View current and future planned roadworks and road closures for Monmouth Road, LU5 6NE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Monmouth Road, DUNSTABLE, LU5 6NE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Monmouth Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Central Bedfordshire Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Sundon Road

Central Bedfordshire Council are carrying out Highway improvement works on Sundon Road, Harlington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2023 at 09:30 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 17 Dec 2024 at 15:28.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Manor Way

Cadent Gas are proposing to carry out Utility asset works on Manor Way, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:05.

Cadent Gas logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Manor Way

Cadent Gas are carrying out Utility asset works on Manor Way, Flitwick.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 11:47 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:50.

Central Bedfordshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
C100 From Froxfield To Tyrells End

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 21 Oct 2024 at 10:28.

Central Bedfordshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
C100 From Froxfield To Tyrells End

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 8 Oct 2024 at 07:03.

Central Bedfordshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
C100 From Froxfield To Tyrells End

Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on C100 From Froxfield To Tyrells End, Eversholt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 4 Oct 2024 at 12:04.

Central Bedfordshire Council logo
LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Follow
Toddington Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Toddington Road, Harlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 20 Dec 2024 at 12:47.

Cityfibre Metro Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Whitehorse Vale

Cityfibre Metro Networks are proposing to carry out Utility asset works on Whitehorse Vale, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 10:37.

Central Bedfordshire Council logo
Between
7 and 28 Jan 2025
Details
View Map
Share
Follow
Clarkes Way

Central Bedfordshire Council are proposing to carry out Highway improvement works on Clarkes Way, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 4 Nov 2024 at 17:24.

Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Harlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harlington Road, Toddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Aug 2024 at 16:01.

Central Bedfordshire Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Pulloxhill Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Pulloxhill Road, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Central Bedfordshire Council on 21 Oct 2024 at 10:29.

Central Bedfordshire Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Pulloxhill Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Pulloxhill Road, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Central Bedfordshire Council on 9 Oct 2024 at 09:28.

Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Harlington Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Harlington Road, Toddington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Dec 2024 at 08:44.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Campion Way

Cadent Gas are proposing to carry out Utility asset works on Campion Way, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:03.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Campion Way

Cadent Gas are proposing to carry out Utility asset works on Campion Way, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 12:49.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Clover Road

Cadent Gas are proposing to carry out Utility asset works on Clover Road, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:02.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Clover Road

Cadent Gas are proposing to carry out Utility asset works on Clover Road, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 12:48.

Central Bedfordshire Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Tithe Farm Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Tithe Farm Road, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 10 Oct 2024 at 11:57.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Station Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Station Road, Flitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Dec 2024 at 15:32.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Station Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Station Road, Flitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Sep 2024 at 11:10.

Luton Borough Council logo
Between
23 Jan and 8 Feb 2025
Details
View Map
Share
Sherborne Avenue

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Sherborne Avenue, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Oct 2024 at 15:34.

Central Bedfordshire Council logo
LONG TERM
Between
25 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Steppingley Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Steppingley Road, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 28 Oct 2024 at 15:15.

Luton Borough Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wentworth Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wentworth Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 14 Oct 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bluebell Close Footway

Cadent Gas are proposing to carry out Utility asset works on Bluebell Close Footway, Flitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:22.

Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Toddington Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Toddington Road, Harlington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Dec 2024 at 08:45.

Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Toddington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Toddington Road, Harlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 14:54.

BT logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Arthur Street

BT are proposing to carry out Utility asset works on Arthur Street, Ampthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Nov 2024 at 13:28.

BT logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Arthur Street

BT are proposing to carry out Utility asset works on Arthur Street, Ampthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Nov 2024 at 16:16.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Woburn Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Woburn Street, Ampthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 11:38.

Central Bedfordshire Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Greenfield Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Greenfield Road, Westoning.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 3 Dec 2024 at 10:18.

Central Bedfordshire Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Flitwick Road

Central Bedfordshire Council are proposing to carry out Section 50 on Flitwick Road, Westoning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 4 Dec 2024 at 11:35.

