ROADWORKS SUMMARY
Hop Garden Close, GILLINGHAM, ME8 8FX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hop Garden Close, ME8 8FX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hop Garden Close, GILLINGHAM, ME8 8FX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hop Garden Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Water logo
LONG TERM
Until
25 Jun 2026
Details
View Map
Share
Follow
Maidstone Road

Southern Water are carrying out Utility repair and maintenance works on Maidstone Road, Chatham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2023 at 08:40 and could run through until 25 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Jun 2023 at 07:53.

Kent County Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Swale Way

Kent County Council are carrying out Highway improvement works on Swale Way, Off Castle Road, Sittingbourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 August 2023 at 09:00 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 10 Jul 2025 at 08:15.

Kent County Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Grovehurst Road

Kent County Council are carrying out Highway improvement works on Grovehurst Road, Sittingbourne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 August 2023 at 09:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Jul 2025 at 08:15.

Kent County Council logo
LONG TERM
Until
27 Jan 2026
Details
View Map
Share
Follow
Key Street Roundabout

Kent County Council are carrying out Highway improvement works on Key Street Roundabout, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 15:00 and could run through until 27 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 15 Jul 2025 at 09:00.

Kent County Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Sheppey Way

Kent County Council are carrying out Highway improvement works on Sheppey Way, Bobbing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 Jul 2025 at 14:43.

Kent County Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are carrying out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The works started on 31 March 2025 at 08:30 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 12:50.

Kent County Council logo
LONG TERM
Between
31 Mar and 19 Dec 2025
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are proposing to carry out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 28 Apr 2025 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 15:06.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:28.

Southern Gas Networks logo
LONG TERM
Until
17 Sep 2025
Details
View Map
Share
Follow
Barnsole Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Barnsole Road, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 July 2025 at 11:00 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Aug 2025 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Brasenose Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brasenose Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 16:44.

Kent County Council logo
LONG TERM
Between
14 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are proposing to carry out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 14 Jul 2025 at 09:50.

Kent County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Chestnut Street

Kent County Council are carrying out Highway improvement works on Chestnut Street, Borden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 07:30 and could run through until 7 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Kent County Council on 31 Jul 2025 at 12:32.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 19 Sep 2025
Details
View Map
Share
Carlton Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Carlton Avenue, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:07.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 24 Oct 2025
Details
View Map
Share
Cryalls Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Cryalls Lane, Sittingbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Mar 2025 at 10:16.

Southern Water logo
LONG TERM
Between
4 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Marlborough Road

Southern Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 30 Apr 2025 at 14:49.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dawes Street

UK Power Networks South Eastern are proposing to carry out New service connection on Dawes Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2025 at 08:41.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Canterbury Street

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2025 at 08:31.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
First Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:17.

Southern Gas Networks logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Second Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Second Avenue, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:15 and could run through until 11 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:36.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:17.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 27 Oct 2025
Details
View Map
Share
Follow
Scotby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Scotby Avenue, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 27 Oct 2025
Details
View Map
Share
Follow
Scotby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Scotby Avenue, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:27.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wetheral Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wetheral Drive, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 09:43.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wetheral Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wetheral Drive, Walderslade, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:27.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Wetheral Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wetheral Drive, Walderslade, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 11:48.

Cityfibre Metro Networks logo
Between
26 Aug and 13 Sep 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 15:15.

Cityfibre Metro Networks logo
Until
13 Sep 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are carrying out Utility asset works on The Street, Hartlip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Aug 2025 at 09:20.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Park Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 12:06.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 13:18.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Seaton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 12:01.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 13:29.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Oxford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 12:09.

Southern Gas Networks logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 13:29.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eastcourt Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Eastcourt Lane, Twydall, Gillingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 15:57 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 13:16.

UK Power Networks South Eastern logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Dawes Street

UK Power Networks South Eastern are proposing to carry out New service connection on Dawes Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 May 2025 at 14:50.

UK Power Networks South Eastern logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Canterbury Street

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Street, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 May 2025 at 14:50.

