ROADWORKS SUMMARY
Boxley Road, MAIDSTONE, ME14 2HN
Introduction
View current and future planned roadworks and road closures for Boxley Road, ME14 2HN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Boxley Road, MAIDSTONE, ME14 2HN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Boxley Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Dec 2024
Kent County Council are carrying out Highway improvement works on Cranborne Avenue, Maidstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2022 at 09:05 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 2 Sep 2024 at 13:25.
2 Jan 2023 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on New Cut Road, Maidstone.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2023 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 20 Mar 2024 at 13:11.
2 Jan 2023 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Newnham Court Way, Weavering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2023 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 20 Mar 2024 at 13:12.
2 Jan 2023 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on A249 Newnham Court Roundabout Entry Southbound To A249 M20 Interchange Roundabout Exit Southbound, Boxley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2023 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 20 Mar 2024 at 13:11.
2 Jan 2023 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Bearsted Road, Maidstone.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2023 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 28 Feb 2024 at 15:45.
2 Jan 2023 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Newnham Court Roundabout To M20 Junction 7 Roundabout, Boxley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2023 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 20 Mar 2024 at 13:11.
2 Jan 2024 and 30 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Bearsted Road, Weavering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 28 Feb 2024 at 12:52.
20 Dec 2024
Kent County Council are carrying out Highway improvement works on London Road, Aylesford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:33 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 12 Feb 2024 at 11:43.
20 Dec 2024
Kent County Council are carrying out Highway improvement works on Coldharbour Lane, Aylesford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:33 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 12 Feb 2024 at 11:43.
20 Dec 2024
Kent County Council are carrying out Highway improvement works on Coldharbour Lane, Aylesford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:33 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 12 Feb 2024 at 11:43.
Monday
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jul 2024 at 16:13.
Monday
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2024 at 10:48.
Monday
UK Power Networks South Eastern were proposing to carry out New service connection on City Way, Rochester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 2 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2024 at 14:20.
16 Sep and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 15:00.
20 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 15:24.
Sunday
Kent County Council are carrying out Highway improvement works on Teston Lane, Teston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 07:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 1 Oct 2024 at 10:24.
21 Oct and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 6 Sep 2024 at 12:00.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on The Street, Bredhurst.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 23:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:41.
11 Nov 2024 and 13 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Stockett Lane, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 29 Oct 2024 at 08:43.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Whitehouse Crescent, Burham, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 16:40 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 07:08.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Rochester Road, Burham, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 16:40 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 07:09.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Kemsley Street Road, Bredhurst.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 12:15 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 10:15.
Today
Kent County Council are proposing to carry out Highway improvement works on Spot Lane, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 1 Oct 2024 at 10:33.
Friday
Kent County Council are carrying out Highway improvement works on Spot Lane, Bearsted.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:35 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 27 Nov 2024 at 15:14.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Weavering Street, Weavering.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 23:39 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:21.
Friday
Trooli were proposing to carry out Utility asset works on Lower Road, East Farleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Trooli on 5 Nov 2024 at 14:35.
25 Nov and 12 Dec 2024
South East Water are proposing to carry out Utility asset works on Church Road, Otham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 25 Oct 2024 at 14:05.
12 Dec 2024
South East Water are carrying out Utility asset works on Church Road, Otham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:00 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 25 Nov 2024 at 10:29.
Friday
South East Water are proposing to carry out Utility repair and maintenance works on Upper Fant Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 21 Aug 2024 at 11:17.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Loose Road, Maidstone.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:42.
26 Nov and 20 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Bellingham Way, Panattoni Park, Aylesford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 08:34.
5 and 23 Dec 2024
Electricity Network Company were proposing to carry out Utility asset works on Rede Wood Road, Barming.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 16:11.
9 and 11 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Atkins Hill, Boughton Monchelsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 23 Sep 2024 at 08:21.
9 and 17 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Peel Street, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 08:07.
12 Dec 2024 and 6 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Tudor Avenue, Maidstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Sep 2024 at 09:19.
12 Dec 2024 and 6 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Norman Close, Maidstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Sep 2024 at 09:19.
16 and 20 Dec 2024
South East Water are proposing to carry out New service connection on Stockett Lane, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 19 Sep 2024 at 08:42.
