ROADWORKS SUMMARY
Bark Lane, ILKLEY, LS29 0RB
Introduction
View current and future planned roadworks and road closures for Bark Lane, LS29 0RB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bark Lane, ILKLEY, LS29 0RB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bark Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Little Lane, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:25.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hebers Ghyll Drive, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:24.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Wood Rise, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:53.
1 Aug 2024 and 2 Nov 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rupert Road, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:25.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:26.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Belle Vue, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wells Road, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:29.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Howden Road, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.
1 Aug 2024 and 2 Nov 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Elliott Street, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:24.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bradley Road, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.
11 Nov 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 08:51.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moorfield Road, Ben Rhydding, Ilkley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 16:20.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 13:53.
9 Dec 2024 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 14:52.
6 and 10 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back West View, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 10:58.
6 and 10 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back West View, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Oct 2024 at 10:48.
6 Jan and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Ilkley Road, Addingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 13:16.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 14:54.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moorfield Road, Ben Rhydding, Ilkley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 13:03.
6 Jan and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Ilkley Road, Addingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 08:16.
10 and 14 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hospital Road, Riddlesden, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 11:55.
13 and 24 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2024 at 12:40.
13 and 24 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2024 at 10:27.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Nov 2024 at 09:44.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 11:19.
20 Jan and 14 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 11:18.
25 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 11:22.
27 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:27.
27 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:01.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldway, Ben Rhydding, Ilkley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 15:30.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 13:43.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colbert Avenue, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:05.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colbert Avenue, Ben Rhydding, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:26.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:14.
17 and 28 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:36.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Steeton, Steeton With Eastburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 12:51.
17 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Royd Ings Avenue, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 09:00.
17 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Royd Ings Avenue, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:44.
10 and 12 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 9 Dec 2024 at 13:53.
Roadworks Map near to Bark Lane, ILKLEY, LS29 0RB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bark Lane, ILKLEY, LS29 0RB (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.