ROADWORKS SUMMARY
Lewisham View, LEEDS, LS27 8FD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lewisham View, LS27 8FD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lewisham View, LEEDS, LS27 8FD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lewisham View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley To Spring Valley Crescent

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.

Network Rail logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.

LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 3 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 1 Sep 2025 at 09:35.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Link Road

Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Aldams Road

Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Aldams Road

Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Wilton Street

Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Longcauseway

Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
South Street

Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Railway Street

Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Railway Street

Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Battye Street

Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Battye Street

Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Dewsbury Ring Road

Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Alfred Street

Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Ings Road

Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Ings Road

Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Commercial Road

Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Commercial Road

Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Victoria Road

Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Victoria Road

Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Carlton Road

Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Carlton Road

Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Road

Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Road

Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Town Street

Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Town Street

Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Jack Lane

Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Jack Lane

Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Howard Street

Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Howard Street

Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rink Street

Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rink Street

Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mount Street

Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mount Street

Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grafton Street

Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grafton Street

Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Kirkgate

Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.

Leeds City Council logo
LONG TERM
Between
7 Jan and 12 Dec 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 12:59.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Low Moorside Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Gainsborough Fields

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

LONG TERM
Between
30 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Longcauseway

Kirklees Council are proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 9 Apr 2025 at 07:46.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Longcauseway

Kirklees Council are carrying out Highway improvement works on Longcauseway, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 09:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:55.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:55.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:53.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Mayman Lane

Kirklees Council are proposing to carry out Highway improvement works on Mayman Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:29.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Wellington Street

Kirklees Council are proposing to carry out Highway improvement works on Wellington Street, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:27.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway improvement works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:25.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Station Lane

Kirklees Council are proposing to carry out Highway improvement works on Station Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:19.

Leeds City Council logo
LONG TERM
Between
16 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:32.

Leeds City Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are carrying out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 06:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Jun 2025 at 09:16.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 13:20.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 26 Jun 2026
Details
View Map
Share
Ring Road Beeston

Leeds City Council were proposing to carry out Highway improvement works on Ring Road Beeston, Beeston, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 26 June 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 26 Jun 2025 at 10:40.

LONG TERM
Between
7 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul and 10 Oct 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Jul 2025 at 07:47.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Jul 2025 at 07:57.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Follow
Upper Carr Street

Kirklees Council are proposing to carry out Highway improvement works on Upper Carr Street, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Follow
Garden Avenue

Kirklees Council are proposing to carry out Highway improvement works on Garden Avenue, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Landscove Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Heysham Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.

Northern Powergrid (Yorkshire) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Park Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2025 at 09:15 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jul 2025 at 09:53.

National Highways logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are carrying out Highway repair and maintenance works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 19:00 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Jul 2025 at 14:29.

Northern Powergrid (Yorkshire) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Jun 2025 at 10:05.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:56.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Topcliffe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Topcliffe Lane, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:59.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Whitley Spring Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Spring Crescent, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 14:07.

Network Rail logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
George Street

Network Rail are proposing to carry out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 23 Apr 2025 at 13:25.

Network Rail logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Jack Lane

Network Rail are proposing to carry out Works for Rail Purposes on Jack Lane, Hanging Heaton, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 09:50.

Network Rail logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Jack Lane

Network Rail are carrying out Works for Rail Purposes on Jack Lane, Hanging Heaton, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 07:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Aug 2025 at 09:06.

Northern Gas Networks logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Robin Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Robin Lane, Pudsey.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 14:45.

Northern Gas Networks logo
LONG TERM
Between
8 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:52.

Yorkshire Water logo
LONG TERM
Between
10 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Kirkgate

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kirkgate, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2025 at 09:46.

Yorkshire Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Kirkgate

Yorkshire Water are carrying out Utility repair and maintenance works on Kirkgate, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2025 at 15:04 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Aug 2025 at 07:23.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 09:44.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 12:50 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 09:50.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Claremont

Northern Gas Networks are carrying out Utility repair and maintenance works on Claremont, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Upper George Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Upper George Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:45.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Brighton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Cemetery Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cemetery Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:15.

