ROADWORKS SUMMARY
The Street, SITTINGBOURNE, ME9 7UH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Street, ME9 7UH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Street, SITTINGBOURNE, ME9 7UH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Between
2 Jan 2023 and 30 Apr 2025
Details
View Map
Share
New Cut Road

Kent County Council were proposing to carry out Highway improvement works on New Cut Road, Maidstone.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2023 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:07.

Kent County Council logo
LONG TERM
Between
2 Jan 2023 and 30 Apr 2025
Details
View Map
Share
Newnham Court Way

Kent County Council were proposing to carry out Highway improvement works on Newnham Court Way, Weavering.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2023 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:07.

Kent County Council logo
LONG TERM
Between
2 Jan 2023 and 30 Apr 2025
Details
View Map
Share
A249 Newnham Court Roundabout Entry Southbound To A249 M20 Interchange Roundabout Exit Southbound

Kent County Council were proposing to carry out Highway improvement works on A249 Newnham Court Roundabout Entry Southbound To A249 M20 Interchange Roundabout Exit Southbound, Boxley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2023 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:07.

Kent County Council logo
LONG TERM
Between
2 Jan 2023 and 30 Apr 2025
Details
View Map
Share
Bearsted Road

Kent County Council were proposing to carry out Highway improvement works on Bearsted Road, Maidstone.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2023 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:12.

Kent County Council logo
LONG TERM
Between
2 Jan 2023 and 30 Apr 2025
Details
View Map
Share
Newnham Court Roundabout To M20 Junction 7 Roundabout

Kent County Council were proposing to carry out Highway improvement works on Newnham Court Roundabout To M20 Junction 7 Roundabout, Boxley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2023 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:07.

Kent County Council logo
LONG TERM
Between
2 Jan 2024 and 30 Apr 2025
Details
View Map
Share
Bearsted Road

Kent County Council were proposing to carry out Highway improvement works on Bearsted Road, Weavering.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Staplehurst Road, Sittingbourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:30 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 09:16.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Weavering Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weavering Street, Weavering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 11:45.

Southern Gas Networks logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Weavering Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Weavering Street, Weavering.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 08:00 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 09:39.

National Highways logo
LONG TERM
Between
15 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bobbing Hill

National Highways are proposing to carry out Highway improvement works on Bobbing Hill, Bobbing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 6 Nov 2024 at 17:09.

Kent County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Jan 2026
Details
View Map
Share
Follow
Key Street Roundabout

Kent County Council are proposing to carry out Highway improvement works on Key Street Roundabout, Bobbing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 14 Mar 2025 at 14:28.

Kent County Council logo
LONG TERM
Between
27 Jan and 8 Apr 2025
Details
View Map
Share
Follow
Sheppey Way

Kent County Council are proposing to carry out Highway improvement works on Sheppey Way, Bobbing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 13 Dec 2024 at 17:23.

Kent County Council logo
LONG TERM
Until
8 Apr 2025
Details
View Map
Share
Follow
Sheppey Way

Kent County Council are carrying out Highway improvement works on Sheppey Way, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:30 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 12:08.

Kent County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 9 Dec 2024 at 15:15.

Kent County Council logo
LONG TERM
Between
3 Feb and 13 Apr 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 3 Dec 2024 at 14:01.

Electricity Network Company logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
North Dane Way

Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 12:34.

Electricity Network Company logo
LONG TERM
Between
3 Feb and 9 May 2025
Details
View Map
Share
Follow
North Dane Way

Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 12:05.

Electricity Network Company logo
LONG TERM
Between
3 Feb and 9 May 2025
Details
View Map
Share
Follow
North Dane Way

Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 13:40.

National Highways logo
LONG TERM
Between
20 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Key Street Roundabout

National Highways are proposing to carry out Highway improvement works on Key Street Roundabout, Bobbing.

These works are categorised as Major.

The works will start on or after 20 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Highways on 6 Nov 2024 at 17:09.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Key Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Key Street, Sittingbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 15:40.

Kent County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Bobbing Hill

Kent County Council are proposing to carry out Highway improvement works on Bobbing Hill, Bobbing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 14 Mar 2025 at 14:27.

Kent County Council logo
Until
31 Mar 2025
Details
View Map
Share
Follow
Lidsing Road

Kent County Council are carrying out Highway improvement works on Lidsing Road, Lidsing, Boxley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Mar 2025 at 09:08.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Canterbury Road

Southern Water were proposing to carry out Utility repair and maintenance works on Canterbury Road, Sittingbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 17 Dec 2024 at 12:59.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Road

Southern Water are proposing to carry out Utility repair and maintenance works on Canterbury Road, Sittingbourne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Jan 2025 at 15:06.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Road

Southern Water are carrying out Utility repair and maintenance works on Canterbury Road, Sittingbourne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2025 at 22:36 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Mar 2025 at 08:38.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
East Street

Southern Water are proposing to carry out Utility repair and maintenance works on East Street, Sittingbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Jan 2025 at 12:31.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
East Street

Southern Water are carrying out Utility repair and maintenance works on East Street, Sittingbourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 March 2025 at 22:36 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Mar 2025 at 08:38.

