ROADWORKS SUMMARY
Gayhurst Close, GILLINGHAM, ME8 9EA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Gayhurst Close, ME8 9EA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Gayhurst Close, GILLINGHAM, ME8 9EA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gayhurst Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Water logo
LONG TERM
Until
25 Jun 2026
Details
View Map
Share
Follow
Maidstone Road

Southern Water are carrying out Utility repair and maintenance works on Maidstone Road, Chatham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2023 at 08:40 and could run through until 25 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Jun 2023 at 07:53.

Kent County Council logo
LONG TERM
Until
27 Jan 2026
Details
View Map
Share
Follow
Key Street Roundabout

Kent County Council are carrying out Highway improvement works on Key Street Roundabout, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 15:00 and could run through until 27 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 12:54.

Kent County Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Sheppey Way

Kent County Council are carrying out Highway improvement works on Sheppey Way, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:30 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 May 2025 at 14:10.

Kent County Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Bobbing Hill

Kent County Council are carrying out Highway improvement works on Bobbing Hill, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 16 May 2025 at 14:13.

Kent County Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are carrying out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The works started on 31 March 2025 at 08:30 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 12:50.

Kent County Council logo
LONG TERM
Between
31 Mar and 19 Dec 2025
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are proposing to carry out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 28 Apr 2025 at 13:34.

Southern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Lawn Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Lawn Close, Luton, Chatham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 12:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 08:18.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Linden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linden Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 16:11.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Linden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linden Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 11:28.

Southern Gas Networks logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Linden Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Linden Road, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 08:39.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Westcourt Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Westcourt Street, Brompton, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 14:20 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 14:30.

UK Power Networks South Eastern logo
LONG TERM
Between
19 May and 4 Jul 2025
Details
View Map
Share
Follow
Boundary Road

UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Mar 2025 at 10:23.

UK Power Networks South Eastern logo
LONG TERM
Between
19 May and 4 Jul 2025
Details
View Map
Share
Follow
Boundary Road

UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 May 2025 at 09:26.

UK Power Networks South Eastern logo
LONG TERM
Between
19 May and 4 Jul 2025
Details
View Map
Share
Follow
Boundary Road

UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 May 2025 at 14:28.

UK Power Networks South Eastern logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Boundary Road

UK Power Networks South Eastern are carrying out New service connection on Boundary Road, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 May 2025 at 09:25.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Maidstone Road

Southern Water are carrying out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 May 2025 at 11:20.

National Highways logo
LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Follow
A249 J A2 Leave N

National Highways are proposing to carry out Highway improvement works on A249 J A2 Leave N, Swale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by National Highways on 4 Dec 2024 at 16:30.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Jan 2025 at 09:31.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Jan 2025 at 13:08.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Jan 2025 at 13:50.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jan 2025 at 09:33.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jan 2025 at 10:41.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Feb 2025 at 09:25.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Watson Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Watson Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 14:56.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 15:08.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 14:31.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 13:15.

Medway Council logo
LONG TERM
Between
27 May and 11 Jul 2025
Details
View Map
Share
Follow
Corporation Street

Medway Council are proposing to carry out Highway improvement works on Corporation Street, Rochester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 6 May 2025 at 17:20.

Southern Gas Networks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Magpie Hall Road, Chatham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 12:43.

Cityfibre Metro Networks logo
Between
29 May and 27 Jun 2025
Details
View Map
Share
Rochester Avenue

Cityfibre Metro Networks were proposing to carry out Highway repair and maintenance works on Rochester Avenue, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Apr 2025 at 12:24.

Cityfibre Metro Networks logo
Between
29 May and 19 Jun 2025
Details
View Map
Share
Rochester Avenue

Cityfibre Metro Networks were proposing to carry out Highway repair and maintenance works on Rochester Avenue, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 19 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Apr 2025 at 11:17.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Woodside

Southern Gas Networks are carrying out Utility repair and maintenance works on Woodside, Rainham, Gillingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 10:50 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 14:29.

BT logo
LONG TERM
Between
1 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Admiral Road

BT are proposing to carry out Utility asset works on Admiral Road, East Of Hucking Village, Hucking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:22.

