ROADWORKS SUMMARY
Park End View, Kingsmead Park, ROCHESTER, ME3 9TR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Park End View, Kingsmead Park, ME3 9TR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Park End View, Kingsmead Park, ROCHESTER, ME3 9TR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Park End View, Kingsmead Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Fairlop Avenue

Cadent Gas were proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:57.

Until
15 Jan 2025
Details
View Map
Share
Follow
Ash Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Ash Road, Canvey Island.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 11:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Jan 2025 at 14:49.

Cadent Gas logo
Until
27 Jan 2025
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are carrying out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

The works started on 6 January 2025 at 11:05 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:28.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 14:32.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:09.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:40.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Thelma Avenue

Cadent Gas were proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:59.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Lionel Road

Cadent Gas were proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:00.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:30.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:12.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Eastern Esplanade

Essex County Council are proposing to carry out Remedial works on Eastern Esplanade, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Dec 2024 at 14:25.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Remedial works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Dec 2024 at 14:27.

Cadent Gas logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Waarem Avenue

Cadent Gas are proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:14.

Cadent Gas logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Waarem Avenue

Cadent Gas were proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 17:24.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Lionel Road

Cadent Gas were proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:01.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:26.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:17.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:22.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:00.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Fairlop Avenue

Cadent Gas were proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:00.

Southern Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bells Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bells Lane, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 3 Jan 2025 at 11:02.

Southern Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bells Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bells Lane, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 1 Nov 2024 at 10:04.

Essex County Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Highway improvement works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Dec 2024 at 12:21.

Essex County Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Western Esplanade

Essex County Council are proposing to carry out Highway improvement works on Western Esplanade, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Dec 2024 at 12:15.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Thisselt Road

Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:16.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Thisselt Road

Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:28.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Thisselt Road

Cadent Gas were proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:44.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Linde Road

Cadent Gas were proposing to carry out Utility asset works on Linde Road, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:44.

Cadent Gas logo
Between
17 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:00.

Cadent Gas logo
Between
17 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 15:40.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:24.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 08:39.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 15:03.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Esplanade Gardens

Cadent Gas are proposing to carry out Utility asset works on Esplanade Gardens, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:03.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Esplanade Gardens

Cadent Gas are proposing to carry out Utility asset works on Esplanade Gardens, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 09:39.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
First Avenue

Cadent Gas are proposing to carry out Utility asset works on First Avenue, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 10:59.


Roadworks Map near to Park End View, Kingsmead Park, ROCHESTER, ME3 9TR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 7 Jan 2025 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Park End View, Kingsmead Park, ROCHESTER, ME3 9TR (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Medway Council logo
AVERY WAY, ALLHALLOWS 
(0.5 miles)
Medway Council
Highway improvement works - Footway - No carriageway incursion
Planned
Scheduled: 7 Jan 2025 - 9 Jan 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.