ROADWORKS SUMMARY
Albion Street, LEEDS, LS27 9BX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Albion Street, LS27 9BX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Albion Street, LEEDS, LS27 9BX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Albion Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 14 Sep 2026 at 11:30.

Leeds City Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Templar Place

Leeds City Council are carrying out Highway improvement works on Templar Place, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2025 at 07:00 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 6 Nov 2025 at 11:41.

Leeds City Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Templar Lane

Leeds City Council are carrying out Highway improvement works on Templar Lane, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2025 at 07:00 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 6 Nov 2025 at 11:40.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Eastgate

Leeds City Council are proposing to carry out Highway improvement works on Eastgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Lady Lane

Leeds City Council are proposing to carry out Highway improvement works on Lady Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway improvement works on Bridge Street, Sheepscar, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:40.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Templar Street

Leeds City Council are proposing to carry out Highway improvement works on Templar Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Bridge End

Leeds City Council are carrying out Highway improvement works on Bridge End, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:48.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are carrying out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 12:01.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Briggate

Leeds City Council are carrying out Highway improvement works on Briggate, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:48.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are carrying out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:47.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are carrying out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:58.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:40.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:38.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:50.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are carrying out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:57.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Marsh Lane

Leeds City Council are proposing to carry out Highway improvement works on Marsh Lane, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:07.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
New York Road

Leeds City Council are proposing to carry out Highway improvement works on New York Road, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 9 Sep 2025 at 15:51.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:07.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Albion Street

Leeds City Council are carrying out Highway improvement works on Albion Street, Leeds.

These works are categorised as Major.

The works started on 12 January 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Jan 2026 at 08:56.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Rigton Approach

Leeds City Council are proposing to carry out Highway improvement works on Rigton Approach, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:06.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Burmantofts Street

Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 2 Sep 2025 at 10:52.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Naseby View

Leeds City Council are proposing to carry out Highway improvement works on Naseby View, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:05.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are carrying out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Jan 2026 at 12:51.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are carrying out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 Jan 2026 at 07:25.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Oxford Row

Leeds City Council are carrying out Highway improvement works on Oxford Row, Leeds.

These works are categorised as Major.

The works started on 12 January 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Jan 2026 at 12:43.

Yorkshire Water logo
LONG TERM
Until
26 Mar 2027
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are carrying out Utility asset works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2026 at 06:00 and could run through until 26 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2026 at 12:01.

Network Rail logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out Works for Rail Purposes on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 20:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2026 at 10:33.

LONG TERM
Until
30 Apr 2027
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are carrying out Highway improvement works on Bradford Road, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 09:30 and could run through until 30 April 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Kirklees Council on 1 Jul 2026 at 14:41.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Staincliffe Hall Road

Kirklees Council are carrying out Highway repair and maintenance works on Staincliffe Hall Road, Staincliffe, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 10:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 11:32.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Deighton Lane

Kirklees Council are carrying out Highway repair and maintenance works on Deighton Lane, Healey, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 10:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 11:31.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Cross Bank Road

Kirklees Council are carrying out Highway repair and maintenance works on Cross Bank Road, Carlinghow, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 09:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 09:36.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
30 Nov 2027
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are carrying out Highway improvement works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2026 at 18:00 and could run through until 30 November 2027. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Jun 2026 at 11:19.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are carrying out Highway improvement works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2026 at 18:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 May 2026 at 12:31.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are carrying out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 May 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 1 Sep 2026 at 14:37.

Leeds City Council logo
LONG TERM
Between
11 May 2026 and 1 Sep 2027
Details
View Map
Share
Follow
Woodhouse Lane

Leeds City Council are proposing to carry out Highway improvement works on Woodhouse Lane, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2026 and could run through until 1 September 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 14 Apr 2026 at 15:12.

Network Rail logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Pepper Road

Network Rail are carrying out Works for Rail Purposes on Pepper Road, Hunslet, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2026 at 07:00 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2026 at 08:27.

LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are carrying out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 09:36.

LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Listing Lane

Kirklees Council are carrying out Highway improvement works on Listing Lane, Littletown, Liversedge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 June 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 27 Jul 2026 at 08:14.

