ROADWORKS SUMMARY
Trevale Road, ROCHESTER, ME1 3NZ
Introduction
View current and future planned roadworks and road closures for Trevale Road, ME1 3NZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Trevale Road, ROCHESTER, ME1 3NZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Trevale Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Jun 2026
Southern Water are carrying out Utility repair and maintenance works on Maidstone Road, Chatham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2023 at 08:40 and could run through until 25 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 26 Jun 2023 at 07:53.
12 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Toronto Road, Gillingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 09:15 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:54.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 15:00.
Friday
UK Power Networks South Eastern are carrying out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 15:24.
Tomorrow
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 6 Sep 2024 at 12:00.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on St Williams Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Jun 2024 at 08:19.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:49.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:01.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Toronto Road, Gillingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 08:55.
Friday
UK Power Networks South Eastern were proposing to carry out New service connection on Bellingham Way, Panattoni Park, Aylesford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 08:34.
2 Dec 2024 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jul 2024 at 16:57.
2 Dec 2024 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:21.
3 Dec 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:39.
Tomorrow
Southern Gas Networks were proposing to carry out Disconnection or alteration of supply on Star Mill Lane, Darland, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:39.
30 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Horsted Way, Horsted, Rochester.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 17:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:48.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Canterbury Street, Gillingham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 15:45 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 16:14.
Sunday
Southern Water are carrying out Utility repair and maintenance works on Archbishops Crescent, Gillingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 12:17 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Dec 2024 at 14:16.
Friday
Southern Water are carrying out Utility repair and maintenance works on Lower Rainham Road, Rainham, Gillingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 December 2024 at 07:38 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Dec 2024 at 10:17.
Friday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Morement Road, Hoo St Werburgh, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 December 2024 at 18:40 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 08:38.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 10:45 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 09:00.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hempstead Road, Hempstead, Gillingham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 10:15 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 10:59.
Friday
Southern Water were proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 9 Sep 2024 at 09:38.
Friday
Southern Water were proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Sep 2024 at 16:17.
Today
Network Rail are proposing to carry out Works for Rail Purposes on Chatham Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 10:32.
Today
Network Rail are proposing to carry out Works for Rail Purposes on Chatham Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 15:10.
Monday
Southern Water are carrying out Utility repair and maintenance works on Broadview Avenue, Rainham, Gillingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 12:52 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 17 Dec 2024 at 15:17.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Strood, Rochester.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 07:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 08:36.
30 Dec 2024 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 1 Nov 2024 at 14:26.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gighill Road, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:16.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:28.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:18.
6 and 29 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Bellingham Way, Panattoni Park, Aylesford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 10 Dec 2024 at 08:56.
6 and 10 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Maidstone Road, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Oct 2024 at 11:30.
6 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 23 Oct 2024 at 09:59.
6 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 24 Oct 2024 at 11:25.
6 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Oak Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Aug 2024 at 10:04.
6 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Oak Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Aug 2024 at 15:25.
6 and 11 Jan 2025
National Highways are proposing to carry out Highway repair and maintenance works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Dec 2024 at 11:21.
6 and 10 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Telegraph Hill, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 Oct 2024 at 15:40.
6 and 10 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Telegraph Hill, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 9 Dec 2024 at 12:34.
7 and 11 Jan 2025
National Highways are proposing to carry out Works for road purposes on Matts Hill Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Oct 2024 at 13:21.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:42.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on A229 J3 Interchange A2045 Link, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
13 Jan and 13 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:37.
13 Jan and 13 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 09:52.
13 and 17 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Sep 2024 at 08:33.
13 and 15 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Nov 2024 at 10:26.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:55.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 11:10.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 14:33.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 3 Oct 2024 at 13:21.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Nov 2024 at 15:04.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 3 Oct 2024 at 13:21.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Nov 2024 at 15:04.
15 and 17 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Dec 2024 at 10:53.
15 and 17 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Dec 2024 at 10:53.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Bluebell Hill Slip Link Bridge, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gighill Road, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:59.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gighill Road, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:13.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:59.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:15.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:12.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on The Street, Bredhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Nov 2024 at 06:33.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Nov 2024 at 17:18.
20 and 24 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 11:54.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 10 Oct 2024 at 09:04.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 12:49.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Warden Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 28 Oct 2024 at 14:21.