Southern Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Shawstead Road

Southern Water are proposing to carry out New service connection on Shawstead Road, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 27 Jan 2025 at 10:25.

Southern Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Shawstead Road

Southern Water are proposing to carry out New service connection on Shawstead Road, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 19 Feb 2025 at 09:53.

Southern Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Borden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Borden Lane, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Jan 2025 at 13:56.

Southern Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Borden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Borden Lane, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Jan 2025 at 17:33.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Spekes Road

Southern Water are proposing to carry out Utility repair and maintenance works on Spekes Road, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Dec 2024 at 11:59.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Spekes Road

Southern Water are proposing to carry out Utility repair and maintenance works on Spekes Road, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 25 Feb 2025 at 16:30.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Century Road

Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Dec 2024 at 10:45.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Century Road

Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Water on 9 Dec 2024 at 12:24.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Century Road

Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Water on 10 Dec 2024 at 11:04.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Century Road

Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Water on 7 Jan 2025 at 09:26.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Century Road

Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Water on 4 Feb 2025 at 10:32.

Medway Council logo
Between
23 and 30 Mar 2025
Details
View Map
Share
Follow
Seymour Road

Medway Council are proposing to carry out Highway improvement works on Seymour Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 10 Feb 2025 at 15:52.

Kent County Council logo
Until
25 Mar 2025
Details
View Map
Share
Follow
Trapfield Lane

Kent County Council are carrying out Highway improvement works on Trapfield Lane, Bearsted.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 07:00 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Feb 2025 at 09:56.

South East Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
The Street

South East Water are proposing to carry out New service connection on The Street, Wormshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 24 Dec 2024 at 10:38.

Medway Council logo
On
24 Mar 2025
Details
View Map
Share
Follow
Edwin Road

Medway Council are proposing to carry out Utility asset works on Edwin Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 24 March 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 12 Mar 2025 at 09:40.

Medway Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Ito Way

Medway Council are proposing to carry out Utility asset works on Ito Way, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 20 Feb 2025 at 14:41.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Matts Hill Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Matts Hill Road, Detling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Dec 2024 at 17:56.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Matts Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Matts Hill Road, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Dec 2024 at 11:51.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Matts Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:08.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Matts Hill Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Matts Hill Road, Rainham, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 16:15.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Matts Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Dec 2024 at 09:53.

Cityfibre Metro Networks logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Matts Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Mar 2025 at 10:19.

Medway Council logo
LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Hempstead Valley Drive

Medway Council were proposing to carry out Utility asset works on Hempstead Valley Drive, Hempstead, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Medway Council on 26 Feb 2025 at 08:54.

National Highways logo
LONG TERM
Between
1 Apr and 25 May 2025
Details
View Map
Share
Follow
Keycol Hill

National Highways are proposing to carry out Highway improvement works on Keycol Hill, Bobbing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 25 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Highways on 6 Nov 2024 at 17:11.

Medway Council logo
LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Hempstead Road

Medway Council are proposing to carry out Utility asset works on Hempstead Road, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 4 Jul 2024 at 11:57.

Medway Council logo
LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Watling Street

Medway Council are proposing to carry out Utility asset works on Watling Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 4 Jul 2024 at 11:57.

Medway Council logo
LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Woodlands Road

Medway Council are proposing to carry out Utility asset works on Woodlands Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 9 Jul 2024 at 09:29.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Derby Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Derby Road, Darland, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Derby Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Derby Road, Darland, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:18.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Derby Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Derby Road, Darland, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 09:07.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Watling Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Watling Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Watling Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Watling Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:18.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Watling Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Watling Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 09:07.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Watling Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Watling Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 12:49.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 16:20.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:29.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 10:08.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 10:12.

Southern Gas Networks logo
Between
5 and 21 Apr 2025
Details
View Map
Share
Follow
First Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:26.

UK Power Networks South Eastern logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Cryalls Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Cryalls Lane, Sittingbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 12:22.

Cityfibre Metro Networks logo
Between
7 and 19 Apr 2025
Details
View Map
Share
Follow
South Bush Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Bush Lane, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Jan 2025 at 15:19.

Cityfibre Metro Networks logo
Between
7 and 19 Apr 2025
Details
View Map
Share
Follow
South Bush Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Bush Lane, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jan 2025 at 16:08.