Yorkshire Water logo
LONG TERM
Until
26 May 2027
Details
View Map
Share
Follow
Canal Road

Yorkshire Water are carrying out Utility asset works on Canal Road, Armley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2026 at 09:10 and could run through until 26 May 2027. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 May 2026 at 11:06.

Leeds City Council logo
LONG TERM
Between
15 Jun 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Blenheim Walk

Leeds City Council are proposing to carry out Highway improvement works on Blenheim Walk, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 10 Jun 2026 at 15:49.

Leeds City Council logo
LONG TERM
Between
23 Jun 2026 and 28 Feb 2027
Details
View Map
Share
Follow
Clarendon Road

Leeds City Council are proposing to carry out Highway improvement works on Clarendon Road, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2026 and could run through until 28 February 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Jun 2026 at 08:51.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Market Place

Kirklees Council are carrying out Highway improvement works on Market Place, Dewsbury.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2026 at 09:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 1 Sep 2026 at 15:05.

Northern Gas Networks logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Huddersfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Huddersfield Road, Liversedge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2026 at 09:12.

Leeds City Council logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Valley Road

Leeds City Council are carrying out Remedial works on Valley Road, Pudsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 08:30 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Jul 2026 at 08:45.

Leeds City Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Concordia Street

Leeds City Council are proposing to carry out Highway improvement works on Concordia Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 28 May 2026 at 13:27.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Halifax Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Halifax Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2026 at 12:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Sep 2026 at 14:14.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Albion Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Albion Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2026 at 12:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 11:45.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Bath Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bath Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2026 at 10:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 11:51.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Victoria Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Victoria Road, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2026 at 12:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 11:44.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Hirst Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Hirst Road, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2026 at 10:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 11:47.

Northern Gas Networks logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Gomersal, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2026 at 13:59 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jul 2026 at 13:59.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Willans Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Willans Road, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 12:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 11:46.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Commercial Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 12:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Aug 2026 at 07:35.

National Highways logo
LONG TERM
Until
3 Oct 2026
Details
View Map
Share
Follow
Wakefield Road

National Highways are carrying out Highway improvement works on Wakefield Road, Gildersome, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 20:30 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Aug 2026 at 07:52.

Leeds City Council logo
LONG TERM
Between
3 Aug and 14 Nov 2026
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 14 November 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 Aug 2026 at 15:35.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Woodhouse Lane

Leeds City Council are proposing to carry out Highway improvement works on Woodhouse Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:26.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Albion Street

Leeds City Council are proposing to carry out Highway improvement works on Albion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:51.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Wormald Row

Leeds City Council are proposing to carry out Highway improvement works on Wormald Row, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:51.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:51.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:50.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Rossington Street

Leeds City Council are proposing to carry out Highway improvement works on Rossington Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:50.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Vernon Street

Leeds City Council are proposing to carry out Highway improvement works on Vernon Street, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:49.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Clay Pit Lane

Leeds City Council are proposing to carry out Highway improvement works on Clay Pit Lane, Sheepscar, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:48.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Cookridge Street

Leeds City Council are proposing to carry out Highway improvement works on Cookridge Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:47.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Merrion Way

Leeds City Council are proposing to carry out Highway improvement works on Merrion Way, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:47.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Portland Crescent

Leeds City Council are proposing to carry out Highway improvement works on Portland Crescent, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:46.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Queen Square

Leeds City Council are proposing to carry out Highway improvement works on Queen Square, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:46.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Queen Square Court

Leeds City Council are proposing to carry out Highway improvement works on Queen Square Court, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:44.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Portland Way

Leeds City Council are proposing to carry out Highway improvement works on Portland Way, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:43.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Lodge Street

Leeds City Council are proposing to carry out Highway improvement works on Lodge Street, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:42.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Blackman Lane

Leeds City Council are proposing to carry out Highway improvement works on Blackman Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:41.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
New Woodhouse Lane

Leeds City Council are proposing to carry out Highway improvement works on New Woodhouse Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:42.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Back Blenheim Terrace

Leeds City Council are proposing to carry out Highway improvement works on Back Blenheim Terrace, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:41.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Marlborough Gardens

Leeds City Council are proposing to carry out Highway improvement works on Marlborough Gardens, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:37.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
St Marks Road

Leeds City Council are proposing to carry out Highway improvement works on St Marks Road, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:37.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Blenheim View

Leeds City Council are proposing to carry out Highway improvement works on Blenheim View, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:32.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
St Marks Street

Leeds City Council are proposing to carry out Highway improvement works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:36.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Spenceley Street

Leeds City Council are proposing to carry out Highway improvement works on Spenceley Street, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:35.