BT logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Admiral Road

BT are carrying out Utility asset works on Admiral Road, East Of Hucking Village, Hucking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 10:17 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Jun 2025 at 10:17.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Castle Avenue

Southern Water are carrying out Utility repair and maintenance works on Castle Avenue, Rochester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 17:43 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Jun 2025 at 09:15.

Cityfibre Metro Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dunn Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Dunn Street, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Apr 2025 at 12:00.

Medway Council logo
Finishing
Monday
Details
View Map
Share
Follow
North Dane Way

Medway Council are proposing to carry out Highway improvement works on North Dane Way, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Medway Council on 6 May 2025 at 17:31.

Medway Council logo
LONG TERM
Between
2 Jun and 10 Aug 2025
Details
View Map
Share
Follow
North Dane Way

Medway Council are proposing to carry out Highway improvement works on North Dane Way, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Medway Council on 7 May 2025 at 10:21.

Southern Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
North Dane Way

Southern Water were proposing to carry out Utility repair and maintenance works on North Dane Way, Lordswood, Chatham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 May 2025 at 10:43.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Snodhurst Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Snodhurst Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 12 Mar 2025 at 10:23.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Snodhurst Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Snodhurst Avenue, Horsted, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 22 Apr 2025 at 11:49.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Snodhurst Avenue

Southern Water are carrying out Utility repair and maintenance works on Snodhurst Avenue, Horsted, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 05:55 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 2 Jun 2025 at 08:53.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Upper Luton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Luton Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Mar 2025 at 16:29.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Upper Luton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Luton Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Mar 2025 at 10:12.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Upper Luton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Luton Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Mar 2025 at 11:50.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Luton Road

UK Power Networks South Eastern are carrying out New service connection on Upper Luton Road, Luton, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 11:15 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 13:08.

UK Power Networks South Eastern logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Beacon Road

UK Power Networks South Eastern are carrying out New service connection on Beacon Road, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 11:15 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 13:08.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Horsham Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Horsham Lane, Upchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 21 Mar 2025 at 08:36.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Horsham Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Horsham Lane, Upchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Apr 2025 at 10:26.

Cityfibre Metro Networks logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Rochester Avenue

Cityfibre Metro Networks are proposing to carry out Highway repair and maintenance works on Rochester Avenue, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Apr 2025 at 12:14.

Cityfibre Metro Networks logo
Until
22 Jun 2025
Details
View Map
Share
Follow
Rochester Avenue

Cityfibre Metro Networks are carrying out Highway repair and maintenance works on Rochester Avenue, Rochester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jun 2025 at 10:56.

Southern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Redfern Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfern Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 11:36.

Southern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Redfern Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfern Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:29.

Southern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Redfern Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfern Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 12:20.

Southern Gas Networks logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Redfern Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Redfern Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:15.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Corporation Street

Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 12 Mar 2025 at 10:23.

Medway Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 4 Apr 2025 at 09:10.

Medway Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 4 Apr 2025 at 09:31.

Medway Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 7 Apr 2025 at 09:01.

Medway Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 7 Apr 2025 at 09:13.

Southern Gas Networks logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Lester Road

Southern Gas Networks were proposing to carry out New service connection on Lester Road, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 11:13.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corporation Street

Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Feb 2025 at 13:49.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corporation Street

Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Mar 2025 at 15:47.

Cityfibre Metro Networks logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Lower Warren Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Warren Road, Aylesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Jun 2025 at 16:08.

Kent County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Bricklands

Kent County Council are proposing to carry out Highway improvement works on Bricklands, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 28 May 2025 at 11:15.

Kent County Council logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Basser Hill

Kent County Council are proposing to carry out Highway improvement works on Basser Hill, Lower Halstow.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Mar 2025 at 12:53.

Kent County Council logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Basser Hill

Kent County Council are proposing to carry out Highway improvement works on Basser Hill, Lower Halstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:14.

Kent County Council logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Basser Hill

Kent County Council are proposing to carry out Highway improvement works on Basser Hill, Lower Halstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 05:47.

Medway Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Short Street

Medway Council are proposing to carry out Highway improvement works on Short Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Jun 2025 at 08:15.