Northern Gas Networks logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Cemetery Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Cemetery Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 08:48.

Northern Gas Networks logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Whitley Spring Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitley Spring Crescent, Ossett.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 15:45.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 10:08.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Bradford Road, Tingley, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 10:00 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 11:04.

LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 10:54.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 14:00.

LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Potovens Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potovens Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:57.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Potovens Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potovens Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:14.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:13.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:55.

Yorkshire Water logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are carrying out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 23:00 and could run through until 30 November 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 09:19.

Yorkshire Water logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are carrying out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 23:00 and could run through until 30 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 09:19.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Dewsbury Road

Leeds City Council are proposing to carry out Highway improvement works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 10 Jul 2025 at 15:38.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Amberley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Aug 2025 at 12:37.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Amberley Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:33 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 09:42.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Marsh Lane

Leeds City Council are proposing to carry out Highway improvement works on Marsh Lane, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:44.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
New York Road

Leeds City Council are proposing to carry out Highway improvement works on New York Road, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 16 May 2025 at 13:56.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:55.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Rigton Approach

Leeds City Council are proposing to carry out Highway improvement works on Rigton Approach, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:46.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Burmantofts Street

Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:47.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Naseby View

Leeds City Council are proposing to carry out Highway improvement works on Naseby View, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:45.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Nippet Lane

Leeds City Council are proposing to carry out Highway improvement works on Nippet Lane, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 11:22.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Accommodation Road

Leeds City Council are proposing to carry out Highway improvement works on Accommodation Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:42.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Lincoln Green Road

Leeds City Council are proposing to carry out Highway improvement works on Lincoln Green Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:44.

Leeds City Council logo
LONG TERM
Between
3 Sep 2025 and 31 Aug 2026
Details
View Map
Share
Follow
Templar Place

Leeds City Council are proposing to carry out Highway improvement works on Templar Place, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 31 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 28 Jul 2025 at 11:36.

Network Rail logo
LONG TERM
Until
4 Nov 2025
Details
View Map
Share
Follow
George Street

Network Rail are carrying out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 07:00 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2025 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 08:51.

Northern Gas Networks logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 09:29.

Northern Gas Networks logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 08:34.

Northern Gas Networks logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Ossett.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Jul 2025 at 14:33.

Northern Gas Networks logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Ossett.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2025 at 10:01.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bowling Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowling Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:43.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Claremont

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:17.

Northern Gas Networks logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Goose Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Goose Hill, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:19.

Northern Gas Networks logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Goose Hill

Northern Gas Networks are carrying out Utility repair and maintenance works on Goose Hill, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 12:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 13:45.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Upper George Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper George Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:17.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Brighton Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:18.

Between
10 and 26 Sep 2025
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Remedial works on Staincliffe Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 10 Sep 2025 at 07:56.

Until
26 Sep 2025
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are carrying out Remedial works on Staincliffe Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Sep 2025 at 09:31.

Northern Powergrid (Yorkshire) logo
Until
27 Sep 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Leeds Road, Littletown, Liversedge.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 08:30 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Sep 2025 at 07:08.

Northern Gas Networks logo
LONG TERM
Between
10 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Castle Ings Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Gardens, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 08:56.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Ossett.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 12:40.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 14:56.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 08:23.

Northern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 15:56.

Northern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 09:44.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Wormald Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Jul 2025 at 11:42.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Wormald Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 06:49.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 08:34.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Westgate

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 08:51.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 08:54.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 14:18.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 08:34.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 14:16.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 10:46.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Brighton Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 14:20.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Brighton Street

Yorkshire Water were proposing to carry out New service connection on Brighton Street, Heckmondwike.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2025 at 11:13.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whitworth Road

Yorkshire Water are carrying out Utility repair and maintenance works on Whitworth Road, Westtown, Dewsbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 11:17 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 11:50.

