ROADWORKS SUMMARY
Bolebec Avenue, MILTON KEYNES, MK17 7AF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bolebec Avenue, MK17 7AF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bolebec Avenue, MILTON KEYNES, MK17 7AF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bolebec Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Milton Keynes Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Secklow Gate

Milton Keynes Council are carrying out Highway repair and maintenance works on Secklow Gate, Central Milton Keynes, Milton Keynes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 December 2024 at 13:11 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 27 Feb 2025 at 11:50.

Central Bedfordshire Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Bedford Road, Brogborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Central Bedfordshire Council on 20 Dec 2024 at 11:19.

Network Rail logo
LONG TERM
Between
3 Mar 2025 and 29 May 2026
Details
View Map
Share
Follow
Marston Road

Network Rail are proposing to carry out Works for Rail Purposes on Marston Road, Lidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 29 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 14:51.

National Highways logo
LONG TERM
Between
7 Apr and 28 Jun 2025
Details
View Map
Share
Follow
Marston Bypass

National Highways are proposing to carry out Works for road purposes on Marston Bypass, Marston Moreteyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 15 Jan 2025 at 09:57.

Anglian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Berry Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Berry Lane, Aspley Guise.

These works were categorised as Major.

The works were originally planned to start 8 April 2025 and run through until 6 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 28 Apr 2025 at 11:19.

Anglian Water logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Berry Lane

Anglian Water are carrying out Utility repair and maintenance works on Berry Lane, Aspley Guise.

The works started on 8 April 2025 at 09:00 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 May 2025 at 16:34.

Network Rail logo
LONG TERM
Between
22 Apr 2025 and 29 Sep 2026
Details
View Map
Share
Saxon Street H10 To Princes Way

Network Rail were proposing to carry out Works for Rail Purposes on Saxon Street H10 To Princes Way, Milton Keynes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 29 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 10:55.

Vattenfall Networks logo
LONG TERM
Between
29 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Denbigh Road

Vattenfall Networks are proposing to carry out New service connection on Denbigh Road, Bletchley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Vattenfall Networks on 19 May 2025 at 08:39.

Vattenfall Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Denbigh Road

Vattenfall Networks are proposing to carry out New service connection on Denbigh Road, Bletchley.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 April 2025 and could run through until 8 June 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Vattenfall Networks on 19 May 2025 at 08:44.

Vattenfall Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bletcham Way A5 To V10

Vattenfall Networks are carrying out New service connection on Bletcham Way A5 To V10, Milton Keynes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 10 May 2025 at 09:54.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Newport Pagnell.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:53.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Crawley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Crawley Road, Woburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 11:30 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:02.

National Highways logo
LONG TERM
Until
19 Jul 2025
Details
View Map
Share
Follow
Marston Bypass

National Highways are carrying out Works for road purposes on Marston Bypass, Marston Moreteyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 20:00 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 10:45.

Cadent Gas logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Milton Drive

Cadent Gas were proposing to carry out Utility asset works on Milton Drive, Newport Pagnell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:55.

Southern Gas Networks logo
Between
23 May and 16 Jun 2025
Details
View Map
Share
Crawley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 16 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 08:21.

Southern Gas Networks logo
Between
23 May and 16 Jun 2025
Details
View Map
Share
Follow
Crawley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:40.

Southern Gas Networks logo
Between
23 May and 16 Jun 2025
Details
View Map
Share
Follow
Crawley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Road, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 09:54.

Cadent Gas logo
Between
26 May and 18 Jun 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Newport Pagnell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:35.

Cadent Gas logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Severn Drive

Cadent Gas were proposing to carry out Utility asset works on Severn Drive, Newport Pagnell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 14:03.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hunter Drive

BT are proposing to carry out Utility asset works on Hunter Drive, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Mar 2025 at 10:35.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Hunter Drive

BT were proposing to carry out Utility asset works on Hunter Drive, Bletchley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Apr 2025 at 13:34.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hunter Drive

BT are proposing to carry out Utility asset works on Hunter Drive, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Mar 2025 at 10:47.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Hunter Drive

BT were proposing to carry out Utility asset works on Hunter Drive, Bletchley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Apr 2025 at 13:33.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Denmark Street

Anglian Water are proposing to carry out Remedial works on Denmark Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 May 2025 at 14:02.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rowlands Close

Anglian Water are proposing to carry out Remedial works on Rowlands Close, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 May 2025 at 14:01.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Denmark Street

Anglian Water are proposing to carry out Remedial works on Denmark Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 May 2025 at 09:05.