Leeds City Council logo
LONG TERM
Between
3 Aug 2026 and 26 Nov 2027
Details
View Map
Share
Follow
Clarendon Road

Leeds City Council are proposing to carry out Highway improvement works on Clarendon Road, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Jun 2026 at 10:34.

Northern Gas Networks logo
LONG TERM
Between
7 Aug and 22 Oct 2026
Details
View Map
Share
Kirkstall Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Kirkstall Lane, Kirkstall, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2026 and run through until 22 October 2026. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 25 Aug 2026 at 11:11.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
High Street

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on High Street, Ossett.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 09:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 9 Sep 2026 at 10:22.

Northern Gas Networks logo
LONG TERM
Between
17 Aug and 23 Oct 2026
Details
View Map
Share
Lawns Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 August 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2026 at 16:30.

Yorkshire Water logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are carrying out Utility repair and maintenance works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:30 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2026 at 10:15.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford Road, Drighlington, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:56.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Bradford And Wakefield Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford And Wakefield Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:59.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Westgate Hill Street

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Westgate Hill Street, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Sep 2026 at 14:55.

Leeds City Council logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Cross Lane

Leeds City Council are carrying out Highway repair and maintenance works on Cross Lane, Upper Wortley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:30 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 1 Sep 2026 at 09:31.

LONG TERM
Until
22 Jan 2027
Details
View Map
Share
Follow
Grange Road

Kirklees Council are carrying out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:00 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 1 Sep 2026 at 10:01.

LONG TERM
Until
22 Jan 2027
Details
View Map
Share
Follow
Cul De Sac Off Grange Road Opposite Technology Centre

Kirklees Council are carrying out roadworks on Cul De Sac Off Grange Road Opposite Technology Centre, Soothill, Batley.

These works are categorised as Major.

The works started on 1 September 2026 at 09:00 and could run through until 22 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 1 Sep 2026 at 10:02.

LONG TERM
Until
22 Jan 2027
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are carrying out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:00 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 1 Sep 2026 at 10:04.

Finishing
Tuesday
Details
View Map
Share
Follow
Hunsworth Lane

Kirklees Council are proposing to carry out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 13:20.

Finishing
Tuesday
Details
View Map
Share
Follow
Hunsworth Lane

Kirklees Council are carrying out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 09:29.

Northern Powergrid (Yorkshire) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pontefract Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:30 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2026 at 08:05.

Yorkshire Water logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Pepper Road

Yorkshire Water are carrying out Utility asset works on Pepper Road, Hunslet, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 08:33.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Pontefract Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:29 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2026 at 08:36.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Hyde Park Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Hyde Park Road, Hyde Park, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 16:10.

LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Longcauseway

Kirklees Council are carrying out Highway repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 11:44.

Finishing
Sunday
Details
View Map
Share
Follow
Battye Street

Kirklees Council are carrying out Highway repair and maintenance works on Battye Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Sep 2026 at 09:44.

Finishing
Sunday
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are carrying out Highway repair and maintenance works on Alfred Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Sep 2026 at 09:45.

Finishing
Sunday
Details
View Map
Share
Follow
Ings Road

Kirklees Council are carrying out Highway repair and maintenance works on Ings Road, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Sep 2026 at 09:47.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Leeds Road

Leeds City Council were proposing to carry out Highway improvement works on Leeds Road, Lofthouse, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 26 March 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 8 Sep 2026 at 08:21.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Longthorpe Lane

Leeds City Council were proposing to carry out Highway improvement works on Longthorpe Lane, Lofthouse, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 26 March 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 8 Sep 2026 at 09:03.

Northern Gas Networks logo
LONG TERM
Until
8 Oct 2026
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 11:00 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:16.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are proposing to carry out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 14 Jan 2026 at 10:26.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are proposing to carry out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 26 Jan 2026 at 15:58.