Central Bedfordshire Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Flitwick Road

Central Bedfordshire Council are proposing to carry out Section 50 on Flitwick Road, Westoning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 4 Dec 2024 at 12:00.

Central Bedfordshire Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Greenfield Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Greenfield Road, Westoning.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 16:03.

Cadent Gas logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Icknield Way

Cadent Gas are proposing to carry out Utility asset works on Icknield Way, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 10:17.

Luton Borough Council logo
Between
11 and 15 Feb 2025
Details
View Map
Share
Follow
Dewsbury Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Luton Borough Council on 12 Dec 2024 at 08:04.

Luton Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Stanmore Crescent

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Stanmore Crescent, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 10 Dec 2024 at 14:49.

Central Bedfordshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Bedford Road, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 26 Sep 2024 at 12:29.

Central Bedfordshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Bedford Road, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 25 Sep 2024 at 11:05.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Woburn Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Woburn Street, Ampthill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 11:19.

Luton Borough Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Marsh Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Marsh Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 10 Dec 2024 at 15:04.

Central Bedfordshire Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Steppingley Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Steppingley Road, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 15 Nov 2024 at 10:58.

Central Bedfordshire Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Steppingley Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Steppingley Road, Flitwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Central Bedfordshire Council on 3 Dec 2024 at 15:36.

Luton Borough Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Bishopscote Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Bishopscote Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Luton Borough Council on 1 Dec 2024 at 07:54.

Anglian Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Water End Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Water End Road, Maulden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 11:39.

Luton Borough Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Marsh Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Marsh Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 16 Dec 2024 at 10:25.

Central Bedfordshire Council logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Manor Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Manor Road, Barton-le-clay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 23 Dec 2024 at 12:21.

Affinity Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Bedford Road

Affinity Water are proposing to carry out Utility asset works on Bedford Road, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 16 Dec 2024 at 10:54.

Luton Borough Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Ashwell Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Ashwell Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 18 Dec 2024 at 14:55.

Central Bedfordshire Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Higham Road

Central Bedfordshire Council are proposing to carry out Section 50 on Higham Road, Higham Gobion.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Central Bedfordshire Council on 18 Dec 2024 at 16:37.


Roadworks Map near to Monmouth Road, DUNSTABLE, LU5 6NE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Monmouth Road, DUNSTABLE, LU5 6NE (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Central Bedfordshire Council logo
MAJOR
  
CHURCH ROAD 
(0.2 miles)
Central Bedfordshire Council
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.2
Details
Share
Follow
2
Central Bedfordshire Council logo
MAJOR
  
WESTONING ROAD 
(0.3 miles)
Central Bedfordshire Council
Highway improvement works - Verge - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.3
Details
Share
Follow
3
Central Bedfordshire Council logo
MAJOR
  
STATION ROAD 
(0.3 miles)
Central Bedfordshire Council
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.3
Details
Share
Follow
4
Central Bedfordshire Council logo
MAJOR
  
SUNDON ROAD 
(0.4 miles)
Central Bedfordshire Council
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.4
Details
Share
Follow
5
Central Bedfordshire Council logo
MAJOR
  
SUNDON ROAD 
(0.5 miles)
Central Bedfordshire Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 11 Sep 2023 09:30
(Scheduled: 11 Sep 2023 - 31 Dec 2026)
0.5
Details
Share
Follow
6
Central Bedfordshire Council logo
MAJOR
  
TODDINGTON ROAD 
(0.9 miles)
Central Bedfordshire Council
Highway improvement works - Verge - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.9
Details
Share
Follow
7
Central Bedfordshire Council logo
MAJOR
  
HARLINGTON ROAD 
(0.9 miles)
Central Bedfordshire Council
Highway improvement works - Verge - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
0.9
Details
Share
Follow
8
Central Bedfordshire Council logo
MAJOR
  
HARLINGTON ROAD 
(1.0 miles)
Central Bedfordshire Council
Highway improvement works - Verge - No carriageway incursion
In Progress
Since: 10 Jul 2024 09:00
(Scheduled: 10 Jul 2024 - 31 Dec 2027)
1.0