17 and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Buckland Lane, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 07:19.
2 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fauchons Lane, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:25.
2 Jan and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weavering Street, Weavering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 11:45.
2 Jan and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weavering Street, Weavering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 15:40.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gighill Road, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:16.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:28.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:18.
6 and 10 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ewell Lane, West Farleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Oct 2024 at 06:50.
6 and 10 Jan 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Ewell Lane, West Farleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 12:34.
6 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Palace Avenue, Maidstone.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 10:55.
6 and 29 Jan 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Palace Avenue, Maidstone.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Nov 2024 at 10:41.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fauchons Lane, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 06:57.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fauchons Lane, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 13:42.
6 Jan and 28 Mar 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Blacklands, East Malling, West Malling.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 10:45.
6 Jan and 28 Mar 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Blacklands, East Malling, West Malling.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 13:09.
7 and 11 Jan 2025
National Highways are proposing to carry out Works for road purposes on Matts Hill Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Oct 2024 at 13:21.
8 and 10 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Buckland Lane, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Sep 2024 at 07:35.
8 and 14 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Buckland Lane, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:19.
11 and 13 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Stockett Lane, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 29 Oct 2024 at 14:29.
13 and 24 Jan 2025
Trooli are proposing to carry out Utility asset works on Lower Road, East Farleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Trooli on 7 Nov 2024 at 16:14.
13 and 17 Jan 2025
South East Water are proposing to carry out New service connection on Stockett Lane, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 23 Sep 2024 at 12:41.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:42.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on A229 J3 Interchange A2045 Link, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
14 and 18 Jan 2025
South East Water are proposing to carry out New service connection on Stockett Lane, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 14:36.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Bluebell Hill Slip Link Bridge, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
20 Jan and 16 Feb 2025
Kent County Council are proposing to carry out Section 50 on Bicknor Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 26 Nov 2024 at 13:31.
20 Jan and 15 Feb 2025
Kent County Council are proposing to carry out Section 50 on Bicknor Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 26 Nov 2024 at 13:31.
20 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Merton Road, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Oct 2024 at 14:13.
20 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Merton Road, Bearsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Oct 2024 at 15:26.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gighill Road, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:59.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:59.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:15.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:12.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on The Street, Bredhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Nov 2024 at 06:33.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Nov 2024 at 17:18.
21 and 23 Jan 2025
South East Water are proposing to carry out New service connection on Vanity Lane, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 1 Nov 2024 at 07:31.
25 Jan and 14 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Farleigh Hill, Tovil.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 14:55.
27 Jan and 28 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Luddenham Close, Maidstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Nov 2024 at 14:57.
27 Jan and 28 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Bargrove Road, Maidstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Nov 2024 at 14:56.
27 Jan and 28 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Newenden Close, Maidstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Nov 2024 at 14:56.
27 Jan and 14 Feb 2025
National Highways were proposing to carry out Highway repair and maintenance works on Forstal Road, Sandling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 10:00.
27 Jan and 14 Feb 2025
National Highways are proposing to carry out Highway repair and maintenance works on Forstal Road, Sandling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Oct 2024 at 10:25.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:18.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 07:05.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:32.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.
3 Feb and 25 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 12:34.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 12:05.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 13:40.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 14:53.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:56.
17 and 20 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bower Mount Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 14:52.
17 Feb and 12 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandling Lane, Penenden Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 14:06.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on New Hythe Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 10:08.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on New Hythe Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:52.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Courtenay Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 11:18.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Courtenay Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 13:21.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Tovil Road, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 11:18.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Tovil Road, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 13:21.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Tovil Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 11:18.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Tovil Road, Maidstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 13:21.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Eccleston Road, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 11:18.
20 and 22 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Eccleston Road, Tovil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 13:21.
24 Feb and 1 Mar 2025
National Highways are proposing to carry out Works for road purposes on Thurnham Lane, Thurnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:44.
Roadworks Map near to Boxley Road, MAIDSTONE, ME14 2HN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Boxley Road, MAIDSTONE, ME14 2HN (19 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 4 Dec 2024)
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
(Scheduled: 15 Oct 2024 - 30 Mar 2026)
(Scheduled: 27 Nov 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.