ROADWORKS SUMMARY
The Street, FAVERSHAM, ME13 9BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Street, ME13 9BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Street, FAVERSHAM, ME13 9BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Until
30 Jul 2027
Details
View Map
Share
Follow
Staple Street Road

Kent County Council are carrying out Works for road purposes on Staple Street Road, Graveney.

These works are categorised as Major.

The works started on 10 July 2023 at 07:00 and could run through until 30 July 2027. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Jul 2023 at 12:14.

Kent County Council logo
LONG TERM
Between
23 Oct 2024 and 25 Jan 2025
Details
View Map
Share
Follow
The Crescent

Kent County Council are proposing to carry out Highway improvement works on The Crescent, Chartham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Staplestreet Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplestreet Road, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:52.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Dawes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dawes Road, Dunkirk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Maidstone Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Chilham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:21.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Chilham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:23.

Southern Gas Networks logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Staple Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Staple Street, Hernhill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 16:45 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:50.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Road

Kent County Council are proposing to carry out Highway improvement works on Canterbury Road, Chilham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 14 Nov 2024 at 15:21.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Road

Kent County Council are carrying out Highway improvement works on Canterbury Road, Chilham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 28 Nov 2024 at 13:23.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Staple Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staple Street, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 17:56.

National Highways logo
LONG TERM
Between
26 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Vicarage Lane

National Highways are proposing to carry out Works for road purposes on Vicarage Lane, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Nov 2024 at 13:35.

National Highways logo
LONG TERM
Between
26 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Vicarage Lane

National Highways are proposing to carry out Works for road purposes on Vicarage Lane, Ospringe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Nov 2024 at 13:24.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bigbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bigbury Road, Chartham Hatch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 10:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 09:59.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bagham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bagham Lane, Chilham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 15:33.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Tanners Street

Kent County Council are carrying out Highway improvement works on Tanners Street, Faversham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:34 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Dec 2024 at 09:38.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Tanners Street

Kent County Council are proposing to carry out Highway improvement works on Tanners Street, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Oct 2024 at 14:08.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Homestall Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Homestall Lane, Graveney.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Mar 2025
Details
View Map
Share
Whitstable Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Mar 2025
Details
View Map
Share
Graveney Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:57.

National Highways logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Brogdale Road

National Highways are proposing to carry out Works for road purposes on Brogdale Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 21 May 2024 at 15:50.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bagham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bagham Road, Chilham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:29.

Kent County Council logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
William Street

Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:34.

National Highways logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Water Lane

National Highways are proposing to carry out Works for road purposes on Water Lane, Ospringe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Oct 2024 at 15:33.

Kent County Council logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
William Street

Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bagham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bagham Road, Chilham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:29.

UK Power Networks South Eastern logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Church Lane, Seasalter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Sep 2024 at 13:49.

UK Power Networks South Eastern logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Church Lane, Seasalter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 10:09.

Nexfibre Networks Limited logo
Between
10 and 15 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Lane, Harbledown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 15 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 15:11.

Nexfibre Networks Limited logo
Between
10 and 15 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Lane, Harbledown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 15 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 10:50.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Whitstable Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 16:15.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Whitstable Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:36.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Homestall Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homestall Lane, Graveney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:35.

Kent County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Highstreet Road

Kent County Council are proposing to carry out Section 50 on Highstreet Road, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 3 Oct 2024 at 07:27.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Graveney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:36.

Kent County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Kit Hill

Kent County Council are proposing to carry out Highway repair and maintenance works on Kit Hill, Selling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 17:18.

Kent County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Kit Hill

Kent County Council are proposing to carry out Highway repair and maintenance works on Kit Hill, Selling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Nov 2024 at 09:15.

National Highways logo
Between
16 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Brogdale Road

National Highways are proposing to carry out Works for road purposes on Brogdale Road, Ospringe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 21 May 2024 at 15:50.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Graveney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:57.

Kent County Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Giles Lane

Kent County Council are proposing to carry out Section 50 on Giles Lane, Canterbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Dec 2024 at 10:58.

Kent County Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Giles Lane

Kent County Council are proposing to carry out Section 50 on Giles Lane, Canterbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Dec 2024 at 11:59.

Kent County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
William Street

Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:35.

Kent County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
William Street

Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 8 Nov 2024 at 17:51.

UK Power Networks South Eastern logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Faversham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Faversham Road, Seasalter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 13:03.

UK Power Networks South Eastern logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Lucerne Drive

UK Power Networks South Eastern are proposing to carry out New service connection on Lucerne Drive, Seasalter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 11:50.

