hunter Drive, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Mar 2025 at 10:47.
Tomorrow
BT were proposing to carry out Utility asset works on Hunter Drive, Bletchley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Apr 2025 at 13:33.
Tomorrow
Anglian Water are proposing to carry out Remedial works on Denmark Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 May 2025 at 14:02.
Tomorrow
Anglian Water are proposing to carry out Remedial works on Rowlands Close, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 May 2025 at 14:01.
Tomorrow
Anglian Water are proposing to carry out Remedial works on Denmark Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 2 May 2025 at 09:05.
Friday
Milton Keynes Council are proposing to carry out Highway improvement works on George Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 28 Jan 2025 at 07:51.
Tomorrow
BT are proposing to carry out Utility asset works on Calluna Drive, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 10 Mar 2025 at 12:20.
Tomorrow
BT are carrying out Utility asset works on Calluna Drive, Bletchley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:35 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 2 Jun 2025 at 09:43.
Tomorrow
BT are proposing to carry out Utility asset works on Bushy Close, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 10 Mar 2025 at 12:18.
Tomorrow
BT are proposing to carry out Utility asset works on Bushy Close, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 26 Mar 2025 at 11:07.
2 and 10 Jun 2025
BT were proposing to carry out Utility asset works on Fulwoods Drive, Leadenhall, Milton Keynes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 1 May 2025 at 16:21.
10 Jun 2025
BT are carrying out Utility asset works on Fulwoods Drive, Leadenhall, Milton Keynes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Walbrook Avenue, Springfield, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 24 Apr 2025 at 14:02.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 May 2025 at 09:20.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 May 2025 at 14:00.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 16 May 2025 at 07:41.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Pipard, Great Linford, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 8 May 2025 at 09:09.
2 and 10 Jun 2025
BT are proposing to carry out Utility asset works on Pipard, Great Linford, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 16 May 2025 at 07:47.
2 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Milton Drive, Newport Pagnell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:14.
Today
Milton Keynes Council are carrying out Highway repair and maintenance works on Aylesbury Street, Bletchley - Fenny Stratford, Bletchley.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:57.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:10.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:47.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:13.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:48.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:05.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:45.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:09.
7 and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:48.
8 and 12 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 21 Mar 2025 at 16:37.
8 and 12 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 15 Apr 2025 at 09:10.
9 and 11 Jun 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Sheep Lane, Woburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 11:07.
9 and 11 Jun 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Sheep Lane, Woburn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 27 Mar 2025 at 11:59.
9 and 13 Jun 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Church Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 27 Jan 2025 at 13:14.
9 and 13 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Bellway, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 21 Mar 2025 at 16:40.
9 and 13 Jun 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 17 Mar 2025 at 10:34.
9 and 13 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 19 Mar 2025 at 09:34.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Severn Drive, Newport Pagnell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:50.
9 and 23 Jun 2025
Milton Keynes Council are proposing to carry out Highway repair and maintenance works on Folly Lane, North Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 12:31.
9 and 23 Jun 2025
Milton Keynes Council are proposing to carry out Highway repair and maintenance works on Folly Lane, North Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:16.
11 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Etheridge Avenue, Brinklow, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 22 May 2025 at 07:33.
11 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Etheridge Avenue, Brinklow, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 22 May 2025 at 12:55.
11 and 13 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Wavendon Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 25 Mar 2025 at 10:51.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H8 To H9, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H8 To H9, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V11 To H9, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V11 To H9, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Brinklow Roundabout, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Brinklow Roundabout, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.
15 Jun and 5 Oct 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.
16 and 18 Jun 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Husborne Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 07:47.
16 and 18 Jun 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Husborne Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 13:40.
16 and 23 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 25 Mar 2025 at 08:16.
16 and 23 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 11:25.
16 and 19 Jun 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by Vodafone on 21 Mar 2025 at 16:51.
16 and 19 Jun 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by Vodafone on 27 Mar 2025 at 11:01.
23 and 27 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Woodrush Close, Beanhill, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Apr 2025 at 11:12.
25 and 27 Jun 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Daniels Welch, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:41.
30 Jun and 18 Jul 2025
BT were proposing to carry out Utility asset works on Sheep Lane, Potsgrove.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Apr 2025 at 14:00.
30 Jun and 18 Jul 2025
BT are proposing to carry out Utility asset works on A5 From End Of Dualling South East Of Little Brickhill To J A4012, South Bedfordshire.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 2 Apr 2025 at 10:29.
30 Jun and 2 Jul 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 2 Apr 2025 at 11:36.
30 Jun and 2 Jul 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Apr 2025 at 08:59.
30 Jun and 4 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Denmark Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:15.
30 Jun and 2 Jul 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on School Lane, Husborne Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 25 Mar 2025 at 10:32.
30 Jun and 2 Jul 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on School Lane, Husborne Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 8 Apr 2025 at 14:02.
30 Jun and 4 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:52.
30 Jun and 4 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Jonathans, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:46.
30 Jun and 4 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Garraways, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:31.
30 Jun and 4 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:26.
30 Jun and 11 Jul 2025
Central Bedfordshire Council were proposing to carry out Section 58 on Bedford Road, Brogborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 09:24.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Bedford Road, Brogborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Bedford Road, Brogborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:03.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Sheep Tick End, Lidlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Sheep Tick End, Lidlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:02.