Medway Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Hare Street

Medway Council are proposing to carry out Highway improvement works on Hare Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Jun 2025 at 08:15.

Medway Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Bank Street

Medway Council are proposing to carry out Utility asset works on Bank Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Jun 2025 at 08:15.

Medway Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Luton Road

Medway Council are proposing to carry out Highway improvement works on Luton Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 27 May 2025 at 11:09.

Southern Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
West Street

Southern Water were proposing to carry out Utility repair and maintenance works on West Street, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 24 Mar 2025 at 10:19.

Medway Council logo
LONG TERM
Between
9 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Corporation Street

Medway Council are proposing to carry out Highway improvement works on Corporation Street, Rochester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 13 May 2025 at 08:05.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Iwade Road

Southern Water were proposing to carry out Utility repair and maintenance works on Iwade Road, Newington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 20 Mar 2025 at 16:28.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Iwade Road

Southern Water were proposing to carry out Utility repair and maintenance works on Iwade Road, Newington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 17 Apr 2025 at 14:56.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Valley View Road

Southern Water are proposing to carry out Utility repair and maintenance works on Valley View Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 Mar 2025 at 12:04.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Valley View Road

Southern Water are proposing to carry out Utility repair and maintenance works on Valley View Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 May 2025 at 09:25.

Cityfibre Metro Networks logo
Between
12 and 15 Jun 2025
Details
View Map
Share
Follow
Chapel Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Chapel Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jun 2025 at 16:20.

South East Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
The Street

South East Water are proposing to carry out Utility repair and maintenance works on The Street, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 24 Mar 2025 at 09:32.

South East Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
The Street

South East Water are proposing to carry out Utility repair and maintenance works on The Street, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 27 May 2025 at 13:21.

Southern Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Water are proposing to carry out Remedial works on Salisbury Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Mar 2025 at 10:04.

Southern Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Water are proposing to carry out Remedial works on Salisbury Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 3 Apr 2025 at 11:18.

Southern Gas Networks logo
Between
16 and 25 Jun 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 09:34.

Southern Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
High Street

Southern Water were proposing to carry out Utility repair and maintenance works on High Street, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 31 Mar 2025 at 16:26.

Kent County Council logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
M20 J7 Leave E

Kent County Council are proposing to carry out roadworks on M20 J7 Leave E, Maidstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 9 Dec 2024 at 16:30.

Southern Gas Networks logo
Between
17 and 24 Jun 2025
Details
View Map
Share
Haig Avenue

Southern Gas Networks were proposing to carry out Disconnection or alteration of supply on Haig Avenue, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 24 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:16.

Kent County Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway improvement works on Rochester Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 May 2025 at 14:05.

Kent County Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway improvement works on Rochester Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 09:47.

Kent County Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway improvement works on Rochester Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 May 2025 at 14:05.

Kent County Council logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway improvement works on Rochester Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 09:48.

Cityfibre Metro Networks logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Oad Street

Cityfibre Metro Networks were proposing to carry out Utility asset works on Oad Street, Borden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Apr 2025 at 16:16.

Cityfibre Metro Networks logo
Between
20 and 27 Jun 2025
Details
View Map
Share
Delce Road

Cityfibre Metro Networks were proposing to carry out Highway repair and maintenance works on Delce Road, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Apr 2025 at 13:02.

Cityfibre Metro Networks logo
Between
20 and 27 Jun 2025
Details
View Map
Share
Follow
Delce Road

Cityfibre Metro Networks are proposing to carry out Highway repair and maintenance works on Delce Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Apr 2025 at 13:38.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:20.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 12:49.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 19:29.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:18.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:20.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:00.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 19:29.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 17:18.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 09:38.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:20.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:00.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 19:39.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:18.

Southern Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Franklin Road

Southern Water are proposing to carry out Utility repair and maintenance works on Franklin Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 21 Mar 2025 at 10:19.

Southern Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Franklin Road

Southern Water are proposing to carry out Utility repair and maintenance works on Franklin Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 May 2025 at 09:21.

Southern Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Franklin Road

Southern Water are proposing to carry out Utility repair and maintenance works on Franklin Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 May 2025 at 09:09.

Southern Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Maidstone Road

Southern Water are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 31 Mar 2025 at 13:57.