Milton Keynes Council logo
Finishing
Friday
Details
View Map
Share
Follow
George Street

Milton Keynes Council are proposing to carry out Highway improvement works on George Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 28 Jan 2025 at 07:51.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Calluna Drive

BT are proposing to carry out Utility asset works on Calluna Drive, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 10 Mar 2025 at 12:20.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Calluna Drive

BT are carrying out Utility asset works on Calluna Drive, Bletchley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:35 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:43.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bushy Close

BT are proposing to carry out Utility asset works on Bushy Close, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 10 Mar 2025 at 12:18.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bushy Close

BT are proposing to carry out Utility asset works on Bushy Close, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 26 Mar 2025 at 11:07.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Fulwoods Drive

BT were proposing to carry out Utility asset works on Fulwoods Drive, Leadenhall, Milton Keynes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 May 2025 at 16:21.

BT logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Fulwoods Drive

BT are carrying out Utility asset works on Fulwoods Drive, Leadenhall, Milton Keynes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Walbrook Avenue

BT are proposing to carry out Utility asset works on Walbrook Avenue, Springfield, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 14:02.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Longcross

BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 May 2025 at 09:20.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Longcross

BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 May 2025 at 14:00.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Longcross

BT are proposing to carry out Utility asset works on Longcross, Pennyland, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 May 2025 at 07:41.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Pipard

BT are proposing to carry out Utility asset works on Pipard, Great Linford, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 8 May 2025 at 09:09.

BT logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Pipard

BT are proposing to carry out Utility asset works on Pipard, Great Linford, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 16 May 2025 at 07:47.

Cadent Gas logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Milton Drive

Cadent Gas are proposing to carry out Utility asset works on Milton Drive, Newport Pagnell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:14.

Milton Keynes Council logo
Finishing
Today
Details
View Map
Share
Follow
Aylesbury Street

Milton Keynes Council are carrying out Highway repair and maintenance works on Aylesbury Street, Bletchley - Fenny Stratford, Bletchley.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:57.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
George Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:10.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
George Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:47.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
Leighton Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:13.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
Leighton Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:48.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
Park Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:05.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
Park Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:45.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:09.

Southern Gas Networks logo
Between
7 and 27 Jun 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:48.

T-Mobile (UK) logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Newport Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Mar 2025 at 16:37.

T-Mobile (UK) logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Newport Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 15 Apr 2025 at 09:10.

Central Bedfordshire Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Sheep Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Sheep Lane, Woburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 11:07.

Central Bedfordshire Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Sheep Lane

Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Sheep Lane, Woburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 27 Mar 2025 at 11:59.

Milton Keynes Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Street

Milton Keynes Council are proposing to carry out Highway improvement works on Church Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 27 Jan 2025 at 13:14.

T-Mobile (UK) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Bellway

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Bellway, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 21 Mar 2025 at 16:40.

T-Mobile (UK) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Newport Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 17 Mar 2025 at 10:34.

T-Mobile (UK) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Newport Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 19 Mar 2025 at 09:34.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Severn Drive

Cadent Gas are proposing to carry out Utility asset works on Severn Drive, Newport Pagnell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:50.

Milton Keynes Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Folly Lane

Milton Keynes Council are proposing to carry out Highway repair and maintenance works on Folly Lane, North Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 12:31.

Milton Keynes Council logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Folly Lane

Milton Keynes Council are proposing to carry out Highway repair and maintenance works on Folly Lane, North Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:16.

Milton Keynes Council logo
LONG TERM
Between
11 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Etheridge Avenue

Milton Keynes Council are proposing to carry out Highway improvement works on Etheridge Avenue, Brinklow, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 22 May 2025 at 07:33.

Milton Keynes Council logo
LONG TERM
Between
11 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Etheridge Avenue

Milton Keynes Council are proposing to carry out Highway improvement works on Etheridge Avenue, Brinklow, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 22 May 2025 at 12:55.