National Highways logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are carrying out Highway improvement works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 20:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 10:37.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Appleshawn Crescent

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Appleshawn Crescent, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Sep 2025 at 08:00.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Appleshawn Crescent

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Appleshawn Crescent, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Sep 2025 at 08:01.

Northern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Woodhouse Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodhouse Lane, Woodhouse, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 20:19 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2025 at 09:16.

Network Rail logo
Between
19 Sep and 12 Oct 2025
Details
View Map
Share
Follow
George Street

Network Rail are proposing to carry out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 07:39.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 25 Oct 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 08:10.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 25 Oct 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Ossett.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 12:48.

Northern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 15:55.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 11:06.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 11:36.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 08:53.

Yorkshire Water logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Aug 2025 at 14:15.

Yorkshire Water logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 10:54.

Yorkshire Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Trafalgar Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Aug 2025 at 14:37.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Foxdale View

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foxdale View, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Jun 2025 at 15:50.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Foxdale View

Yorkshire Water are proposing to carry out New service connection on Foxdale View, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 Sep 2025 at 10:12.

Leeds City Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out roadworks on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Aug 2025 at 09:43.

Leeds City Council logo
LONG TERM
Between
22 Sep 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leeds City Council on 27 Aug 2025 at 13:30.

Yorkshire Water logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Sweet Street West

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 13:29.

Leeds City Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out roadworks on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Jun 2025 at 09:53.

National Highways logo
Between
25 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are proposing to carry out Highway improvement works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 11:01.

Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Willow Walk

Kirklees Council are proposing to carry out Highway improvement works on Willow Walk, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:27.

Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Frederick Walker Gardens

Kirklees Council are proposing to carry out Highway improvement works on Frederick Walker Gardens, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:27.

Northern Gas Networks logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Longlands Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longlands Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 15:44.

Northern Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Whitley Spring Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Spring Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 14:08.

Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:29.

Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 4 Aug 2025 at 12:45.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 10:55.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 14:19.

Leeds City Council logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Leeds City Council are proposing to carry out Highway improvement works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 18 Sep 2025 at 10:32.

Leeds City Council logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hill Top Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Hill Top Street, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 31 Jul 2025 at 14:32.

Leeds City Council logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Woodhouse Lane

Leeds City Council are proposing to carry out Highway improvement works on Woodhouse Lane, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Sep 2025 at 09:18.

Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Croft Street

Kirklees Council are proposing to carry out Highway improvement works on Croft Street, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:29.

Yorkshire Water logo
Between
1 and 7 Oct 2025
Details
View Map
Share
Burgh Mill Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Burgh Mill Lane, Dewsbury Moor, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:28.

Yorkshire Water logo
Between
1 and 9 Oct 2025
Details
View Map
Share
Swinnow Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Swinnow Lane, Swinnow, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 14:37.

City Of Wakefield Metropolitan District Council logo
Between
2 and 4 Oct 2025
Details
View Map
Share
Follow
Ossett Bypass A638

City Of Wakefield Metropolitan District Council are proposing to carry out Remedial works on Ossett Bypass A638, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Sep 2025 at 15:40.

National Highways logo
Between
3 and 17 Oct 2025
Details
View Map
Share
Follow
Sharp Lane

National Highways are proposing to carry out roadworks on Sharp Lane, Robin Hood, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:54.

Northern Powergrid (Yorkshire) logo
Between
4 and 11 Oct 2025
Details
View Map
Share
Follow
The Oval

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 16:40.

Northern Powergrid (Yorkshire) logo
Between
4 and 11 Oct 2025
Details
View Map
Share
Follow
The Oval

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Aug 2025 at 09:52.

Northern Gas Networks logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Pickersgill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickersgill Street, Ossett.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 08:12.