Northern Powergrid (Yorkshire) logo
Until
4 Oct 2026
Details
View Map
Share
Follow
Low Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Low Road, Hunslet, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 13:30 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 14:31.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Kellett Lane

Leeds City Council are proposing to carry out Highway improvement works on Kellett Lane, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 27 Aug 2026 at 12:16.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Ryedale Holt

Leeds City Council are proposing to carry out Highway improvement works on Ryedale Holt, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 25 Aug 2026 at 14:40.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Ryedale Avenue

Leeds City Council are proposing to carry out Highway improvement works on Ryedale Avenue, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 26 Aug 2026 at 09:18.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Midland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Midland Road, Hunslet, Leeds.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 11:35 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 14:18.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hunslet Hall Road

Yorkshire Water are carrying out Utility repair and maintenance works on Hunslet Hall Road, Beeston, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 17:55 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 12:38.

LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are carrying out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:00 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 14 Sep 2026 at 10:39.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Bradford Road, Littletown, Liversedge.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 13:44 and could run through until 18 September 2026. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 14:42.

City Of Wakefield Metropolitan District Council logo
Between
14 and 23 Sep 2026
Details
View Map
Share
Follow
Brunel Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on Brunel Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 3 Aug 2026 at 12:44.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Jul 2026 at 09:52.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Jul 2026 at 09:40.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Rawfolds, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Jul 2026 at 09:41.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Rooms Lane

Northern Powergrid (Yorkshire) are carrying out New service connection on Rooms Lane, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 09:12.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 07:49.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 10:58.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 08:30.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Canal Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Canal Street, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 Jun 2026 at 14:04.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Armley Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Armley Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 Jun 2026 at 14:05.

BT logo
Finishing
Today
Details
View Map
Share
Harrison Street

BT were proposing to carry out Utility asset works on Harrison Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Aug 2026 at 10:11.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Vinery Road

Northern Powergrid (Yorkshire) are carrying out New service connection on Vinery Road, Burley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:45 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 08:50.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
St Hildas Road

Yorkshire Water are carrying out Utility repair and maintenance works on St Hildas Road, Cross Green, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 07:30 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 09:39.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
St Hildas Place

Yorkshire Water were proposing to carry out Utility repair and maintenance works on St Hildas Place, Cross Green, Leeds.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 12:20.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Sweet Street West

Yorkshire Water are carrying out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 07:29 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 13:57.

City Of Wakefield Metropolitan District Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dale Street

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on Dale Street, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Sep 2026 at 10:03.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
York Road

Yorkshire Water were proposing to carry out Permanent reinstatement on York Road, Burmantofts, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 21 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 13:58.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Stanningley Bypass

Leeds City Council were proposing to carry out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 14:49.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 20:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 15:58.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Mount Street

Yorkshire Water are proposing to carry out Utility asset works on Mount Street, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 11:49.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Crosby Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Crosby Terrace, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Jun 2026 at 12:21.

Northern Gas Networks logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Nineveh Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Nineveh Road, Holbeck, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 10:26.

Yorkshire Water logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Cross Green Lane

Yorkshire Water were proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:52.

Northern Gas Networks logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Easy Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Easy Road, Cross Green, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 May 2026 at 15:06.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Vinery Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Vinery Road, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 16:40.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Vinery Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Vinery Road, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2026 at 12:56.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Vinery Road

Yorkshire Water were proposing to carry out New service connection on Vinery Road, Burley, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:35.

Yorkshire Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Wharf Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wharf Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Jul 2026 at 08:53.

Northern Powergrid (Yorkshire) logo
Between
24 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Low Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Low Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 May 2026 at 15:16.

City Of Wakefield Metropolitan District Council logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Crownlands Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Crownlands Lane, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 21 Aug 2026 at 08:28.

City Of Wakefield Metropolitan District Council logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Crownlands Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Crownlands Lane, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 21 Aug 2026 at 08:36.

Northern Gas Networks logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Moorlands Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moorlands Avenue, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2026 at 13:56.

Northern Gas Networks logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Moorlands Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moorlands Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2026 at 14:44.

Northern Gas Networks logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Lea Road

Northern Gas Networks are proposing to carry out New service connection on Lea Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Jul 2026 at 10:46.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Cambridge Road

Yorkshire Water are proposing to carry out New service connection on Cambridge Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 11:49.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Cambridge Road

Yorkshire Water are proposing to carry out New service connection on Cambridge Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 13:07.