Kent County Council logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
St Johns Road

Kent County Council are proposing to carry out Highway improvement works on St Johns Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.

Kent County Council logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
St Johns Road

Kent County Council are proposing to carry out Highway improvement works on St Johns Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:35.

UK Power Networks South Eastern logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Faversham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Faversham Road, Seasalter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 11:49.

UK Power Networks South Eastern logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Lucerne Drive

UK Power Networks South Eastern are proposing to carry out New service connection on Lucerne Drive, Seasalter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 13:03.

Kent County Council logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Giles Lane

Kent County Council are proposing to carry out Section 50 on Giles Lane, Canterbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 7 Oct 2024 at 14:06.

Kent County Council logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Giles Lane

Kent County Council are proposing to carry out Section 50 on Giles Lane, Canterbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 7 Oct 2024 at 14:46.

South East Water logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Ashford Road

South East Water are proposing to carry out Utility repair and maintenance works on Ashford Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Apr 2024 at 18:01.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Church Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Hill, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 16:57.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Kays Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kays Lane, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 16:56.

Kent County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
St Marys Road

Kent County Council are proposing to carry out Highway improvement works on St Marys Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.

Kent County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
St Marys Road

Kent County Council are proposing to carry out Highway improvement works on St Marys Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:36.

BT logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Colegates Close

BT are proposing to carry out Utility asset works on Colegates Close, Oare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 17:12.

National Highways logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Brogdale Road

National Highways are proposing to carry out Works for road purposes on Brogdale Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 30 Oct 2024 at 10:45.

Southern Gas Networks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fostall

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fostall, Hernhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 16:57.

National Highways logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Brogdale Road

National Highways are proposing to carry out Works for road purposes on Brogdale Road, Ospringe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 30 Oct 2024 at 10:45.

South East Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Thruxted Lane

South East Water are proposing to carry out New service connection on Thruxted Lane, Chartham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 27 Nov 2024 at 12:55.

National Highways logo
Between
3 and 15 Mar 2025
Details
View Map
Share
London Road

National Highways were proposing to carry out Highway repair and maintenance works on London Road, Boughton Under Blean.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2024 at 09:57.

South East Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Long Hill

South East Water are proposing to carry out Utility repair and maintenance works on Long Hill, Chilham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Dec 2024 at 13:04.

South East Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Long Hill

South East Water are proposing to carry out Utility repair and maintenance works on Long Hill, Chilham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 9 Dec 2024 at 16:45.

National Highways logo
Between
3 and 15 Mar 2025
Details
View Map
Share
Follow
Brenley Lane

National Highways are proposing to carry out Highway repair and maintenance works on Brenley Lane, Boughton Under Blean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Nov 2024 at 15:35.

Kent County Council logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Newton Road

Kent County Council are proposing to carry out Highway improvement works on Newton Road, Faversham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 28 Nov 2024 at 17:38.

Kent County Council logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Newton Road

Kent County Council are proposing to carry out Highway improvement works on Newton Road, Faversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:08.

Kent County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Clapham Hill

Kent County Council are proposing to carry out Highway improvement works on Clapham Hill, Whitstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Dec 2024 at 09:06.

Kent County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Whitstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Dec 2024 at 09:05.

Kent County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Thanet Way Slip Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way Slip Way, Whitstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Dec 2024 at 09:06.


Roadworks Map near to The Street, FAVERSHAM, ME13 9BG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Street, FAVERSHAM, ME13 9BG (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
STAPLESTREET ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 4 Nov 2024 - 24 Dec 2024
0.4
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
STAPLESTREET ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Complete
11 Nov 2024 09:00 - 13 Dec 2024 14:00
0.4
Details
Share
3
Southern Gas Networks logo
MAJOR
  
DAWES ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 4 Nov 2024 - 24 Dec 2024
0.5
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
DAWES ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Complete
11 Nov 2024 09:00 - 22 Nov 2024 11:30
0.5
Details
Share
5
Southern Gas Networks logo
MAJOR
  
STAPLE STREET 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 25 Nov 2024 - 24 Dec 2024
0.5
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
STAPLE STREET 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 28 Nov 2024 16:45
(Scheduled: 25 Nov 2024 - 31 Dec 2024)
0.5
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
DUNKIRK ROAD NORTH 
(0.5 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 28 Oct 2024 08:00
(Scheduled: 25 Oct 2024 - 24 Dec 2024)
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.