Northern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bowling Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowling Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 11:00.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Jun 2025 at 10:32.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Jun 2025 at 13:51.

Northern Gas Networks logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bridle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Street, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 14:48.

LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 09:28.

Northern Gas Networks logo
Between
6 and 22 Oct 2025
Details
View Map
Share
Follow
Kirkstall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkstall Lane, Kirkstall, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 16:16.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Britannia Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Britannia Road, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 13:32.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Fountain Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fountain Street, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 11:19.

Leeds City Council logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 19 Jun 2025 at 14:36.

Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 07:51.

Yorkshire Water logo
Between
8 and 17 Oct 2025
Details
View Map
Share
Follow
Sweet Street West

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2025 at 09:51.

Northern Gas Networks logo
Between
10 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Pildacre Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pildacre Lane, Ossett.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:26.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Longlands Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longlands Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 15:33.

Telefonica UK logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Silcoates Lane

Telefonica UK were proposing to carry out Utility asset works on Silcoates Lane, Wrenthorpe, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 16 Sep 2025 at 15:22.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:04.

Northern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jul 2025 at 15:35.

Northern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Glen Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Glen Road, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 10:18.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Oakway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakway, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 13:41.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Virgin Media are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:48.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Virgin Media are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Sep 2025 at 09:24.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Trentham Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Trentham Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:52.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Trentham Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Trentham Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Sep 2025 at 09:31.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Back Stratford Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Back Stratford Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:48.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Back Stratford Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Back Stratford Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 14:14.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Stratford Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Stratford Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:52.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Stratford Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Stratford Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 14:14.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Back Camberley Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Back Camberley Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:51.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Back Camberley Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Back Camberley Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 14:13.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Camberley Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Camberley Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 13:51.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Camberley Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Camberley Street, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2025 at 14:13.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Tong Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2025 at 14:02.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wesley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Wesley Road, Armley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2025 at 13:58.

Leeds City Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Hyde Park Road

Leeds City Council are proposing to carry out Highway improvement works on Hyde Park Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Sep 2025 at 16:00.

Northern Gas Networks logo
LONG TERM
Between
15 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Castle Ings Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Drive, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 13:53.

Northern Gas Networks logo
Between
17 and 31 Oct 2025
Details
View Map
Share
Follow
Armley Grange Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Armley Grange Drive, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:13.

Northern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Ossett Bypass A638

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ossett Bypass A638, Wakefield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 08:09.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 10:49.

Northern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Oaks Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Road, Soothill, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 15:14.

Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 13:18.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility asset works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 14:39.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility asset works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Jun 2025 at 16:15.

Yorkshire Water logo
LONG TERM
Between
20 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jul 2025 at 12:53.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Queen Street

Yorkshire Water are proposing to carry out roadworks on Queen Street, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2025 at 15:50.

Yorkshire Water logo
LONG TERM
Between
20 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 14:53.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 14:25.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tong Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 10:59.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tong Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 14:21.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Wesley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Wesley Road, Armley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 13:09.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Wesley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Wesley Road, Armley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 14:19.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2025 at 20:12.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 12:18.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2025 at 12:27.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lands Lane

Northern Powergrid (Yorkshire) are proposing to carry out Permanent reinstatement on Lands Lane, Leeds.

These works are categorised as Major.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Aug 2025 at 13:09.

Leeds City Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Highway repair and maintenance works on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 16 Jul 2025 at 11:28.

Leeds City Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Highway repair and maintenance works on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 16 Jul 2025 at 11:27.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
21 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Kirkham Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kirkham Avenue, Kirkhamgate, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 12 December 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 10 Sep 2025 at 10:02.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
21 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Kirkham Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kirkham Avenue, Kirkhamgate, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 12 December 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 10 Sep 2025 at 10:03.

Yorkshire Water logo
Between
21 and 27 Oct 2025
Details
View Map
Share
Follow
Back Rochester Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Rochester Terrace, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Jul 2025 at 16:23.