Northern Powergrid (Yorkshire) logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Greenroyd Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Greenroyd Avenue, Hunsworth, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2026 at 15:30.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Millshaw

Leeds City Council are proposing to carry out Highway repair and maintenance works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Jun 2026 at 16:01.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Ring Road Beeston

Leeds City Council are proposing to carry out Highway repair and maintenance works on Ring Road Beeston, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Jun 2026 at 16:02.

Network Rail logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Neville Street

Network Rail were proposing to carry out Works for Rail Purposes on Neville Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 1 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Aug 2026 at 15:15.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bath Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Aug 2026 at 09:39.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bath Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Aug 2026 at 11:53.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Adwalton Green

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Adwalton Green, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:17.

Yorkshire Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Wormald Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2026 at 11:59.

Northern Gas Networks logo
LONG TERM
Between
1 Oct 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Ashworth Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashworth Road, Eightlands, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 5 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Jul 2026 at 09:23.

Northern Gas Networks logo
Between
1 and 23 Oct 2026
Details
View Map
Share
Follow
Willans Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Willans Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Jul 2026 at 08:52.

Northern Gas Networks logo
Between
1 and 23 Oct 2026
Details
View Map
Share
Follow
St Michaels Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2026 at 14:21.

Leeds City Council logo
Between
2 and 17 Oct 2026
Details
View Map
Share
Bruce Gardens

Leeds City Council were proposing to carry out Highway repair and maintenance works on Bruce Gardens, New Wortley, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 17 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Sep 2026 at 10:05.

Leeds City Council logo
Between
2 and 17 Oct 2026
Details
View Map
Share
Follow
Bruce Gardens

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bruce Gardens, New Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 9 Sep 2026 at 11:39.

Leeds City Council logo
Between
2 and 17 Oct 2026
Details
View Map
Share
Follow
Bruce Gardens

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bruce Gardens, New Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Sep 2026 at 11:02.

Leeds City Council logo
Between
3 Oct and 2 Nov 2026
Details
View Map
Share
Ingram Road Distributor

Leeds City Council were proposing to carry out Highway improvement works on Ingram Road Distributor, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Aug 2026 at 09:34.

Leeds City Council logo
Between
3 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ingram Road Distributor

Leeds City Council are proposing to carry out Highway improvement works on Ingram Road Distributor, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Sep 2026 at 11:53.

Leeds City Council logo
Between
3 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ingram Road Distributor

Leeds City Council are proposing to carry out Highway improvement works on Ingram Road Distributor, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 14 Sep 2026 at 12:27.

City Of Wakefield Metropolitan District Council logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Park Mill Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Park Mill Lane, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 24 Jul 2026 at 10:21.

City Of Wakefield Metropolitan District Council logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Park Mill Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Park Mill Lane, Flushdyke, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 24 Jul 2026 at 10:23.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Lime Tree Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lime Tree Avenue, Staincliffe, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Jun 2026 at 11:32.

City Of Wakefield Metropolitan District Council logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 29 Jul 2026 at 14:34.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Rectory Drive

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Rectory Drive, Birstall, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:07.

Northern Powergrid (Yorkshire) logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Meadowgate Vale

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Meadowgate Vale, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 09:50.

Leeds City Council logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Roker Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Roker Lane, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Jul 2026 at 11:26.

Leeds City Council logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
St Hildas Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Hildas Avenue, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Aug 2026 at 09:50.

Leeds City Council logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Jun 2026 at 15:33.

Leeds City Council logo
Between
5 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 Jul 2026 at 10:25.

Northern Powergrid (Yorkshire) logo
Between
6 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pontefract Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2026 at 12:07.

Northern Powergrid (Yorkshire) logo
Between
6 and 12 Oct 2026
Details
View Map
Share
Follow
Lodge Hill Walk

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lodge Hill Walk, New Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:25.

Northern Powergrid (Yorkshire) logo
Between
7 and 13 Oct 2026
Details
View Map
Share
Follow
Back Nunnington View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Nunnington View, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2026 at 14:11.

Northern Powergrid (Yorkshire) logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Ravenshouse Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Ravenshouse Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 May 2026 at 15:30.

Yorkshire Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Brunswick Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brunswick Street, Westborough, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 14:07.

Yorkshire Water logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Back Cross Green Crescent

Yorkshire Water are proposing to carry out Utility asset works on Back Cross Green Crescent, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2026 at 08:10.

Yorkshire Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are proposing to carry out Utility asset works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 09:09.