Cityfibre Metro Networks logo
Between
25 and 30 Jun 2025
Details
View Map
Share
Follow
Sunnyhill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sunnyhill Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Mar 2025 at 13:51.

Cityfibre Metro Networks logo
Between
26 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Lidsing Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lidsing Road, Lidsing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 May 2025 at 10:34.

BT logo
LONG TERM
Between
27 Jun and 28 Jul 2025
Details
View Map
Share
Admiral Road

BT were proposing to carry out Utility asset works on Admiral Road, East Of Hucking Village, Hucking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 28 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 7 Apr 2025 at 13:22.

Southern Gas Networks logo
Between
28 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Mar 2025 at 10:36.

Trooli logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Pilgrims Way

Trooli were proposing to carry out Utility asset works on Pilgrims Way, Thurnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 15 Apr 2025 at 11:42.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Walderslade Woods

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walderslade Woods, Boxley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Walderslade Woods

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walderslade Woods, Boxley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 13:00.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Impton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Impton Lane, Walderslade.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Impton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Impton Lane, Walderslade.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:36.

Southern Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Wallbridge Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Wallbridge Lane, Upchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Apr 2025 at 14:02.

UK Power Networks South Eastern logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Rainham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Lower Rainham Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Apr 2025 at 19:10.

BT logo
LONG TERM
Between
1 Jul and 2 Aug 2025
Details
View Map
Share
Admiral Road

BT were proposing to carry out Utility asset works on Admiral Road, East Of Hucking Village, Hucking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 2 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Apr 2025 at 09:39.

Kent County Council logo
Between
3 and 22 Jul 2025
Details
View Map
Share
Follow
Sittingbourne Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Sittingbourne Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Oct 2024 at 11:10.

Kent County Council logo
Between
3 and 26 Jul 2025
Details
View Map
Share
Follow
Sittingbourne Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Sittingbourne Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Jan 2025 at 10:25.

Kent County Council logo
Between
3 and 22 Jul 2025
Details
View Map
Share
Follow
A249 M2 J5 Roundabout

Kent County Council are proposing to carry out Highway repair and maintenance works on A249 M2 J5 Roundabout, Maidstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Jan 2025 at 16:30.

Kent County Council logo
Between
3 and 26 Jul 2025
Details
View Map
Share
Follow
A249 M2 J5 Roundabout

Kent County Council are proposing to carry out Highway repair and maintenance works on A249 M2 J5 Roundabout, Maidstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Mar 2025 at 16:30.

Trooli logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Pilgrims Way

Trooli were proposing to carry out Utility asset works on Pilgrims Way, Thurnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 19 May 2025 at 10:17.

Kent County Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Deans Bottom

Kent County Council are proposing to carry out Highway improvement works on Deans Bottom, Bredgar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Apr 2025 at 09:20.

Kent County Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Deans Bottom

Kent County Council are proposing to carry out Highway improvement works on Deans Bottom, Bredgar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Apr 2025 at 10:29.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 15:06.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:28.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 12:13.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Brasenose Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brasenose Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 16:44.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Brasenose Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brasenose Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:11.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Larkfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Larkfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Junction Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Junction Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 17:06.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Junction Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Junction Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:41.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:11.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 19:39.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 17:18.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Killick Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Killick Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 16:39.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Killick Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Killick Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 10:15.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Killick Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Killick Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 14:20.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 10:45.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 13:04.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 10:15.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 09:37.

Kent County Council logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Pond Farm Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Pond Farm Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Apr 2025 at 15:49.

Kent County Council logo
Between
12 and 23 Jul 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Rochester Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 14:42.

Kent County Council logo
Between
12 and 23 Jul 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Rochester Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Apr 2025 at 14:34.

Kent County Council logo
Between
12 and 23 Jul 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Rochester Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 14:42.

Kent County Council logo
Between
12 and 23 Jul 2025
Details
View Map
Share
Follow
Rochester Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Rochester Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Apr 2025 at 14:44.

Southern Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Meresborough Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Meresborough Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 May 2025 at 16:31.

Southern Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Meresborough Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Meresborough Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 May 2025 at 08:17.

