ROADWORKS SUMMARY
Low Mill Lane, ILKLEY, LS29 0QP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Low Mill Lane, LS29 0QP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Low Mill Lane, ILKLEY, LS29 0QP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Low Mill Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Hebers Ghyll Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hebers Ghyll Drive, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:24.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Low Wood Rise

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Wood Rise, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:53.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Belle Vue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Belle Vue, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Wells Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wells Road, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:29.

LONG TERM
Between
1 Aug 2024 and 2 Nov 2025
Details
View Map
Share
Follow
Rupert Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rupert Road, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:25.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Bradley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bradley Road, Silsden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.

LONG TERM
Between
1 Aug 2024 and 2 Nov 2025
Details
View Map
Share
Follow
Elliott Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Elliott Street, Silsden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:24.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Howden Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Howden Road, Silsden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Little Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Little Lane, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:25.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Valley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:26.

Northern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Valley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 14:52.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 31 Aug 2025
Details
View Map
Share
Ilkley Road

Yorkshire Water were proposing to carry out Utility asset works on Ilkley Road, Addingham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jan 2025 at 12:52.

Northern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Moorfield Road, Ben Rhydding, Ilkley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 08:30 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 08:36.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wheatley Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 08:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 09:05.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 31 Aug 2025
Details
View Map
Share
Follow
Ilkley Road

Yorkshire Water are proposing to carry out Utility asset works on Ilkley Road, Addingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 13:16.

Until
7 Feb 2025
Details
View Map
Share
Follow
Swartha Lane

City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jan 2025 at 09:08.

Yorkshire Water logo
LONG TERM
Between
20 Jan and 14 Sep 2025
Details
View Map
Share
Follow
Ilkley Road

Yorkshire Water are proposing to carry out Utility asset works on Ilkley Road, Addingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jan 2025 at 14:21.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Wheatley Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 11:18.

Yorkshire Water logo
LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Ilkley Road

Yorkshire Water are carrying out Utility asset works on Ilkley Road, Addingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:30 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 11:19.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Valley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Nov 2024 at 09:44.

Northern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Valley Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Valley Drive, Ben Rhydding, Ilkley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 15:33.

Northern Gas Networks logo
Between
25 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wheatley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wheatley Lane, Ben Rhydding, Ilkley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 11:22.

Northern Gas Networks logo
Until
7 Feb 2025
Details
View Map
Share
Follow
Clock View Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Clock View Street, Keighley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 11:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 10:25.

Northern Gas Networks logo
Until
7 Feb 2025
Details
View Map
Share
Follow
Valley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:48.

Northern Gas Networks logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Valley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:01.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Keighley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Utley, Steeton With Eastburn.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 10:43 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 15:40.

Northern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Alston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 14:55.

Northern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Alston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 09:49.

Northern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Alston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 08:15.

Northern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Alston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 14:55.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Fieldway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldway, Ben Rhydding, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 15:30.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hollingwood Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollingwood Rise, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 15:12.

Northern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Colbert Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colbert Avenue, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:26.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hollingwood Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollingwood Rise, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 14:30.

Northern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Green Head Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 14:23.

Northern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Green Head Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 13:43.

Northern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Green Head Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:14.

Northern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Colbert Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colbert Avenue, Ben Rhydding, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:05.

Northern Gas Networks logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 15:48.

Northern Gas Networks logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 14:05.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fieldway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldway, Ben Rhydding, Ilkley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 11:33.

Northern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 14:56.

Northern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Steeton, Steeton With Eastburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 12:51.

Northern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 14:23.

Northern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Alston Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Alston Road, Stockbridge, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:36.

Northern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Royd Ings Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Royd Ings Avenue, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:44.

Northern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Royd Ings Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Royd Ings Avenue, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 09:00.

LONG TERM
Between
20 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Flasby Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flasby Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 10:23.

LONG TERM
Between
21 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Back Otterburn Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Otterburn Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 10:44.

LONG TERM
Between
21 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Winterburn Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Winterburn Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 10:43.

LONG TERM
Between
21 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Ashleigh Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ashleigh Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 10:46.

LONG TERM
Between
21 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Back Winterburn Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Winterburn Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 10:24.

Northern Gas Networks logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Street Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 15:01.

LONG TERM
Between
25 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Old Bridge Rise

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Old Bridge Rise, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 12:37.

LONG TERM
Between
25 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Stockeld Way

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stockeld Way, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Jan 2025 at 12:33.

Yorkshire Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Green Head Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Dec 2024 at 11:49.

Yorkshire Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Green Head Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 09:32.

Between
16 and 23 Mar 2025
Details
View Map
Share
Follow
Elliott Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Elliott Street, Silsden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Jan 2025 at 11:38.

Northern Gas Networks logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Street Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 10:45.

Northern Gas Networks logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Street Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 09:14.

Northern Gas Networks logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Street Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 08:41.


Roadworks Map near to Low Mill Lane, ILKLEY, LS29 0QP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Jan 2025 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Low Mill Lane, ILKLEY, LS29 0QP (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
MAJOR
  
ILKLEY ROAD 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Two-way signals
Planned
Scheduled: 6 Jan 2025 - 31 Aug 2025
0.2
Details
Share
Follow
2
Yorkshire Water logo
MAJOR
  
ILKLEY ROAD 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Two-way signals
Cancelled
(Scheduled: 6 Jan 2025 - 31 Aug 2025)
0.2
Details
Share
3
Yorkshire Water logo
MAJOR
  
ILKLEY ROAD 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Two-way signals
Planned
Scheduled: 20 Jan 2025 - 14 Sep 2025
0.2
Details
Share
Follow
4
Yorkshire Water logo
MAJOR
  
ILKLEY ROAD 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Two-way signals
In Progress
Since: 20 Jan 2025 09:30
(Scheduled: 20 Jan 2025 - 14 Sep 2025)
0.2
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.