Yorkshire Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are proposing to carry out Utility asset works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 13:33.

Northern Powergrid (Yorkshire) logo
Between
13 and 21 Oct 2026
Details
View Map
Share
Follow
Vicarage Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Vicarage Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:39.

Northern Gas Networks logo
Between
14 and 28 Oct 2026
Details
View Map
Share
Follow
Newport View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newport View, Headingley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Jul 2026 at 12:27.

LONG TERM
Between
19 Oct 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 11:55.

Northern Gas Networks logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Access To 1-19 Foundry Street/1-11 Broadway House

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To 1-19 Foundry Street/1-11 Broadway House, Dewsbury.

These works are categorised as Major.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2026 at 09:06.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Transvaal Terrace

Yorkshire Water are proposing to carry out New service connection on Transvaal Terrace, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 11:09.

Leeds City Council logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Sharp Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Sharp Lane, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Jul 2026 at 10:22.

Leeds City Council logo
Between
19 and 26 Oct 2026
Details
View Map
Share
Follow
Old Run Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Old Run Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 13:37.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Trent Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Trent Street, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 2 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:54.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Trent Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Trent Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:55.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Marshall Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Marshall Street, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 2 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:56.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marshall Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marshall Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:56.

Northern Gas Networks logo
Between
22 Oct and 6 Nov 2026
Details
View Map
Share
Follow
St Michaels Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Aug 2026 at 12:09.

Northern Gas Networks logo
Between
22 Oct and 6 Nov 2026
Details
View Map
Share
Follow
St Michaels Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2026 at 16:28.

Northern Gas Networks logo
Between
22 Oct and 6 Nov 2026
Details
View Map
Share
Follow
St Michaels Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Sep 2026 at 12:43.

Northern Powergrid (Yorkshire) logo
Between
23 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Ravenshouse Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Ravenshouse Road, Scout Hill, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Aug 2026 at 07:43.

City Of Wakefield Metropolitan District Council logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
High Street

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on High Street, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Sep 2026 at 10:55.

Yorkshire Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wharf Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wharf Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2026 at 14:23.

Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Balmfield Crescent

Kirklees Council are proposing to carry out Highway repair and maintenance works on Balmfield Crescent, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2026 at 11:21.

Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Balmfield

Kirklees Council are proposing to carry out Highway repair and maintenance works on Balmfield, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2026 at 11:14.

City Of Wakefield Metropolitan District Council logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Baker Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on Baker Lane, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Sep 2026 at 11:51.

Leeds City Council logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Ring Road Lower Wortley

Leeds City Council are proposing to carry out Highway repair and maintenance works on Ring Road Lower Wortley, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 13:15.

Leeds City Council logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Whitehall Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 09:09.

Yorkshire Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Amberley Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Aug 2026 at 14:15.

Yorkshire Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Amberley Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 10:17.

Northern Gas Networks logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:52.

Northern Gas Networks logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 09:03.

Yorkshire Water logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Anroyd Street

Yorkshire Water are proposing to carry out New service connection on Anroyd Street, Westborough, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2026 at 15:33.

Northern Powergrid (Yorkshire) logo
Between
27 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Norwood Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Norwood Avenue, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2026 at 14:06.

Northern Powergrid (Yorkshire) logo
Between
28 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Fairfield Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fairfield Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2026 at 08:12.

Yorkshire Water logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Horsfall Street

Yorkshire Water are proposing to carry out Remedial works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 09:36.

Yorkshire Water logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Horsfall Street

Yorkshire Water are proposing to carry out Remedial works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
1 Nov 2026 and 2 Feb 2027
Details
View Map
Share
Follow
Snowden Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowden Crescent, Bramley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 2 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Mar 2026 at 12:28.

LONG TERM
Between
2 Nov 2026 and 19 Feb 2027
Details
View Map
Share
Follow
Link Road

Kirklees Council are proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 19 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 13:08.

Yorkshire Water logo
LONG TERM
Between
2 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Lane

Yorkshire Water are proposing to carry out Utility asset works on School Lane, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2026 at 12:02.

Yorkshire Water logo
LONG TERM
Between
2 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Lane

Yorkshire Water are proposing to carry out Utility asset works on School Lane, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:47.

Yorkshire Water logo
LONG TERM
Between
2 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Lane

Yorkshire Water are proposing to carry out Utility asset works on School Lane, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:26.