Electricity Network Company logo
Between
28 Aug and 12 Sep 2025
Details
View Map
Share
Lordswood Lane

Electricity Network Company were proposing to carry out Utility asset works on Lordswood Lane, Lordswood, Chatham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2025 and run through until 12 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 2 Sep 2025 at 12:17.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Jul 2025 at 13:37.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are carrying out Utility asset works on The Street, Stockbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 16:30 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2025 at 16:41.

Cityfibre Metro Networks logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Oad Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Oad Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 11:11.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Hearts Delight

Cityfibre Metro Networks were proposing to carry out Utility asset works on Hearts Delight, Borden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Jun 2025 at 16:38.

Southern Gas Networks logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Scotby Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Scotby Avenue, Walderslade, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:30 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 15:55.

Southern Gas Networks logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Lordswood Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Lordswood Lane, Lordswood, Chatham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:30 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 15:56.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Iwade Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Iwade Road, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jun 2025 at 08:39.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jun 2025 at 13:27.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are carrying out Utility asset works on School Lane, Newington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:00 and could run through until 3 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Sep 2025 at 10:05.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Follow
Boxted Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Boxted Lane, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jun 2025 at 08:38.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Boxted Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Boxted Lane, Newington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Jun 2025 at 14:11.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Constitution Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Constitution Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 15 May 2025 at 09:10.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Killick Road

UK Power Networks South Eastern are carrying out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:41 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 08:41.

Southern Water logo
Finishing
Today
Details
View Map
Share
Follow
Laburnum Place

Southern Water are carrying out Utility repair and maintenance works on Laburnum Place, Sittingbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 3 Sep 2025 at 07:45.

Medway Council logo
Finishing
Friday
Details
View Map
Share
Follow
Medway Street

Medway Council are carrying out Highway improvement works on Medway Street, Chatham.

The works started on 3 September 2025 at 00:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Sep 2025 at 09:20.

Cityfibre Metro Networks logo
Between
6 and 10 Sep 2025
Details
View Map
Share
Follow
Sunnyhill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sunnyhill Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jul 2025 at 11:51.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Boxted Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Boxted Lane, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jul 2025 at 10:44.

Cityfibre Metro Networks logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Hearts Delight

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hearts Delight, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Jul 2025 at 10:12.

Cityfibre Metro Networks logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Forge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Forge Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jun 2025 at 09:21.

Cityfibre Metro Networks logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Forge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Forge Lane, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Sep 2025 at 11:35.

Cityfibre Metro Networks logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Lower Hartlip Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Hartlip Road, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jul 2025 at 14:07.

Southern Water logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Constitution Hill

Southern Water were proposing to carry out Utility repair and maintenance works on Constitution Hill, Luton, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 1 Aug 2025 at 18:25.

Medway Council logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Union Street

Medway Council are proposing to carry out Highway improvement works on Union Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 20 Aug 2025 at 10:59.

Medway Council logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Union Street

Medway Council are proposing to carry out Highway improvement works on Union Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 26 Aug 2025 at 10:40.

Cityfibre Metro Networks logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Iwade Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Iwade Road, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jul 2025 at 11:27.

Cityfibre Metro Networks logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Iwade Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Iwade Road, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Sep 2025 at 08:27.

Southern Water logo
Between
10 and 12 Sep 2025
Details
View Map
Share
Follow
Frederick Street

Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 17 Jun 2025 at 12:14.

T-Mobile (UK) logo
Between
10 and 18 Sep 2025
Details
View Map
Share
Follow
Teasel Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Teasel Road, Weeds Wood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 18 September 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Feb 2025 at 16:44.

Medway Council logo
On
11 Sep 2025
Details
View Map
Share
Follow
Stafford Street

Medway Council are proposing to carry out Utility asset works on Stafford Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 15 Aug 2025 at 09:18.

Cityfibre Metro Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Hearts Delight

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hearts Delight, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Jul 2025 at 10:13.

Cityfibre Metro Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Mount Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mount Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 13:20.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Lordswood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordswood Lane, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 13:00.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Lordswood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordswood Lane, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 14:17.

UK Power Networks South Eastern logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Academy Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Academy Drive, Darland, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Jun 2025 at 11:58.

UK Power Networks South Eastern logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Academy Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Academy Drive, Darland, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 14:34.

UK Power Networks South Eastern logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Academy Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Academy Drive, Darland, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 10:46.