Anglian Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Wavendon Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Wavendon Road, Salford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 25 Mar 2025 at 10:51.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Standing Way V10 To V11

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Standing Way V10 To V11

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V10 To V11, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tongwell Street H8 To H9

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H8 To H9, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tongwell Street H8 To H9

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H8 To H9, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Standing Way V11 To H9

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V11 To H9, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Standing Way V11 To H9

Milton Keynes Council are proposing to carry out Highway improvement works on Standing Way V11 To H9, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Brinklow Roundabout

Milton Keynes Council are proposing to carry out Highway improvement works on Brinklow Roundabout, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Brinklow Roundabout

Milton Keynes Council are proposing to carry out Highway improvement works on Brinklow Roundabout, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:17.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tongwell Street H7 To H8

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:19.

Milton Keynes Council logo
LONG TERM
Between
15 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tongwell Street H7 To H8

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 21 May 2025 at 11:18.

Central Bedfordshire Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Husborne Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 07:47.

Central Bedfordshire Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Husborne Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 13:40.

Anglian Water logo
Between
16 and 23 Jun 2025
Details
View Map
Share
Cranfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Mar 2025 at 08:16.

Anglian Water logo
Between
16 and 23 Jun 2025
Details
View Map
Share
Cranfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 11:25.

Vodafone logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Redway Md02 Middleton

Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by Vodafone on 21 Mar 2025 at 16:51.

Vodafone logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Redway Md02 Middleton

Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by Vodafone on 27 Mar 2025 at 11:01.

Western Power Distribution (East Midlands) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Woodrush Close

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Woodrush Close, Beanhill, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Apr 2025 at 11:12.

Milton Keynes Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Daniels Welch

Milton Keynes Council are proposing to carry out Highway improvement works on Daniels Welch, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:41.

BT logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Sheep Lane

BT were proposing to carry out Utility asset works on Sheep Lane, Potsgrove.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Apr 2025 at 14:00.

BT logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
A5 From End Of Dualling South East Of Little Brickhill To J A4012

BT are proposing to carry out Utility asset works on A5 From End Of Dualling South East Of Little Brickhill To J A4012, South Bedfordshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Apr 2025 at 10:29.

Central Bedfordshire Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
C100 From Froxfield To Tyrells End

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 2 Apr 2025 at 11:36.

Central Bedfordshire Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
C100 From Froxfield To Tyrells End

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Apr 2025 at 08:59.

Milton Keynes Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Denmark Street

Milton Keynes Council are proposing to carry out Highway improvement works on Denmark Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:15.

Central Bedfordshire Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
School Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on School Lane, Husborne Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 25 Mar 2025 at 10:32.

Central Bedfordshire Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
School Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on School Lane, Husborne Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 8 Apr 2025 at 14:02.

Milton Keynes Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rochfords

Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:52.

Milton Keynes Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Jonathans

Milton Keynes Council are proposing to carry out Highway improvement works on Jonathans, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 2 Jun 2025 at 15:46.

Milton Keynes Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Garraways

Milton Keynes Council are proposing to carry out Highway improvement works on Garraways, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:31.

Milton Keynes Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
St Dunstans

Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:26.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Bedford Road

Central Bedfordshire Council were proposing to carry out Section 58 on Bedford Road, Brogborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 09:24.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Section 58 on Bedford Road, Brogborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Section 58 on Bedford Road, Brogborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:03.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Sheep Tick End

Central Bedfordshire Council are proposing to carry out Section 58 on Sheep Tick End, Lidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Sheep Tick End

Central Bedfordshire Council are proposing to carry out Section 58 on Sheep Tick End, Lidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:02.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Woburn Road

Central Bedfordshire Council were proposing to carry out Section 58 on Woburn Road, Lidlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 20 Mar 2025 at 09:22.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Woburn Road

Central Bedfordshire Council are proposing to carry out Section 58 on Woburn Road, Lidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 07:17.

Central Bedfordshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Woburn Road

Central Bedfordshire Council are proposing to carry out Section 58 on Woburn Road, Lidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Mar 2025 at 13:03.

Anglian Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Simpson Road

Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Mar 2025 at 10:05.

Anglian Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Simpson Road

Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 11:40.

Anglian Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Simpson Road

Anglian Water are proposing to carry out Remedial works on Simpson Road, Walton Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 31 Mar 2025 at 11:10.

Anglian Water logo
Between
1 and 8 Jul 2025
Details
View Map
Share
Follow
Cranfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Cranfield Road, Aspley Guise.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Mar 2025 at 09:36.