20 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Junction Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:37.
20 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Junction Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:14.
20 Jan and 24 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Oct 2024 at 16:20.
20 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Oct 2024 at 10:51.
20 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:35.
27 Jan and 14 Feb 2025
National Highways were proposing to carry out Highway repair and maintenance works on Forstal Road, Sandling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 10:00.
27 Jan and 14 Feb 2025
National Highways are proposing to carry out Highway repair and maintenance works on Forstal Road, Sandling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Oct 2024 at 10:25.
27 Jan and 14 Feb 2025
National Highways are proposing to carry out Diversionary works on Pratling Street, Aylesford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Dec 2024 at 13:01.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:18.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 07:05.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:32.
27 and 31 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 26 Sep 2024 at 15:23.
27 Jan and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 31 Oct 2024 at 14:22.
27 Jan and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 15:39.
27 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:47.
27 Jan and 2 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:46.
27 Jan and 2 Feb 2025
Southern Gas Networks were proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 2 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:50.
27 and 29 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Gore Green Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:45.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.
3 Feb and 25 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 12:34.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 12:05.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 13:40.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 14:53.
3 and 5 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Chatham Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Dec 2024 at 14:27.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Mill Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 09:24.
3 and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:19.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:49.
3 and 21 Feb 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Berber Road, Strood, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 13:09.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:56.
10 and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Swallow Rise, Princes Park, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 14:59.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Oct 2024 at 12:11.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Oct 2024 at 14:20.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 08:46.
10 Feb and 5 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 09:53.
10 Feb and 5 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:49.
10 and 12 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:23.
13 Feb and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:55.
13 Feb and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:40.
15 and 23 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Nov 2024 at 10:45.
15 and 23 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Nov 2024 at 12:20.
15 and 23 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Nov 2024 at 15:18.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on New Hythe Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 10:08.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on New Hythe Lane, Larkfield, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:52.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Sep 2024 at 13:15.
17 Feb and 21 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Onslow Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Magpie Hall Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 12:14.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Delce Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Nov 2024 at 14:27.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 09:24.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 11:46.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 29 Nov 2024 at 11:45.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 2 Dec 2024 at 10:39.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Sep 2024 at 14:46.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on The Street, Cobham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Sep 2024 at 12:47.
17 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:53.
17 and 28 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 14:16.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 19:10.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 11:33.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:49.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 26 Nov 2024 at 10:32.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Remedial works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 27 Nov 2024 at 09:54.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Remedial works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 4 Dec 2024 at 13:46.
18 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on King Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:42.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 Feb and 21 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:38.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:37.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
24 Feb and 14 Mar 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Jeffery Street, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Pipelines on 12 Nov 2024 at 06:22.
24 and 28 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Arden Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Nov 2024 at 11:53.
24 and 28 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on The Street, Cobham, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 16 Sep 2024 at 14:15.
24 and 28 Feb 2025
Kent County Council are proposing to carry out Remedial works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 4 Dec 2024 at 11:19.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 08:59.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 12:06.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 10:39.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:43.
3 and 20 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Magpie Hall Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 10:08.
3 and 8 Mar 2025
Medway Council are proposing to carry out Utility asset works on Medway Tunnel, Chatham Maritime, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 6 Feb 2024 at 10:53.
4 and 7 Mar 2025
Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 17 Jan 2024 at 11:10.
5 and 13 Mar 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Teasel Road, Weeds Wood, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 5 Dec 2024 at 10:12.
10 Mar and 24 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 16:05.
10 and 14 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:25.
10 and 19 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Dec 2024 at 14:48.
10 and 14 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Delce Road, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Nov 2024 at 13:14.
12 and 14 Mar 2025
South East Water are proposing to carry out New service connection on Pilgrims Way, Aylesford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 12 Dec 2024 at 13:57.
17 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Spekes Road, Hempstead, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Dec 2024 at 11:59.
17 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 9 Dec 2024 at 10:45.
17 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Water on 9 Dec 2024 at 12:24.
17 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Century Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Water on 10 Dec 2024 at 11:04.
17 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Edinburgh Road, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 10 Dec 2024 at 08:22.
Roadworks Map near to Trevale Road, ROCHESTER, ME1 3NZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Trevale Road, ROCHESTER, ME1 3NZ (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Nov 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.