Yorkshire Water logo
LONG TERM
Between
2 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Lane

Yorkshire Water are proposing to carry out Utility asset works on School Lane, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:25.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2026 at 12:03.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:45.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:19.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:09.

Leeds City Council logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Town Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Town Street, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Jul 2026 at 10:21.

Leeds City Council logo
Between
2 and 27 Nov 2026
Details
View Map
Share
Follow
Mill Hill

Leeds City Council are proposing to carry out Highway improvement works on Mill Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 14 Sep 2026 at 10:49.

Leeds City Council logo
Between
2 and 27 Nov 2026
Details
View Map
Share
Follow
Boar Lane

Leeds City Council are proposing to carry out Highway improvement works on Boar Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 14 Sep 2026 at 10:38.

Northern Powergrid (Yorkshire) logo
Between
3 and 11 Nov 2026
Details
View Map
Share
Follow
Harefield Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Harefield Drive, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jul 2026 at 15:34.

Northern Powergrid (Yorkshire) logo
Between
4 and 10 Nov 2026
Details
View Map
Share
Follow
Back Springfield Mount

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Springfield Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 14:43.

Northern Gas Networks logo
Between
5 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Stratford Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratford Street, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 15:09.

Network Rail logo
LONG TERM
Between
9 Nov and 21 Dec 2026
Details
View Map
Share
Follow
George Street

Network Rail are proposing to carry out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Aug 2026 at 13:20.

Leeds City Council logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Valley Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Valley Road, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Aug 2026 at 14:40.

Leeds City Council logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Ebor Place

Leeds City Council are proposing to carry out Highway repair and maintenance works on Ebor Place, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Aug 2026 at 14:26.

Northern Gas Networks logo
Between
10 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Lawns Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.

Northern Gas Networks logo
Between
11 and 26 Nov 2026
Details
View Map
Share
Follow
Lawns Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 15 Dec 2026
Details
View Map
Share
Follow
Whitehall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:45.

Northern Powergrid (Yorkshire) logo
Between
11 and 17 Nov 2026
Details
View Map
Share
Follow
Kent Crescent

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Kent Crescent, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jul 2026 at 11:13.

Northern Powergrid (Yorkshire) logo
Between
12 and 18 Nov 2026
Details
View Map
Share
Follow
Gerard Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Gerard Avenue, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 12:11.

Northern Gas Networks logo
Between
12 and 23 Nov 2026
Details
View Map
Share
Follow
Westbourne Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbourne Place, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 15:08.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:15.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:22.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:11.

Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Rouse Mill Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 4 Sep 2026 at 12:50.

Leeds City Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Hessle Mount

Leeds City Council are proposing to carry out Highway repair and maintenance works on Hessle Mount, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Aug 2026 at 12:56.

Northern Powergrid (Yorkshire) logo
Between
17 and 24 Nov 2026
Details
View Map
Share
Follow
Armley Grange View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Armley Grange View, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 14:10.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:16.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:23.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:14.

Yorkshire Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Corporation Street

Yorkshire Water are proposing to carry out New service connection on Corporation Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 12:02.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Chinewood Avenue

Yorkshire Water are proposing to carry out Utility asset works on Chinewood Avenue, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 11:58.

Yorkshire Water logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
York Grove

Yorkshire Water are proposing to carry out Utility asset works on York Grove, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:10.

Yorkshire Water logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
York Grove

Yorkshire Water are proposing to carry out Utility asset works on York Grove, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:29.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 5 Jan 2027
Details
View Map
Share
Follow
York Road

Yorkshire Water are proposing to carry out Utility asset works on York Road, Upper Batley, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 5 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 07:26.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 5 Jan 2027
Details
View Map
Share
Follow
York Road

Yorkshire Water are proposing to carry out Utility asset works on York Road, Upper Batley, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 5 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:30.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 7 Apr 2027
Details
View Map
Share
Follow
Woodlands Road

Yorkshire Water are proposing to carry out Utility asset works on Woodlands Road, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 7 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:12.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 8 Jan 2027
Details
View Map
Share
Follow
Moat Hill

Yorkshire Water are proposing to carry out Utility asset works on Moat Hill, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:40.

Yorkshire Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Gillroyd Parade

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Gillroyd Parade, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 11:07.

