ROADWORKS SUMMARY
Gypsy Way, ROCHESTER, ME3 8DX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Gypsy Way, ME3 8DX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Gypsy Way, ROCHESTER, ME3 8DX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gypsy Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Toronto Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Toronto Road, Gillingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 09:15 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
19 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Brompton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brompton Lane, Strood, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 12:48.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Strood, Rochester.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 22:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:57.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Strood, Rochester.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:54.

Medway Council logo
Finishing
Today
Details
View Map
Share
Follow
Main Road

Medway Council are carrying out Highway improvement works on Main Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 10:08 and could run through until 24 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Medway Council on 21 Nov 2024 at 12:46.

Southern Gas Networks logo
Between
25 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Toronto Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Toronto Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:45.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hermitage Road

Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 21 Oct 2024 at 10:35.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hermitage Road

Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 21 Aug 2024 at 12:49.

Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Corporation Street

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 31 Oct 2024 at 15:31.

Southern Water logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
High Street

Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Sep 2024 at 15:58.

Southern Water logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Gundulph Road

Southern Water are proposing to carry out Utility repair and maintenance works on Gundulph Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Sep 2024 at 15:58.

Southern Water logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
High Street

Southern Water were proposing to carry out Permanent reinstatement on High Street, Chatham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Sep 2024 at 14:29.

Cityfibre Metro Networks logo
Between
27 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Dux Court Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Dux Court Road, Hoo St Werburgh, Rochester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 12:46.

Medway Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 7 Mar 2024 at 09:48.

Medway Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Medway Tunnel

Medway Council are proposing to carry out Utility asset works on Medway Tunnel, Chatham Maritime, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Medway Council on 17 Jan 2024 at 11:21.

Southern Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Frederick Road

Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 Oct 2024 at 09:16.

Southern Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Frederick Road

Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Aug 2024 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
3 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:39.

Essex County Council logo
Between
8 and 10 Dec 2024
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Remedial works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 14:14.

Essex County Council logo
Between
8 and 10 Dec 2024
Details
View Map
Share
Follow
Western Esplanade

Essex County Council are proposing to carry out Highway improvement works on Western Esplanade, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 12:55.

Trooli logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Malmaynes Hall Road

Trooli are proposing to carry out Utility asset works on Malmaynes Hall Road, Stoke, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 11:30.

Southern Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Railway Street

Southern Water were proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 19 Sep 2024 at 12:58.

Trooli logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Malmaynes Hall Road

Trooli are proposing to carry out Utility asset works on Malmaynes Hall Road, Stoke, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Trooli on 22 Nov 2024 at 16:21.

Trooli logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Grain Road

Trooli are proposing to carry out Utility asset works on Grain Road, Lower Stoke, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 11:30.

Southern Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Knight Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Knight Avenue, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Sep 2024 at 11:24.

Trooli logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Grain Road

Trooli are proposing to carry out Utility asset works on Grain Road, Middle Stoke, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 11:30.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Church Street

UK Power Networks South Eastern are proposing to carry out New service connection on Church Street, Cliffe, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2024 at 11:33.

Trooli logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Malmaynes Hall Road

Trooli were proposing to carry out Utility asset works on Malmaynes Hall Road, Stoke, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 10:30.

Trooli logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Grain Road

Trooli were proposing to carry out Utility asset works on Grain Road, Lower Stoke, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 10:31.

Trooli logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Grain Road

Trooli were proposing to carry out Utility asset works on Grain Road, Middle Stoke, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Trooli on 13 Sep 2024 at 10:31.

Essex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Highway improvement works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 16:27.

Network Rail logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Chatham Hill

Network Rail are proposing to carry out Works for Rail Purposes on Chatham Hill, Luton, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 10:32.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Highway improvement works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 10:02.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Furtherwick Road

Essex County Council are proposing to carry out Highway improvement works on Furtherwick Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 12:34.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Eastern Esplanade

Essex County Council are proposing to carry out Highway improvement works on Eastern Esplanade, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 09:51.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Eastern Esplanade

Essex County Council are proposing to carry out Highway improvement works on Eastern Esplanade, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 12:34.

Southern Water logo
Between
30 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 1 Nov 2024 at 14:26.

Southern Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Oct 2024 at 09:59.

Southern Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 24 Oct 2024 at 11:25.

UK Power Networks South Eastern logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Bunters Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:55.

UK Power Networks South Eastern logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Bunters Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 11:10.

UK Power Networks South Eastern logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Bunters Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 14:33.

Southern Gas Networks logo
Between
20 and 30 Jan 2025
Details
View Map
Share
Follow
Junction Road

Southern Gas Networks are proposing to carry out New service connection on Junction Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:37.

Southern Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Richmond Road

Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:35.

Southern Water logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 22 Oct 2024 at 16:20.

Southern Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Richmond Road

Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Oct 2024 at 10:51.

Southern Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gore Green Road

Southern Water are proposing to carry out Utility repair and maintenance works on Gore Green Road, Higham, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:45.

Southern Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bells Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bells Lane, Hoo St Werburgh, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 1 Nov 2024 at 10:04.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Camden Road

Southern Water were proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:19.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Camden Road

Southern Water are proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:49.

UK Power Networks South Eastern logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Berber Road

UK Power Networks South Eastern were proposing to carry out New service connection on Berber Road, Strood, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 13:09.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Mill Road

Southern Water are proposing to carry out Utility repair and maintenance works on Mill Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Nov 2024 at 09:24.

UK Power Networks South Eastern logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Cuxton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 09:53.

UK Power Networks South Eastern logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Cuxton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:49.

Southern Gas Networks logo
Between
13 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:40.

Southern Gas Networks logo
Between
13 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:55.

BT logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Bill Street Road

BT were proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:18.

BT logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bill Street Road

BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Nov 2024 at 12:20.

BT logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bill Street Road

BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Nov 2024 at 10:45.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Railway Street

Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 19 Sep 2024 at 14:46.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 11:46.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Jeffery Street

Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 09:24.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
King Arthurs Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 11:33.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
King Arthurs Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 19:10.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
King Arthurs Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:49.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Richmond Road

Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:53.

UK Power Networks South Eastern logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Magpie Hall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Magpie Hall Road, Chatham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 12:14.

Southern Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Richmond Road

Southern Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 14:16.


Roadworks Map near to Gypsy Way, ROCHESTER, ME3 8DX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 05:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Gypsy Way, ROCHESTER, ME3 8DX (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
THE STREET, MEDWAY 
(0.2 miles)
BT
Utility asset works - Verge - Road closure
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
2
BT logo
MAJOR
  
THE STREET, MEDWAY 
(0.2 miles)
BT
Utility asset works - Verge - Road closure
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
3
BT logo
MAJOR
  
THE STREET, MEDWAY 
(0.2 miles)
BT
Utility asset works - Verge - Road closure
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
4
Cityfibre Metro Networks logo
DUX COURT ROAD, HOO ST WERBURGH 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.2
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.