Milton Keynes Council logo
LONG TERM
Between
1 Jul 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Tongwell Street H7 To H8

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H7 To H8, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.

Milton Keynes Council logo
LONG TERM
Between
1 Jul 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Tongwell Street H6 To H7

Milton Keynes Council are proposing to carry out Highway improvement works on Tongwell Street H6 To H7, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.

Milton Keynes Council logo
LONG TERM
Between
1 Jul 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Monkston Roundabout

Milton Keynes Council are proposing to carry out Highway improvement works on Monkston Roundabout, Milton Keynes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 14 Oct 2024 at 09:20.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Duck Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Duck Lane, Woburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:51.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
George Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on George Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:11.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Leighton Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:06.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Leighton Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leighton Street, Woburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:48.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Park Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:07.

Southern Gas Networks logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Woburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 10:12.

Milton Keynes Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
The Hide

Milton Keynes Council are proposing to carry out Highway improvement works on The Hide, Netherfield, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 3 Jun 2025 at 08:37.

Central Bedfordshire Council logo
Between
7 and 25 Jul 2025
Details
View Map
Share
High Street

Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street, Cranfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 22 Apr 2025 at 13:50.

Anglian Water logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Wavendon Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Wavendon Road, Salford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 May 2025 at 07:46.

Milton Keynes Council logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
George Street

Milton Keynes Council are proposing to carry out Highway improvement works on George Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:19.

Western Power Distribution (East Midlands) logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Kemble Court

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Kemble Court, Downhead Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Apr 2025 at 13:36.

Central Bedfordshire Council logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Millfield Close

Central Bedfordshire Council are proposing to carry out Section 58 on Millfield Close, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:35.

Central Bedfordshire Council logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Springfield Way

Central Bedfordshire Council are proposing to carry out Section 58 on Springfield Way, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:34.

Central Bedfordshire Council logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Longborns

Central Bedfordshire Council are proposing to carry out Section 58 on Longborns, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:37.

Central Bedfordshire Council logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mill Road

Central Bedfordshire Council are proposing to carry out Section 58 on Mill Road, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 07:36.

Anglian Water logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Chasewater Crescent

Anglian Water are proposing to carry out Utility repair and maintenance works on Chasewater Crescent, Broughton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Apr 2025 at 10:31.

Anglian Water logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Chasewater Crescent

Anglian Water were proposing to carry out Utility repair and maintenance works on Chasewater Crescent, Broughton, Milton Keynes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 July 2025 and run through until 18 July 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 4 Apr 2025 at 10:36.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
High Street

Central Bedfordshire Council were proposing to carry out Section 58 on High Street, Cranfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 26 Mar 2025 at 11:22.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
High Street

Central Bedfordshire Council were proposing to carry out Section 58 on High Street, Cranfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 27 Mar 2025 at 08:52.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Millfield Close

Central Bedfordshire Council are proposing to carry out Section 58 on Millfield Close, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:58.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Springfield Way

Central Bedfordshire Council are proposing to carry out Section 58 on Springfield Way, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Longborns

Central Bedfordshire Council are proposing to carry out Section 58 on Longborns, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.

Central Bedfordshire Council logo
Between
17 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mill Road

Central Bedfordshire Council are proposing to carry out Section 58 on Mill Road, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 06:57.

Anglian Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Church Lane

Anglian Water are proposing to carry out roadworks on Church Lane, Potsgrove.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Apr 2025 at 15:22.

Milton Keynes Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Church Street

Milton Keynes Council are proposing to carry out Highway improvement works on Church Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:23.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Woodside

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside, Aspley Guise.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 06:10.

Western Power Distribution (East Midlands) logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Bellway

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bellway, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 May 2025 at 16:30.

Anglian Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Newport Road

Anglian Water are proposing to carry out New service connection on Newport Road, Wavendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 21 May 2025 at 16:30.

Anglian Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Newport Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 22 Apr 2025 at 15:32.

Anglian Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Newport Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Newport Road, Wavendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Apr 2025 at 07:30.

Vodafone logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Redway Md02 Middleton

Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the cycleway only.

This roadwork event was last updated by Vodafone on 21 Mar 2025 at 16:50.

Vodafone logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Redway Md02 Middleton

Vodafone are proposing to carry out Utility repair and maintenance works on Redway Md02 Middleton, Middleton, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the cycleway only.

