ROADWORKS SUMMARY
Seafront, ROCHESTER, ME3 9RY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Seafront, ME3 9RY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Seafront, ROCHESTER, ME3 9RY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Seafront are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Peninsula Way

Southern Water are carrying out Utility repair and maintenance works on Peninsula Way, Hoo St Werburgh, Rochester.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:29 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 11 Feb 2025 at 08:07.

Southern Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Peninsula Way

Southern Water are proposing to carry out Utility repair and maintenance works on Peninsula Way, Hoo St Werburgh, Rochester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 6 Feb 2025 at 12:20.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 15:03.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 08:39.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Chalkwell Avenue

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:24.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:44.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chalkwell Esplanade

Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:00.

Southend-on-sea Borough Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fernleigh Drive

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Fernleigh Drive, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 6 Jan 2025 at 09:17.

Southend-on-sea Borough Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fernleigh Drive

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Fernleigh Drive, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 27 Dec 2024 at 14:52.

Anglian Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Belton Gardens

Anglian Water are proposing to carry out Utility repair and maintenance works on Belton Gardens, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Mar 2025 at 13:56.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Silver Point Marine

Essex County Council are proposing to carry out Highway improvement works on Silver Point Marine, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 10:37.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Silver Point Marine

Essex County Council are proposing to carry out Highway improvement works on Silver Point Marine, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 13:54.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Beveland Road

Essex County Council are proposing to carry out Highway improvement works on Beveland Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 13:50.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Point Road

Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 13:48.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Point Road

Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 11:34.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Zelham Drive

Essex County Council are proposing to carry out Highway improvement works on Zelham Drive, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:50.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Chapman Road

Essex County Council are proposing to carry out Highway improvement works on Chapman Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 13:55.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Bommel Avenue

Essex County Council are proposing to carry out Highway improvement works on Bommel Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 10:28.

Essex County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Point Road

Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:32.

Essex County Council logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Zelham Drive

Essex County Council are proposing to carry out Highway improvement works on Zelham Drive, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 11:15.

Essex County Council logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Beveland Road

Essex County Council are proposing to carry out Highway improvement works on Beveland Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 11:31.

Essex County Council logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Chapman Road

Essex County Council are proposing to carry out Highway improvement works on Chapman Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 12:28.

Essex County Council logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Bommel Avenue

Essex County Council are proposing to carry out Highway improvement works on Bommel Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 11:19.

Essex County Council logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Point Road

Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 10:53.

Cadent Gas logo
Between
28 Apr and 26 May 2025
Details
View Map
Share
Follow
Thorney Bay Road

Cadent Gas are proposing to carry out Utility asset works on Thorney Bay Road, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 15:48.

UK Power Networks Eastern & London logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
St John's Road

UK Power Networks Eastern & London were proposing to carry out New service connection on St John's Road, Westcliff-on-sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 15:14.

Cadent Gas logo
Between
28 Apr and 26 May 2025
Details
View Map
Share
Follow
Thorney Bay Road

Cadent Gas are proposing to carry out Utility asset works on Thorney Bay Road, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 11:19.

Southend-on-sea Borough Council logo
Between
30 Apr and 9 May 2025
Details
View Map
Share
Follow
Seaview Road

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Seaview Road, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 11 Feb 2025 at 12:31.

Essex County Council logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
Labworth Road

Essex County Council are proposing to carry out Highway improvement works on Labworth Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 14:44.

Network Rail logo
Between
10 and 12 May 2025
Details
View Map
Share
Follow
The Ridgeway

Network Rail are proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Feb 2025 at 14:58.

Between
13 and 15 May 2025
Details
View Map
Share
Follow
Ash Road

Essex And Suffolk Water are proposing to carry out Remedial works on Ash Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 25 Feb 2025 at 09:45.

Southend-on-sea Borough Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Western Esplanade

Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Western Esplanade, Southend-on-sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 12 Mar 2025 at 14:43.

Southend-on-sea Borough Council logo
Between
19 and 21 May 2025
Details
View Map
Share
St John's Road

Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on St John's Road, Westcliff-on-sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southend-on-sea Borough Council on 12 Mar 2025 at 15:09.

Southend-on-sea Borough Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Western Esplanade

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Esplanade, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 7 Mar 2025 at 12:06.

Southend-on-sea Borough Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Western Esplanade

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Esplanade, Westcliff-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 13 Mar 2025 at 12:18.

UK Power Networks South Eastern logo
Between
19 May and 5 Jun 2025
Details
View Map
Share
Follow
Forge Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Forge Lane, High Halstow, Rochester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Feb 2025 at 20:50.

UK Power Networks Eastern & London logo
Between
20 and 27 May 2025
Details
View Map
Share
Linden Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Linden Way, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 May 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 09:44.

Southend-on-sea Borough Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Leigh Road

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Leigh Road, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 26 Feb 2025 at 14:20.

Cadent Gas logo
LONG TERM
Between
26 May and 7 Jul 2025
Details
View Map
Share
Follow
Western Esplanade

Cadent Gas are proposing to carry out Utility asset works on Western Esplanade, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
26 May and 7 Jul 2025
Details
View Map
Share
Follow
Western Esplanade

Cadent Gas are proposing to carry out Utility asset works on Western Esplanade, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:58.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
26 May and 7 Jul 2025
Details
View Map
Share
Follow
Western Esplanade

Cadent Gas are proposing to carry out Utility asset works on Western Esplanade, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:33.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:41.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 13:33.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 15:17.

Cadent Gas logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Leigh Road

Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:44.

Southend-on-sea Borough Council logo
Between
4 and 18 Jun 2025
Details
View Map
Share
Follow
Western Esplanade

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Esplanade, Southend-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 13 Mar 2025 at 12:18.

Southend-on-sea Borough Council logo
Between
4 and 18 Jun 2025
Details
View Map
Share
Follow
Western Esplanade

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Esplanade, Southend-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 13 Mar 2025 at 12:04.


Roadworks Map near to Seafront, ROCHESTER, ME3 9RY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Mar 2025 01:12
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Seafront, ROCHESTER, ME3 9RY (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Medway Council logo
AVERY WAY, ALLHALLOWS 
(0.1 miles)
Medway Council
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 13 Mar 2025 10:00
(Scheduled: 13 Mar 2025 - 17 Mar 2025)
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.