Cityfibre Metro Networks logo
Between
18 and 21 Jul 2025
Details
View Map
Share
Follow
Matts Hill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 May 2025 at 15:46.

Cityfibre Metro Networks logo
Between
18 and 22 Jul 2025
Details
View Map
Share
South Bush Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on South Bush Lane, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 July 2025 and run through until 22 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 7 May 2025 at 10:45.

Cityfibre Metro Networks logo
Between
18 and 22 Jul 2025
Details
View Map
Share
South Bush Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on South Bush Lane, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 July 2025 and run through until 22 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 May 2025 at 16:44.

Cityfibre Metro Networks logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
South Bush Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Bush Lane, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 May 2025 at 15:46.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 May 2024 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Kitchener Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 May 2024 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Whyman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whyman Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 May 2024 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Shipwrights Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shipwrights Avenue, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 May 2024 at 07:39.

South East Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Princes Way

South East Water are proposing to carry out New service connection on Princes Way, Detling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 22 Apr 2025 at 15:09.

T-Mobile (UK) logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Hoath Way

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Hoath Way, Hempstead, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 1 Apr 2025 at 08:47.

Medway Council logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Mierscourt Road

Medway Council are proposing to carry out Utility asset works on Mierscourt Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Apr 2025 at 16:17.

Medway Council logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Medway Council are proposing to carry out Utility asset works on High Street, Rainham, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 4 Apr 2025 at 09:31.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 06:28.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Kitchener Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 06:28.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Whyman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whyman Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 11:15.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Whyman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whyman Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 06:28.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Shipwrights Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shipwrights Avenue, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 06:28.

Medway Council logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Short Street

Medway Council are proposing to carry out Utility asset works on Short Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 20 Mar 2025 at 12:18.

Medway Council logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Hare Street

Medway Council are proposing to carry out Utility asset works on Hare Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 20 Mar 2025 at 12:18.

Medway Council logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Bank Street

Medway Council are proposing to carry out Utility asset works on Bank Street, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 20 Mar 2025 at 12:18.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Carlton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 16:44.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Carlton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 10:01.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Carlton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:11.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Louisville Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Louisville Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Louisville Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Louisville Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:49.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Louisville Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Louisville Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
School Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
School Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 10:01.

Southern Gas Networks logo
Between
21 Jul and 12 Aug 2025
Details
View Map
Share
Follow
School Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Water logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Follow
John Street

Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 24 Mar 2025 at 16:08.

Southern Gas Networks logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Gas Networks are proposing to carry out New service connection on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 14:27.

Southern Gas Networks logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Gas Networks are proposing to carry out New service connection on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 10:27.

Southern Gas Networks logo
Between
22 Jul and 1 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:17.

Southern Gas Networks logo
Between
22 Jul and 1 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 10:16.

Southern Gas Networks logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Carlton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 17:18.

Southern Gas Networks logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Louisville Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Louisville Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 17:18.

Southern Gas Networks logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
School Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 17:29.

BT logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Allsworth Close

BT are proposing to carry out Utility asset works on Allsworth Close, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 May 2025 at 16:31.

BT logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Allsworth Close

BT are proposing to carry out Utility asset works on Allsworth Close, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 May 2025 at 15:54.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Maidstone Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maidstone Road, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 08:55.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Athelstan Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Athelstan Road, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 08:57.

Southern Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Magpie Hall Road

Southern Water were proposing to carry out New service connection on Magpie Hall Road, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 14 May 2025 at 11:31.

Southern Water logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Marlborough Road

Southern Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 1 May 2025 at 09:36.

UK Power Networks South Eastern logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Follow
Killick Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Mar 2025 at 12:48.

UK Power Networks South Eastern logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Killick Road

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 May 2025 at 09:55.

UK Power Networks South Eastern logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Killick Road

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 May 2025 at 11:19.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Taswell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Taswell Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 09:10.

Southern Water logo
Between
24 and 30 Jul 2025
Details
View Map
Share
Follow
Constitution Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Constitution Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 1 May 2025 at 15:03.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Feb 2025 at 13:37.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Feb 2025 at 13:51.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 May 2025 at 09:56.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Bredhurst Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bredhurst Road, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 May 2025 at 13:42.