Kent County Council logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Godwin Close

Kent County Council are proposing to carry out Section 50 on Godwin Close, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 20 Aug 2025 at 09:49.

Southern Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Edinburgh Road

Southern Water are proposing to carry out Utility repair and maintenance works on Edinburgh Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 19 Jun 2025 at 14:32.

Southern Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Edinburgh Road

Southern Water are proposing to carry out Utility repair and maintenance works on Edinburgh Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 26 Aug 2025 at 15:03.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:52.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Charlotte Street

Southern Water are proposing to carry out Utility repair and maintenance works on Charlotte Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Jul 2025 at 19:58.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Charlotte Street

Southern Water are proposing to carry out Utility repair and maintenance works on Charlotte Street, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Aug 2025 at 15:03.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Beacon Hill

Southern Water were proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Jun 2025 at 11:18.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Beacon Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Jun 2025 at 11:39.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Beacon Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Aug 2025 at 13:00.

Southern Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Beacon Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Aug 2025 at 11:37.

Medway Council logo
On
17 Sep 2025
Details
View Map
Share
Follow
Hawthorne Avenue

Medway Council are proposing to carry out Utility asset works on Hawthorne Avenue, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 17 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 15 Aug 2025 at 09:32.

Cityfibre Metro Networks logo
Between
20 and 24 Sep 2025
Details
View Map
Share
Follow
Place Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Place Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 12:01.

Cityfibre Metro Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Bimbury Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bimbury Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Jul 2025 at 11:27.

Cityfibre Metro Networks logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Yelsted Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Yelsted Road, Yelsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Aug 2025 at 10:22.

Cityfibre Metro Networks logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Hill, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Jul 2025 at 14:14.

Cityfibre Metro Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Hill, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2025 at 11:29.

Cityfibre Metro Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Hill, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2025 at 12:56.

Cityfibre Metro Networks logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Jul 2025 at 11:37.

Cityfibre Metro Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Bannister Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bannister Hill, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Jul 2025 at 13:36.

Southern Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Matts Hill Road

Southern Water are proposing to carry out Utility repair and maintenance works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 30 Jun 2025 at 07:22.

Southern Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Matts Hill Road

Southern Water are proposing to carry out Utility repair and maintenance works on Matts Hill Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Sep 2025 at 15:04.

Southern Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Old House Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Old House Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Jul 2025 at 09:48.

Southern Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Old House Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Old House Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Aug 2025 at 15:04.

Southern Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Cambridge Road

Southern Water are proposing to carry out Utility repair and maintenance works on Cambridge Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 25 Jun 2025 at 11:40.

Southern Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Cambridge Road

Southern Water are proposing to carry out Utility repair and maintenance works on Cambridge Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 2 Sep 2025 at 15:04.

Medway Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Grange Hill

Medway Council were proposing to carry out Highway improvement works on Grange Hill, Luton, Chatham.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Medway Council on 10 Jul 2025 at 13:40.

Medway Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Grange Hill

Medway Council are proposing to carry out Highway improvement works on Grange Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 10 Jul 2025 at 13:40.

Medway Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Thorold Road

Medway Council are proposing to carry out Highway improvement works on Thorold Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 10 Jul 2025 at 13:40.

Medway Council logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Globe Lane

Medway Council were proposing to carry out Utility asset works on Globe Lane, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 20 Aug 2025 at 08:03.

Medway Council logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Globe Lane

Medway Council are proposing to carry out Utility asset works on Globe Lane, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 20 Aug 2025 at 11:11.

Medway Council logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Globe Lane

Medway Council are proposing to carry out Utility asset works on Globe Lane, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 2 Sep 2025 at 14:20.

Cityfibre Metro Networks logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
Hearts Delight

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hearts Delight, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 10:29.

Southern Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out New service connection on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Aug 2025 at 15:29.

Southern Water logo
Between
23 and 29 Sep 2025
Details
View Map
Share
Follow
West Street

Southern Water are proposing to carry out Utility repair and maintenance works on West Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 30 Jun 2025 at 17:18.

Southern Water logo
Between
24 and 30 Sep 2025
Details
View Map
Share
Follow
William Street

Southern Water are proposing to carry out Utility repair and maintenance works on William Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Jul 2025 at 13:06.