This roadwork event was last updated by Vodafone on 27 Mar 2025 at 11:01.

Milton Keynes Council logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Rochfords

Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 15:42.

Milton Keynes Council logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Rochfords

Milton Keynes Council are proposing to carry out Highway improvement works on Rochfords, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 23 Apr 2025 at 10:42.

Milton Keynes Council logo
Between
25 and 28 Jul 2025
Details
View Map
Share
Follow
Jonathans

Milton Keynes Council are proposing to carry out Highway improvement works on Jonathans, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 15 Apr 2025 at 14:47.

Milton Keynes Council logo
Between
25 and 28 Jul 2025
Details
View Map
Share
Follow
St Dunstans

Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 15:35.

Milton Keynes Council logo
Between
25 and 28 Jul 2025
Details
View Map
Share
Follow
St Dunstans

Milton Keynes Council are proposing to carry out Highway improvement works on St Dunstans, Coffee Hall, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 23 Apr 2025 at 10:41.

Milton Keynes Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Aylesbury Street

Milton Keynes Council are proposing to carry out Highway improvement works on Aylesbury Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:07.

Milton Keynes Council logo
LONG TERM
Between
28 Jul and 22 Nov 2025
Details
View Map
Share
Follow
Groveway V8 To V10

Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 6 May 2025 at 15:04.

Milton Keynes Council logo
LONG TERM
Between
28 Jul and 22 Nov 2025
Details
View Map
Share
Follow
Groveway V8 To V10

Milton Keynes Council are proposing to carry out Highway improvement works on Groveway V8 To V10, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 7 May 2025 at 10:21.

ESP Electricity logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Timbold Drive

ESP Electricity are proposing to carry out Remedial works on Timbold Drive, Kents Hill Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Apr 2025 at 14:37.

Anglian Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Gog Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Gog Lane, Little Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 2 May 2025 at 07:33.

Western Power Distribution (East Midlands) logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Little Brickhill Lane

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Little Brickhill Lane, Great Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 May 2025 at 10:24.

Milton Keynes Council logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Aylesbury Street

Milton Keynes Council are proposing to carry out Highway improvement works on Aylesbury Street, Bletchley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 29 Apr 2025 at 12:18.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Maulden Gardens

BT are proposing to carry out Utility asset works on Maulden Gardens, Giffard Park, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 May 2025 at 12:14.

Milton Keynes Council logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Harrier Drive

Milton Keynes Council are proposing to carry out Highway improvement works on Harrier Drive, Eaglestone, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 22 Apr 2025 at 13:34.

Milton Keynes Council logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Harrier Drive

Milton Keynes Council are proposing to carry out Highway improvement works on Harrier Drive, Eaglestone, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Milton Keynes Council on 2 May 2025 at 08:46.

Anglian Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Trunk Furlong

Anglian Water are proposing to carry out Utility repair and maintenance works on Trunk Furlong, Aspley Guise.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 May 2025 at 12:45.

Central Bedfordshire Council logo
Between
13 and 29 Aug 2025
Details
View Map
Share
Follow
Horsepool Lane

Central Bedfordshire Council are proposing to carry out Highway improvement works on Horsepool Lane, Husborne Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:48.

Central Bedfordshire Council logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
High Street

Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street, Cranfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 3 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 08:13.

Central Bedfordshire Council logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
Follow
High Street

Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:56.

Central Bedfordshire Council logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
Follow
High Street

Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street, Cranfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 1 May 2025 at 13:54.

Central Bedfordshire Council logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
Follow
High Street

Central Bedfordshire Council are proposing to carry out roadworks on High Street, Cranfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 09:13.

Anglian Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Brickhill Street H3 To H4

Anglian Water are proposing to carry out Utility repair and maintenance works on Brickhill Street H3 To H4, Milton Keynes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 May 2025 at 12:57.

Central Bedfordshire Council logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Bedford Street

Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Bedford Street, Woburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 May 2025 at 07:36.


Roadworks Map near to Bolebec Avenue, MILTON KEYNES, MK17 7AF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bolebec Avenue, MILTON KEYNES, MK17 7AF (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Central Bedfordshire Council logo
BROUGHTON ROAD 
(0.8 miles)
Central Bedfordshire Council
Highway repair and maintenance works - Carriageway - Two-way signals
Complete
30 May 2025 09:38 - 11:31
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.