Southern Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Iwade Road

Southern Water are proposing to carry out Utility repair and maintenance works on Iwade Road, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 15 May 2025 at 09:01.

Cityfibre Metro Networks logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Delce Road

Cityfibre Metro Networks are proposing to carry out Highway repair and maintenance works on Delce Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 May 2025 at 14:18.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Sturdee Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sturdee Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Sturdee Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sturdee Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 10:01.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Sturdee Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sturdee Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Coulman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulman Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 16:44.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Coulman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulman Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 10:01.

Southern Gas Networks logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Coulman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulman Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Energy Assets Pipelines logo
Between
28 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Jeffery Street

Energy Assets Pipelines are proposing to carry out Utility asset works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 3 Mar 2025 at 15:15.

Energy Assets Pipelines logo
Between
28 Jul and 12 Aug 2025
Details
View Map
Share
Jeffery Street

Energy Assets Pipelines were proposing to carry out Utility asset works on Jeffery Street, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 12 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 10 Mar 2025 at 13:42.

Energy Assets Pipelines logo
Between
28 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Jeffery Street

Energy Assets Pipelines are proposing to carry out Utility asset works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 12 Mar 2025 at 10:12.

Southern Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Richmond Road

Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 Apr 2025 at 13:25.

Southern Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Maidstone Road

Southern Water are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Apr 2025 at 09:42.

Cityfibre Metro Networks logo
Between
1 and 4 Aug 2025
Details
View Map
Share
Follow
Spade Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Spade Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 30 May 2025 at 17:29.

Medway Council logo
Between
1 and 29 Aug 2025
Details
View Map
Share
Follow
Shipwrights Avenue

Medway Council are proposing to carry out Remedial works on Shipwrights Avenue, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 8 Apr 2025 at 09:23.

UK Power Networks South Eastern logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Lower Rainham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Lower Rainham Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Apr 2025 at 09:18.

Southern Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Water are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 May 2025 at 16:35.

Southern Water logo
LONG TERM
Between
4 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Marlborough Road

Southern Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 30 Apr 2025 at 14:49.

Cityfibre Metro Networks logo
Between
5 and 10 Aug 2025
Details
View Map
Share
Follow
Pond Farm Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Farm Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 10 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 May 2025 at 14:32.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaconsfield Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 15:06.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaconsfield Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:49.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaconsfield Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 12:02.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Glanville Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glanville Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:03.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Glanville Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glanville Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:49.

Southern Gas Networks logo
Between
5 and 26 Aug 2025
Details
View Map
Share
Follow
Glanville Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glanville Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Cityfibre Metro Networks logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
Munsgore Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Munsgore Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 10:12.

Southern Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Maidstone Road

Southern Water are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 8 Apr 2025 at 09:23.

Southern Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Railway Street

Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 15 May 2025 at 14:49.

Southern Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Railway Street

Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 May 2025 at 11:03.

Southern Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Railway Street

Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 May 2025 at 14:18.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
First Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 16:44.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
First Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Second Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Second Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Second Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Second Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:39.

Southern Gas Networks logo
Between
12 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Feb 2025 at 13:25.

UK Power Networks South Eastern logo
Between
12 and 29 Aug 2025
Details
View Map
Share
Follow
Dawes Street

UK Power Networks South Eastern are proposing to carry out New service connection on Dawes Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 15:36.

UK Power Networks South Eastern logo
Between
12 and 29 Aug 2025
Details
View Map
Share
Follow
Canterbury Street

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 15:37.

Medway Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Union Street

Medway Council are proposing to carry out Utility asset works on Union Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 15 May 2025 at 14:49.

Cityfibre Metro Networks logo
Between
14 and 18 Aug 2025
Details
View Map
Share
Follow
Munns Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Munns Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 May 2025 at 13:21.

Medway Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Lordswood Lane

Medway Council are proposing to carry out Utility asset works on Lordswood Lane, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 16 May 2025 at 09:36.

Cityfibre Metro Networks logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Warren Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Warren Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jun 2025 at 09:21.

Cityfibre Metro Networks logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Warren Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Warren Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jun 2025 at 14:22.

Southern Gas Networks logo
Between
18 and 27 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 09:15.

UK Power Networks South Eastern logo
Between
18 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Dawes Street

UK Power Networks South Eastern are proposing to carry out New service connection on Dawes Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2025 at 08:41.