Southern Water logo
Between
24 and 30 Sep 2025
Details
View Map
Share
Follow
William Street

Southern Water are proposing to carry out Utility repair and maintenance works on William Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Jul 2025 at 10:47.

Cityfibre Metro Networks logo
Between
25 and 28 Sep 2025
Details
View Map
Share
Follow
Meresborough Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Meresborough Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 11:50.

Cityfibre Metro Networks logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Jul 2025 at 13:33.

Medway Council logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Hoath Way

Medway Council are proposing to carry out Highway improvement works on Hoath Way, Hempstead, Gillingham.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 2 Sep 2025 at 10:46.

Cityfibre Metro Networks logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Dane Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Dane Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 11:29.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Kingston Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingston Crescent, Lordswood, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2025 at 10:17.

Medway Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Union Street

Medway Council are proposing to carry out Highway improvement works on Union Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 2 Sep 2025 at 16:41.

Medway Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Brook

Medway Council are proposing to carry out Highway improvement works on The Brook, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 11 Aug 2025 at 13:53.

Medway Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Brook

Medway Council are proposing to carry out Highway improvement works on The Brook, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 26 Aug 2025 at 10:52.

Medway Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Brook

Medway Council are proposing to carry out Highway improvement works on The Brook, Chatham.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 6 Aug 2025 at 14:39.

Medway Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
The Brook

Medway Council are proposing to carry out Highway improvement works on The Brook, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 8 Aug 2025 at 12:38.

Cityfibre Metro Networks logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Hill Green Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hill Green Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Jul 2025 at 15:01.

Cityfibre Metro Networks logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Yelsted Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Yelsted Road, Yelsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Jul 2025 at 14:42.

Cityfibre Metro Networks logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hearts Delight

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hearts Delight, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 11:05.

Kent County Council logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Cryalls Lane

Kent County Council are proposing to carry out Highway improvement works on Cryalls Lane, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Aug 2025 at 16:18.

Kent County Council logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Cryalls Lane

Kent County Council are proposing to carry out Highway improvement works on Cryalls Lane, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 Aug 2025 at 09:50.

Southern Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Horsham Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Horsham Lane, Upchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Jul 2025 at 14:07.

Southern Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Horsham Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Horsham Lane, Upchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Jul 2025 at 12:17.

UK Power Networks South Eastern logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Nile Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Nile Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Jun 2025 at 10:52.

Southern Gas Networks logo
Between
6 and 14 Oct 2025
Details
View Map
Share
Follow
Milburn Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Milburn Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 10:47.

Cityfibre Metro Networks logo
Between
9 and 25 Oct 2025
Details
View Map
Share
Follow
Hill Green Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hill Green Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2025 at 10:17.

Cityfibre Metro Networks logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Bannister Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bannister Hill, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 11:07.

Cityfibre Metro Networks logo
Between
10 and 21 Oct 2025
Details
View Map
Share
Follow
West Wood Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on West Wood Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Jul 2025 at 15:14.

South East Water logo
Between
12 and 14 Oct 2025
Details
View Map
Share
Follow
Church Lane

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane, Bicknor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 14 October 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 10 Jul 2025 at 14:39.

Cityfibre Metro Networks logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Chalky Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Chalky Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 12:51.

Cityfibre Metro Networks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Sunnyhill Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sunnyhill Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Jul 2025 at 12:33.

Southern Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
College Road

Southern Water are proposing to carry out Utility repair and maintenance works on College Road, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Aug 2025 at 09:41.

Southern Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Kimberley Road

Southern Water are proposing to carry out Utility repair and maintenance works on Kimberley Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 Jul 2025 at 10:58.

Cityfibre Metro Networks logo
Between
15 and 28 Oct 2025
Details
View Map
Share
Follow
South Street Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 13:46.

Cityfibre Metro Networks logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Follow
Oad Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Oad Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2025 at 13:46.

Cityfibre Metro Networks logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Hearts Delight

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hearts Delight, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2025 at 10:49.

UK Power Networks South Eastern logo
Between
15 Oct and 3 Nov 2025
Details
View Map
Share
Follow
School Lane

UK Power Networks South Eastern are proposing to carry out New service connection on School Lane, Iwade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 3 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Aug 2025 at 10:59.