Leeds City Council logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Brooklyn Terrace

Leeds City Council are proposing to carry out Highway repair and maintenance works on Brooklyn Terrace, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 16:01.

Network Rail logo
LONG TERM
Between
1 Dec 2026 and 2 Apr 2027
Details
View Map
Share
Follow
Fall Lane

Network Rail are proposing to carry out roadworks on Fall Lane, Scout Hill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 2 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2026 at 09:32.

Network Rail logo
LONG TERM
Between
1 Dec 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Thornhill Road

Network Rail are proposing to carry out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2026 at 09:31.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Crescent

Yorkshire Water are proposing to carry out Utility asset works on School Crescent, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 07:59.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 15 Jan 2027
Details
View Map
Share
Follow
School Crescent

Yorkshire Water are proposing to carry out Utility asset works on School Crescent, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:31.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Ashfield Road

Yorkshire Water are proposing to carry out Utility asset works on Ashfield Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:42.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 5 Feb 2027
Details
View Map
Share
Larch Close

Yorkshire Water were proposing to carry out Utility asset works on Larch Close, Birstall, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2026 and run through until 5 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 13:19.

Yorkshire Water logo
LONG TERM
Between
7 Dec 2026 and 7 Jan 2027
Details
View Map
Share
Follow
Sunny Bank Road

Yorkshire Water are proposing to carry out Utility asset works on Sunny Bank Road, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:48.

Yorkshire Water logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
York Drive

Yorkshire Water are proposing to carry out Utility asset works on York Drive, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 12:03.

Leeds City Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Claremont Place

Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Place, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:47.

Leeds City Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Pudsey Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Sep 2026 at 12:39.

Leeds City Council logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Brudenell Mount

Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Mount, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Aug 2026 at 13:57.

Northern Powergrid (Yorkshire) logo
Between
9 and 15 Dec 2026
Details
View Map
Share
Follow
Hollins Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollins Avenue, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 11:22.

Yorkshire Water logo
LONG TERM
Between
9 Dec 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Lamplands

Yorkshire Water are proposing to carry out Utility asset works on Lamplands, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 5 February 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:57.

Northern Gas Networks logo
LONG TERM
Between
14 Dec 2026 and 13 Jan 2027
Details
View Map
Share
Follow
Ashworth Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashworth Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Jul 2026 at 09:50.

Northern Powergrid (Yorkshire) logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Sherwood Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sherwood Avenue, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 09:38.

Leeds City Council logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Claremont Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Street, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:51.


Roadworks Map near to Albion Street, LEEDS, LS27 9BX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 05:30
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Albion Street, LEEDS, LS27 9BX (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
QUEEN STREET 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 14 Sep 2026 14:00
(Scheduled: 14 Sep 2026 - 18 Sep 2026)
0.3
Details
Share
Follow
2
Northern Gas Networks logo
EMERGENCY
  
HIGH STREET 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Complete
7 Sep 2026 13:17 - 15 Sep 2026 10:53
0.4
Details
Share
3
Yorkshire Water logo
URGENT
  
FOUNTAIN STREET 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
13 Sep 2026 09:23 - 16:36
0.4
Details
Share
4
Quickline Commucations logo
BRIDGE STREET 
(0.7 miles)
Quickline Commucations
Utility asset works - Footway - Two-way signals
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.7
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
MAJOR
  
ROOMS LANE 
(0.7 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Road closure
In Progress
Since: 14 Sep 2026 09:00
(Scheduled: 14 Sep 2026 - 18 Sep 2026)
0.7
Details
Share
Follow
6
BT logo
ROOMS FOLD 
(0.7 miles)
BT
New service connection - Footway, Carriageway - Give and take
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.7
Details
Share
Follow
7
Virgin Media logo
HARROP AVENUE 
(0.7 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
15 Sep 2026 13:02 - 13:31
0.7
Details
Share
8
Virgin Media logo
REIN ROAD, TINGLEY 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Verge - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.8
Details
Share
Follow
9
Cityfibre Metro Networks logo
BRUNTCLIFFE LANE 
(0.8 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 14 Sep 2026 13:27
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.8
Details
Share
Follow
10
Cityfibre Metro Networks logo
HOWDEN CLOUGH ROAD 
(0.8 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 15 Sep 2026 14:02
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.8
Details
Share
Follow