Medway Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Seymour Road

Medway Council are proposing to carry out Highway improvement works on Seymour Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Medway Council on 10 Feb 2025 at 11:43.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Station Road

Southern Water were proposing to carry out New service connection on Station Road, Rainham, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 24 Feb 2025 at 14:20.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Lower Twydall Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Lower Twydall Lane, Twydall, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Jan 2025 at 11:03.

Southern Gas Networks logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Second Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Second Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:26.

Between
16 and 21 Apr 2025
Details
View Map
Share
Follow
Vellum Drive

WHP Telecoms Ltd are proposing to carry out Utility asset works on Vellum Drive, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by WHP Telecoms Ltd on 5 Mar 2025 at 17:09.

Cityfibre Metro Networks logo
Between
22 Apr and 3 May 2025
Details
View Map
Share
Follow
Kemsley Street Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Kemsley Street Road, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Dec 2024 at 11:15.

Cityfibre Metro Networks logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Spade Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Spade Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 08:14.

Southern Water logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Henry Street

Southern Water are proposing to carry out Utility repair and maintenance works on Henry Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 24 Jan 2025 at 09:18.

Southern Water logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Henry Street

Southern Water are proposing to carry out Utility repair and maintenance works on Henry Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 25 Feb 2025 at 16:41.

Cityfibre Metro Networks logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Seymour Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Seymour Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 09:20.

Cityfibre Metro Networks logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Lidsing Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lidsing Road, Lidsing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 11:43.

UK Power Networks South Eastern logo
Between
28 Apr and 21 May 2025
Details
View Map
Share
Follow
Crown Quay Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Crown Quay Lane, Sittingbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Feb 2025 at 10:18.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
William Street

Southern Water are proposing to carry out Utility repair and maintenance works on William Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Feb 2025 at 08:29.

South East Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Follow
Church Lane

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane, Bicknor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 31 Jan 2025 at 10:45.

South East Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Follow
Church Lane

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane, Bicknor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 26 Feb 2025 at 07:46.

Kent County Council logo
LONG TERM
Between
1 May 2025 and 1 Jun 2026
Details
View Map
Share
Follow
New Cut Road

Kent County Council are proposing to carry out Highway improvement works on New Cut Road, Maidstone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 13:43.

Kent County Council logo
LONG TERM
Between
1 May 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Bearsted Road

Kent County Council are proposing to carry out Highway improvement works on Bearsted Road, Weavering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 13:42.

Kent County Council logo
LONG TERM
Between
1 May 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Newnham Court Roundabout To M20 Junction 7 Roundabout

Kent County Council are proposing to carry out Highway improvement works on Newnham Court Roundabout To M20 Junction 7 Roundabout, Boxley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 13:43.

Kent County Council logo
LONG TERM
Between
1 May 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Bearsted Road

Kent County Council are proposing to carry out Highway improvement works on Bearsted Road, Maidstone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 13:42.

Kent County Council logo
LONG TERM
Between
1 May 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Newnham Court Roundabout To M20 Junction 7 Roundabout

Kent County Council are proposing to carry out Highway improvement works on Newnham Court Roundabout To M20 Junction 7 Roundabout, Boxley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 Jan 2025 at 13:43.

Cityfibre Metro Networks logo
Between
2 and 8 May 2025
Details
View Map
Share
Follow
Forge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Forge Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Jan 2025 at 06:48.

Cityfibre Metro Networks logo
Between
2 and 8 May 2025
Details
View Map
Share
Follow
Chapel Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Chapel Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Jan 2025 at 13:16.

Cityfibre Metro Networks logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
White Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on White Hill Road, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Dec 2024 at 09:48.

Southern Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Frederick Street

Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Feb 2025 at 15:14.

Southern Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Frederick Street

Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Mar 2025 at 10:49.

Southern Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Old House Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Old House Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Feb 2025 at 15:59.

Medway Council logo
Between
7 and 10 May 2025
Details
View Map
Share
Follow
Hempstead Valley Drive

Medway Council are proposing to carry out Utility asset works on Hempstead Valley Drive, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 26 Feb 2025 at 10:08.

Cityfibre Metro Networks logo
Between
8 and 10 May 2025
Details
View Map
Share
Follow
Dunn Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Dunn Street, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 08:30.

Cityfibre Metro Networks logo
Between
9 and 12 May 2025
Details
View Map
Share
Follow
Dunn Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Dunn Street, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 06:56.

Cityfibre Metro Networks logo
Between
9 and 14 May 2025
Details
View Map
Share
Follow
Blind Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Blind Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Jan 2025 at 06:37.

UK Power Networks South Eastern logo
Between
12 and 25 May 2025
Details
View Map
Share
Follow
Pilgrims Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pilgrims Way, Hollingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 25 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Feb 2025 at 14:04.