Northern Gas Networks logo
Between
23 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Spen Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2025 at 09:32.

Northern Gas Networks logo
LONG TERM
Between
23 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Ring Road Lower Wortley

Northern Gas Networks are proposing to carry out Utility asset works on Ring Road Lower Wortley, Lower Wortley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 12:01.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Whitley Spring Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Spring Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 15:10.

Telefonica UK logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Silcoates Lane

Telefonica UK were proposing to carry out Utility asset works on Silcoates Lane, Wrenthorpe, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 30 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 17 Sep 2025 at 13:33.

Northern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 16:03.

Northern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Park Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Drive, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jul 2025 at 08:01.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Castlefields

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Castlefields, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 16:06.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 11:23.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Sep 2025 at 13:07.

Northern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Armley Grange Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Armley Grange Drive, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 14:38.

Telefonica UK logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Silcoates Lane

Telefonica UK are proposing to carry out Utility asset works on Silcoates Lane, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 17 Sep 2025 at 15:50.

Telefonica UK logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Silcoates Lane

Telefonica UK are proposing to carry out Utility asset works on Silcoates Lane, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 18 Sep 2025 at 16:28.

Northern Gas Networks logo
Between
31 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Lingwell Nook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lingwell Nook Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 15:04.

Northern Gas Networks logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Towngate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Towngate, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 12:15.

Northern Gas Networks logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Kingsway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingsway, Ossett.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jul 2025 at 11:49.

Northern Gas Networks logo
LONG TERM
Between
3 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Kingsway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsway, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jul 2025 at 12:11.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Jun 2025 at 13:28.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Jun 2025 at 11:47.

Leeds City Council logo
LONG TERM
Between
3 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Jun 2025 at 07:32.

Northern Powergrid (Yorkshire) logo
Between
4 and 10 Nov 2025
Details
View Map
Share
Follow
Mount Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Mount Avenue, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Sep 2025 at 09:04.

Northern Gas Networks logo
Between
5 and 21 Nov 2025
Details
View Map
Share
Follow
Oaks Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Road, Soothill, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:41.

Northern Gas Networks logo
Between
6 and 28 Nov 2025
Details
View Map
Share
Follow
Footpath Fronting 21-33 Beech Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 21-33 Beech Walk, Birkenshaw, Bradford.

These works are categorised as Major.

The works will start on or after 6 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 09:26.

Between
6 and 23 Nov 2025
Details
View Map
Share
Follow
Whitehall Road East

Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitehall Road East, Birkenshaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 21 Aug 2025 at 14:51.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 30 Dec 2025
Details
View Map
Share
Follow
Longlands Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longlands Road, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 15:12.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Dale Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Lane, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2025 at 15:21.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Dale Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Lane, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jun 2025 at 11:11.

Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 11:48.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nunroyd

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Nunroyd, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:18.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Park Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Drive, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:15.

Northern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Wood Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wood Lane, Rothwell, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 10:57.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 22 Aug 2025 at 14:54.

Telefonica UK logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Listing Lane

Telefonica UK were proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 14:54.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 15:26.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 13:47.

Northern Gas Networks logo
LONG TERM
Between
11 Nov 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Low Moor Side Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:51.

Northern Gas Networks logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Towngate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Towngate, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 14:44.

Northern Gas Networks logo
LONG TERM
Between
17 Nov 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Kingsway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsway, Ossett.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 12:28.

Network Rail logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Jul 2025 at 14:04.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 12:48.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 10:34.

Northern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Lingwell Nook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lingwell Nook Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:14.

Northern Gas Networks logo
LONG TERM
Between
19 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Low Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side, New Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 12:07.

Northern Gas Networks logo
LONG TERM
Between
20 Nov 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 13:29.