30 Jun and 11 Jul 2025
Central Bedfordshire Council were proposing to carry out Section 58 on Woburn Road, Lidlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 09:22.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Woburn Road, Lidlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.
30 Jun and 11 Jul 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Woburn Road, Lidlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:03.
1 and 3 Jul 2025
Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 31 Mar 2025 at 10:05.
1 and 3 Jul 2025
Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 11:40.
1 and 3 Jul 2025
Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 31 Mar 2025 at 11:10.
1 and 8 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 09:36.
1 Jul 2025 and 30 Jun 2026
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.
1 Jul 2025 and 30 Jun 2026
Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H6 To H7, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.
1 Jul 2025 and 30 Jun 2026
Milton Keynes Council are proposing to carry out Highway improvement works on Monkston Roundabout, Milton Keynes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Duck Lane, Woburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:51.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:11.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:06.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:48.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:07.
3 and 17 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:12.
7 and 9 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on The Hide, Netherfield, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:37.
7 and 25 Jul 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street, Cranfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 22 Apr 2025 at 13:50.
9 and 11 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Wavendon Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 May 2025 at 07:46.
14 and 18 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on George Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:19.
14 and 18 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Kemble Court, Downhead Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Apr 2025 at 13:36.
14 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Millfield Close, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:35.
14 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Springfield Way, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:34.
14 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Longborns, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:37.
14 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Mill Road, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:36.
16 and 18 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chasewater Crescent, Broughton, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 7 Apr 2025 at 10:31.
16 and 18 Jul 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chasewater Crescent, Broughton, Milton Keynes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 July 2025 and run through until 18 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 4 Apr 2025 at 10:36.
17 Jul and 1 Aug 2025
Central Bedfordshire Council were proposing to carry out Section 58 on High Street, Cranfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 26 Mar 2025 at 11:22.
17 Jul and 1 Aug 2025
Central Bedfordshire Council were proposing to carry out Section 58 on High Street, Cranfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 27 Mar 2025 at 08:52.
17 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Millfield Close, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:58.
17 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Springfield Way, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.
17 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Longborns, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.
17 Jul and 1 Aug 2025
Central Bedfordshire Council are proposing to carry out Section 58 on Mill Road, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.
21 and 23 Jul 2025
Anglian Water are proposing to carry out roadworks on Church Lane, Potsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Apr 2025 at 15:22.
21 and 25 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Church Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:23.
21 Jul and 29 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside, Aspley Guise.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 06:10.
21 and 25 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bellway, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 May 2025 at 16:30.
21 and 23 Jul 2025
Anglian Water are proposing to carry out New service connection on Newport Road, Wavendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 21 May 2025 at 16:30.
21 and 23 Jul 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 22 Apr 2025 at 15:32.
21 and 23 Jul 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 23 Apr 2025 at 07:30.
21 and 25 Jul 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the cycleway only.
This roadwork event was last updated by Vodafone on 21 Mar 2025 at 16:50.
21 and 25 Jul 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the cycleway only.
This roadwork event was last updated by Vodafone on 27 Mar 2025 at 11:01.
23 and 25 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 15:42.
23 and 25 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 23 Apr 2025 at 10:42.
25 and 28 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Jonathans, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 15 Apr 2025 at 14:47.
25 and 28 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 15:35.
25 and 28 Jul 2025
Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 23 Apr 2025 at 10:41.
28 Jul and 1 Aug 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Aylesbury Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:07.
28 Jul and 22 Nov 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 6 May 2025 at 15:04.
28 Jul and 22 Nov 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 7 May 2025 at 10:21.
28 and 30 Jul 2025
ESP Electricity are proposing to carry out Remedial works on Timbold Drive, Kents Hill Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 1 Apr 2025 at 14:37.
30 Jul and 1 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Gog Lane, Little Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 2 May 2025 at 07:33.
4 and 15 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Little Brickhill Lane, Great Brickhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 May 2025 at 10:24.
4 and 8 Aug 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Aylesbury Street, Bletchley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:18.
4 and 8 Aug 2025
BT are proposing to carry out Utility asset works on Maulden Gardens, Giffard Park, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 May 2025 at 12:14.
9 and 11 Aug 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Harrier Drive, Eaglestone, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 13:34.
9 and 11 Aug 2025
Milton Keynes Council are proposing to carry out Highway improvement works on Harrier Drive, Eaglestone, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Milton Keynes Council on 2 May 2025 at 08:46.
12 and 14 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Trunk Furlong, Aspley Guise.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 15 May 2025 at 12:45.
13 and 29 Aug 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on Horsepool Lane, Husborne Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:48.
18 Aug and 3 Sep 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street, Cranfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 3 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 08:13.
18 Aug and 3 Sep 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:56.
18 Aug and 3 Sep 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street, Cranfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 1 May 2025 at 13:54.
18 Aug and 3 Sep 2025
Central Bedfordshire Council are proposing to carry out roadworks on High Street, Cranfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 09:13.
19 and 21 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Brickhill Street H3 To H4, Milton Keynes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 20 May 2025 at 12:57.
26 and 28 Aug 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Bedford Street, Woburn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 19 May 2025 at 07:36.
Roadworks Map near to Bolebec Avenue, MILTON KEYNES, MK17 7AF (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bolebec Avenue, MILTON KEYNES, MK17 7AF (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.