UK Power Networks South Eastern logo
Between
12 and 25 May 2025
Details
View Map
Share
Follow
Pilgrims Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pilgrims Way, Hollingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 25 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Feb 2025 at 07:39.

UK Power Networks South Eastern logo
Between
12 and 25 May 2025
Details
View Map
Share
Follow
Pilgrims Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pilgrims Way, Hollingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 25 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Mar 2025 at 07:28.

Kent County Council logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Hampton Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Hampton Road, Maidstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Feb 2025 at 13:57.

UK Power Networks South Eastern logo
Between
12 and 19 May 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Feb 2025 at 12:02.

Kent County Council logo
Between
15 and 17 May 2025
Details
View Map
Share
Follow
Boxley Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Boxley Road, Walderslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Feb 2025 at 14:00.

Kent County Council logo
Between
15 and 17 May 2025
Details
View Map
Share
Follow
Beechen Bank Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Beechen Bank Road, Walderslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Feb 2025 at 14:00.

Cityfibre Metro Networks logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Stockers Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Stockers Hill, Rodmersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:15.

Southern Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Crossways

Southern Water are proposing to carry out Utility repair and maintenance works on Crossways, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 24 Feb 2025 at 16:10.

Southern Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Bull Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Bull Lane, Newington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Jan 2025 at 10:49.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Bull Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bull Lane, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 Feb 2025 at 16:01.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Orchard Street

Southern Water are proposing to carry out Utility repair and maintenance works on Orchard Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 25 Feb 2025 at 13:51.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Orchard Street

Southern Water are proposing to carry out Utility repair and maintenance works on Orchard Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Feb 2025 at 09:08.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Orchard Street

Southern Water are proposing to carry out Utility repair and maintenance works on Orchard Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Mar 2025 at 14:20.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Orchard Street

Southern Water are proposing to carry out Utility repair and maintenance works on Orchard Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 Mar 2025 at 12:09.

Cityfibre Metro Networks logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Scragged Oak Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Scragged Oak Road, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Dec 2024 at 10:24.

National Highways logo
LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Follow
A249 J A2 Leave N

National Highways are proposing to carry out Highway improvement works on A249 J A2 Leave N, Swale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by National Highways on 4 Dec 2024 at 16:30.

Southern Water logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Station Road

Southern Water are proposing to carry out New service connection on Station Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 25 Feb 2025 at 09:34.

Cityfibre Metro Networks logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Bottles Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bottles Lane, Rodmersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:25.

UK Power Networks South Eastern logo
LONG TERM
Between
27 May and 27 Jun 2025
Details
View Map
Share
Follow
Godwin Close

UK Power Networks South Eastern are proposing to carry out New service connection on Godwin Close, Sittingbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Feb 2025 at 13:39.

UK Power Networks South Eastern logo
LONG TERM
Between
27 May and 27 Jun 2025
Details
View Map
Share
Follow
Danes Mead

UK Power Networks South Eastern are proposing to carry out New service connection on Danes Mead, Sittingbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Feb 2025 at 13:42.

Southern Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Woodstock Road

Southern Water are proposing to carry out Utility repair and maintenance works on Woodstock Road, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 5 Mar 2025 at 13:55.

UK Power Networks South Eastern logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Feb 2025 at 12:28.

UK Power Networks South Eastern logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Feb 2025 at 19:18.

Cityfibre Metro Networks logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green Lane, Rodmersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:31.

Southern Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Horsham Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Horsham Lane, Upchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Mar 2025 at 15:38.

Cityfibre Metro Networks logo
Between
5 and 7 Jun 2025
Details
View Map
Share
Follow
Rodmersham Green

Cityfibre Metro Networks are proposing to carry out Utility asset works on Rodmersham Green, Rodmersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:42.

Cityfibre Metro Networks logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Highsted Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Highsted Road, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:59.

Cityfibre Metro Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Tunstall Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Tunstall Road, Tunstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 10:37.

Kent County Council logo
Until
15 Jun 2025
Details
View Map
Share
Follow
Basser Hill

Kent County Council are carrying out Highway improvement works on Basser Hill, Lower Halstow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 00:00 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Mar 2025 at 09:14.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Iwade Road

Southern Water are proposing to carry out Utility repair and maintenance works on Iwade Road, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 14 Mar 2025 at 14:30.


Roadworks Map near to The Street, SITTINGBOURNE, ME9 7UH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Mar 2025 22:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Street, SITTINGBOURNE, ME9 7UH (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks South Eastern logo
URGENT
  
SOUTH STREET ROAD 
(0.0 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Carriageway - No carriageway incursion
Complete
4 Dec 2024 11:08 - 12 Mar 2025 17:15
0.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.