Northern Gas Networks logo
LONG TERM
Between
20 Nov 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Jun 2025 at 14:11.

Northern Gas Networks logo
LONG TERM
Between
20 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 15:40.

Northern Gas Networks logo
Between
20 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Brown Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brown Lane East, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jun 2025 at 12:46.

Northern Gas Networks logo
Between
20 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Brown Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brown Lane East, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 09:01.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redfearn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfearn Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2025 at 15:21.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redfearn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfearn Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jun 2025 at 11:12.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Kingsley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 13:43.

Northern Gas Networks logo
Between
25 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Meadow Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadow Road, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2025 at 13:11.

Network Rail logo
Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Jul 2025 at 10:20.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Thornhill Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Thornhill Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 10:46.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Thornhill Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Thornhill Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 13:03.

Northern Gas Networks logo
LONG TERM
Between
3 Dec 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 23 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 15:06.

Northern Gas Networks logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Kingsway Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsway Close, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 14:29.

Telefonica UK logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 22 Aug 2025 at 14:54.

Telefonica UK logo
Between
9 and 13 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 15:25.

Telefonica UK logo
Between
9 and 13 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 13:50.

Northern Gas Networks logo
LONG TERM
Between
11 Dec 2025 and 19 Jan 2026
Details
View Map
Share
Top Moor Side

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2025 and run through until 19 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 13:19.

Northern Gas Networks logo
Between
12 Dec 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Shafton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shafton Lane, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jun 2025 at 12:51.

Northern Gas Networks logo
Between
12 Dec 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Shafton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shafton Lane, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 09:12.

Northern Gas Networks logo
Between
12 Dec 2025 and 9 Jan 2026
Details
View Map
Share
Follow
St Matthews Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Matthews Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jun 2025 at 12:49.

Northern Gas Networks logo
Between
12 Dec 2025 and 9 Jan 2026
Details
View Map
Share
Follow
St Matthews Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Matthews Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 09:06.

Northern Gas Networks logo
LONG TERM
Between
12 Dec 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Domestic Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Domestic Street, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 2 February 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
12 Dec 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Domestic Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Domestic Street, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 2 February 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Jun 2025 at 14:12.

Northern Gas Networks logo
Between
15 and 30 Dec 2025
Details
View Map
Share
Follow
Towngate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Towngate, Ossett.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 15:12.

Northern Gas Networks logo
Between
15 and 24 Dec 2025
Details
View Map
Share
Follow
Kingsway Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsway Close, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 14:29.


Roadworks Map near to Lewisham View, LEEDS, LS27 8FD (16 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lewisham View, LEEDS, LS27 8FD (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
PEEL STREET 
(0.1 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
15 Sep 2025 10:00 - 16 Sep 2025 11:25
0.1
Details
Share
2
Northern Gas Networks logo
COMMERCIAL STREET 
(0.1 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 19 Sep 2025 - 23 Sep 2025)
0.1
Details
Share
3
Northern Gas Networks logo
GLEN ROAD 
(0.4 miles)
Northern Gas Networks
New service connection - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 24 Sep 2025
0.4
Details
Share
Follow
4
Northern Powergrid (Yorkshire) logo
URGENT
  
WIDE LANE 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Sep 2025 10:00
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.4
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
URGENT
  
ALBERT ROAD 
(0.5 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
13 Sep 2025 14:20 - 18 Sep 2025 08:20
0.5
Details
Share
6
Northern Gas Networks logo
MAJOR
  
BIRCH STREET 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 31 Mar 2026
0.6
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
MARSHALL CRESCENT 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 31 Mar 2026
0.6
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
CROSS BIRCH STREET 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 31 Mar 2026
0.6
Details
Share
Follow
9
Northern Gas Networks logo
MAJOR
  
HARROP AVENUE 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 31 Mar 2026
0.6
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
ASKEY CRESCENT 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Carriageway - No carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 31 Mar 2026
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.