Cityfibre Metro Networks logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Rumstead Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Rumstead Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 14:36.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Pond Farm Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Farm Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Jun 2025 at 08:23.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Aug 2025 at 11:03.

Southern Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
College Road

Southern Water are proposing to carry out Utility repair and maintenance works on College Road, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Aug 2025 at 11:32.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jul 2025 at 13:26.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Aug 2025 at 08:19.

Southern Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Station Road

Southern Water are proposing to carry out New service connection on Station Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Jun 2025 at 14:58.

Medway Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Edinburgh Road

Medway Council are proposing to carry out Utility asset works on Edinburgh Road, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Sep 2025 at 10:46.

Southern Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Magpie Hall Road

Southern Water were proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 31 Jul 2025 at 11:42.

Southern Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Water are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Sep 2025 at 09:13.

Medway Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Lower Rainham Road

Medway Council are proposing to carry out Utility asset works on Lower Rainham Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 31 Aug 2025 at 14:06.

Medway Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Lower Rainham Road

Medway Council are proposing to carry out Utility asset works on Lower Rainham Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 3 Sep 2025 at 10:46.

Southern Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Livingstone Road

Southern Water are proposing to carry out Utility repair and maintenance works on Livingstone Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 8 Jul 2025 at 08:25.

Southern Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Napier Road

Southern Water are proposing to carry out New service connection on Napier Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 16 Jul 2025 at 14:43.

Cityfibre Metro Networks logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Pett Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pett Lane, Bredgar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jul 2025 at 12:01.

Southern Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
High Street

Southern Water were proposing to carry out Utility repair and maintenance works on High Street, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Jul 2025 at 11:42.

Medway Council logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Whyman Avenue

Medway Council are proposing to carry out Utility asset works on Whyman Avenue, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 1 Sep 2025 at 10:12.

UK Power Networks South Eastern logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
School Lane

UK Power Networks South Eastern are proposing to carry out New service connection on School Lane, Iwade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 14:55.

Cityfibre Metro Networks logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 14:52.

Cityfibre Metro Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Hill Green Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hill Green Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Jul 2025 at 08:46.

Cityfibre Metro Networks logo
Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
West Wood Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on West Wood Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 14:54.

Cityfibre Metro Networks logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Pond Farm Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Farm Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Sep 2025 at 11:34.

Cityfibre Metro Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Jul 2025 at 14:04.

Cityfibre Metro Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lower Hartlip Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Hartlip Road, Hartlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2025 at 10:17.

Southern Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Harrow Road

Southern Water were proposing to carry out Utility repair and maintenance works on Harrow Road, Hempstead, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 30 Jul 2025 at 10:57.

Cityfibre Metro Networks logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Bricklands

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bricklands, Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Sep 2025 at 13:19.

Southern Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Meresborough Road

Southern Water were proposing to carry out Utility repair and maintenance works on Meresborough Road, Rainham, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Jul 2025 at 11:59.

Southern Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Meresborough Road

Southern Water are proposing to carry out Utility repair and maintenance works on Meresborough Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Jul 2025 at 13:38.

Medway Council logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Waterfront Way

Medway Council are proposing to carry out Utility asset works on Waterfront Way, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 21 Aug 2025 at 10:11.

Medway Council logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Globe Lane

Medway Council are proposing to carry out Utility asset works on Globe Lane, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 21 Aug 2025 at 10:11.

Medway Council logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Globe Lane

Medway Council are proposing to carry out Utility asset works on Globe Lane, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Medway Council on 20 Aug 2025 at 11:11.

South East Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
School Lane

South East Water were proposing to carry out Utility repair and maintenance works on School Lane, Borden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 30 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South East Water on 7 Jul 2025 at 09:29.

UK Power Networks South Eastern logo
LONG TERM
Between
29 Oct and 9 Dec 2025
Details
View Map
Share
Follow
Medway Street

UK Power Networks South Eastern are proposing to carry out Utility asset works on Medway Street, Chatham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2025 at 12:48.

Cityfibre Metro Networks logo
Between
30 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Breach Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Breach Lane, Upchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Sep 2025 at 12:56.

Cityfibre Metro Networks logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
South Street Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2025 at 10:08.

Cityfibre Metro Networks logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
South Street Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2025 at 08:35.