UK Power Networks South Eastern logo
Between
18 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Canterbury Street

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2025 at 08:31.

Southern Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Yaugher Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Yaugher Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 May 2025 at 12:08.

South East Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
School Lane

South East Water are proposing to carry out Utility repair and maintenance works on School Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 8 May 2025 at 15:56.

Cityfibre Metro Networks logo
Between
19 and 24 Aug 2025
Details
View Map
Share
Follow
Lower Hartlip Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Hartlip Road, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 15:37.

Cityfibre Metro Networks logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 May 2025 at 16:10.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 27 Oct 2025
Details
View Map
Share
Follow
Scotby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Scotby Avenue, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 16:03.

Southern Water logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Livingstone Road

Southern Water are proposing to carry out Utility repair and maintenance works on Livingstone Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 3 Jun 2025 at 14:09.

T-Mobile (UK) logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Hoath Way

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Hoath Way, Hempstead, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 9 Apr 2025 at 11:03.

T-Mobile (UK) logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Hoath Way

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Hoath Way, Hempstead, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 9 Apr 2025 at 11:06.

T-Mobile (UK) logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Follow
Hoath Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Hoath Way, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 9 Apr 2025 at 13:43.

T-Mobile (UK) logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Follow
Hoath Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Hoath Way, Hempstead, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 9 May 2025 at 11:59.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wetheral Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wetheral Drive, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 16:12.

Southern Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Bobbing Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Bobbing Hill, Bobbing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 19 May 2025 at 10:23.

Cityfibre Metro Networks logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Meresborough Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Meresborough Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jun 2025 at 19:07.

Cityfibre Metro Networks logo
Between
26 Aug and 13 Sep 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 15:15.

UK Power Networks South Eastern logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Dawes Street

UK Power Networks South Eastern are proposing to carry out New service connection on Dawes Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 May 2025 at 14:50.

UK Power Networks South Eastern logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Canterbury Street

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 May 2025 at 14:50.

Southern Water logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Station Road

Southern Water are proposing to carry out Utility repair and maintenance works on Station Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 May 2025 at 14:33.


Roadworks Map near to Gayhurst Close, GILLINGHAM, ME8 9EA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:37
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Gayhurst Close, GILLINGHAM, ME8 9EA (22 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
LYNDHURST AVENUE, RAINHAM 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Complete
3 Jun 2025 09:00 - 15:00
0.2
Details
Share
2
Southern Water logo
ELMSTONE ROAD, RAINHAM 
(0.3 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
30 May 2025 09:01 - 2 Jun 2025 12:26
0.3
Details
Share
3
Southern Water logo
URGENT
  
CALLIS WAY, PARKWOOD 
(0.3 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
30 May 2025 17:35 - 3 Jun 2025 12:44
0.3
Details
Share
4
Cityfibre Metro Networks logo
LYNDHURST AVENUE, RAINHAM 
(0.4 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Complete
3 Jun 2025 09:00 - 15:00
0.4
Details
Share
5
Southern Water logo
ARTHUR ROAD, RAINHAM 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
31 May 2025 08:09 - 3 Jun 2025 12:59
0.4
Details
Share
6
Southern Water logo
URGENT
  
MAIDSTONE ROAD, RAINHAM 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 24 May 2025 10:00
(Scheduled: 24 May 2025 - 6 Jun 2025)
0.4
Details
Share
Follow
7
Southern Water logo
URGENT
  
ARTHUR ROAD, RAINHAM 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 2 Jun 2025 17:53
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.4
Details
Share
Follow
8
UK Power Networks South Eastern logo
HERBERT ROAD, RAINHAM 
(0.5 miles)
UK Power Networks South Eastern
Disconnection or alteration of supply - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.5
Details
Share
9
UK Power Networks South Eastern logo
URGENT
  
HERBERT ROAD, RAINHAM 
(0.5 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 13:51
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.5
Details
Share
Follow
10
Southern Gas Networks logo
EMERGENCY
  
WOODSIDE, RAINHAM 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 30 May 2025 10:50
(Scheduled: 30 May 2025 - 6 Jun 2025)
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.