Cityfibre Metro Networks logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Bannister Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bannister Hill, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2025 at 13:43.

Southern Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Magpie Hall Road

Southern Water are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 Jul 2025 at 11:13.

Southern Water logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Water are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Aug 2025 at 21:28.

Cityfibre Metro Networks logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Yelsted Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Yelsted Lane, Sittingbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Aug 2025 at 15:49.

Cityfibre Metro Networks logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Pond Farm Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Farm Road, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Sep 2025 at 11:53.

UK Power Networks South Eastern logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Leafy Glade

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Leafy Glade, Wigmore, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2025 at 10:39.

Southern Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Lower Twydall Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Lower Twydall Lane, Twydall, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 11 Aug 2025 at 16:18.

Southern Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Edwin Road

Southern Water are proposing to carry out Utility repair and maintenance works on Edwin Road, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 20 Aug 2025 at 11:45.

Cityfibre Metro Networks logo
Between
17 and 25 Nov 2025
Details
View Map
Share
Follow
Oad Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Oad Street, Borden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Aug 2025 at 19:07.

Cityfibre Metro Networks logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
West Wood Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on West Wood Road, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Aug 2025 at 10:24.

Southern Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Dunn Street Road

Southern Water are proposing to carry out New service connection on Dunn Street Road, Bredhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 28 Aug 2025 at 11:19.

Southern Water logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Ten Acre Way

Southern Water are proposing to carry out Utility repair and maintenance works on Ten Acre Way, Rainham, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 18 Aug 2025 at 14:38.

Southern Water logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Ten Acre Way

Southern Water are proposing to carry out Utility repair and maintenance works on Ten Acre Way, Rainham, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 26 Aug 2025 at 10:29.

Southern Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Milburn Road

Southern Water are proposing to carry out Utility repair and maintenance works on Milburn Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Aug 2025 at 15:32.

Cityfibre Metro Networks logo
Between
19 and 25 Nov 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Aug 2025 at 18:36.

Southern Water logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Henry Street

Southern Water are proposing to carry out Utility repair and maintenance works on Henry Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 2 Sep 2025 at 14:20.

Southern Water logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Henry Street

Southern Water are proposing to carry out Utility repair and maintenance works on Henry Street, Rainham, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 3 Sep 2025 at 10:25.

Cityfibre Metro Networks logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Bimbury Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bimbury Lane, Stockbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2025 at 10:14.

Cityfibre Metro Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Hill Green Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Hill Green Road, Stockbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Aug 2025 at 18:26.

UK Power Networks South Eastern logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Gillingham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gillingham Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Aug 2025 at 10:11.


Roadworks Map near to Hop Garden Close, GILLINGHAM, ME8 8FX (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hop Garden Close, GILLINGHAM, ME8 8FX (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Water logo
WINCHESTER WAY, RAINHAM 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 1 Sep 2025 13:58
(Scheduled: 29 Aug 2025 - 3 Sep 2025)
0.4
Details
Share
Follow
2
Southern Water logo
MARDALE CLOSE, RAINHAM 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.4
Details
Share
Follow
3
Southern Water logo
HENRY STREET, RAINHAM 
(0.5 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.5
Details
Share
Follow
4
Southern Water logo
MOOR PARK CLOSE, RAINHAM 
(0.6 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 1 Sep 2025 08:53
(Scheduled: 29 Aug 2025 - 5 Sep 2025)
0.6
Details
Share
Follow
5
Energy Assets Networks (formerly Utility Distribution Networks) logo
LOWER RAINHAM ROAD, RAINHAM 
(0.8 miles)
Energy Assets Networks (formerly Utility Distribution Networks)
Utility asset works - Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2025 - 8 Sep 2025)
0.8
Details
Share
6
Southern Water logo
LONSDALE DRIVE, RAINHAM 
(0.9 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 1 Sep 2025 12:34
(Scheduled: 1 Sep 2025 - 3 Sep 2025)
0.9
Details
Share
Follow
7
Southern Water logo
URGENT
  
SOUTH BUSH LANE 
(1.0 miles)
Southern Water
Utility repair and maintenance works - Verge - Road closure
Complete
2 Sep 2025 03:45 - 14:42
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.