ROADWORKS SUMMARY
Holmsley Lane, LEEDS, LS26 8SF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Holmsley Lane, LS26 8SF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Holmsley Lane, LEEDS, LS26 8SF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Holmsley Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Swinegate

Leeds City Council are carrying out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2023 at 23:01 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Oct 2023 at 11:34.

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Leeds Road

Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 15:27.

Leeds City Council logo
LONG TERM
Between
7 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Canal Street

Leeds City Council were proposing to carry out Highway improvement works on Canal Street, Armley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2024 and run through until 1 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 2 Aug 2024 at 14:24.

Leeds City Council logo
LONG TERM
Between
7 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Armley Road

Leeds City Council are proposing to carry out Highway improvement works on Armley Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 Jun 2024 at 09:53.

Leeds City Council logo
LONG TERM
Between
29 Jul and 31 Dec 2024
Details
View Map
Share
Follow
Smeaton Approach

Leeds City Council are proposing to carry out Works for road purposes on Smeaton Approach, Manston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 December 2024. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 30 Jul 2024 at 09:04.

Leeds City Council logo
LONG TERM
Between
29 Jul 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Smeaton Approach

Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.

Leeds City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Canal Street

Leeds City Council are carrying out Highway repair and maintenance works on Canal Street, Armley, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2024 at 00:01 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Leeds City Council on 4 Dec 2024 at 14:29.

Leeds City Council logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2024 at 00:01 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Sep 2024 at 13:11.

Leeds City Council logo
LONG TERM
Between
8 Aug 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are proposing to carry out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2024 and could run through until 1 January 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 7 Aug 2024 at 17:08.

Leeds City Council logo
LONG TERM
Between
9 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 13 Aug 2024 at 11:22.

Leeds City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Skelton Grange Road

Leeds City Council are carrying out Highway improvement works on Skelton Grange Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 19 Aug 2024 at 10:25.

Leeds City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are carrying out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 19 Aug 2024 at 10:23.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:12.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:24.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:22.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Aug 2024 at 13:31.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 08:42.

Yorkshire Water logo
LONG TERM
Between
16 Sep 2024 and 28 Feb 2025
Details
View Map
Share
Church Road

Yorkshire Water were proposing to carry out Utility asset works on Church Road, Normanton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 11:40.

Yorkshire Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are carrying out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:30 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 08:40.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
7 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Pioneer Way

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Pioneer Way, Castleford.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Sep 2024 at 09:35.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Pioneer Way

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Pioneer Way, Castleford.

These works are categorised as Major.

The works started on 7 October 2024 at 09:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 14 Oct 2024 at 16:30.

Leeds City Council logo
LONG TERM
Between
9 Oct 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Pontefract Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 10:46.

Northern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Leeds Road, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 16:30.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Elland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Elland Road, Beeston, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 14:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 15:28.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.

Leeds City Council logo
LONG TERM
Until
12 Jun 2026
Details
View Map
Share
Follow
Water Lane

Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 00:00 and could run through until 12 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 07:45.

Northern Gas Networks logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Water Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Water Lane, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 13:18 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 07:45.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Cemetery Road

National Highways are proposing to carry out Works for road purposes on Cemetery Road, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 11:28.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Cemetery Road

National Highways are carrying out Works for road purposes on Cemetery Road, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 November 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Dec 2024 at 08:53.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Main Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Main Street, Allerton Bywater, Castleford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 11:38 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 11:38.

Northern Gas Networks logo
LONG TERM
Between
4 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Ashgap Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashgap Lane, Normanton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 13:40.

Northern Gas Networks logo
LONG TERM
Between
4 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Ashgap Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashgap Lane, Normanton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 10:15.

Northern Gas Networks logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Ashgap Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Ashgap Lane, Normanton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 08:40.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Enfield Terrace

Yorkshire Water are carrying out Utility repair and maintenance works on Enfield Terrace, Sheepscar, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 08:57.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Castleford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castleford Road, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 12:59.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Victoria Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Victoria Street, Allerton Bywater, Castleford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 12:49.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wrenthorpe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Road, Wakefield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 16:36 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 08:35.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Station Road

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Station Road, Normanton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Oct 2024 at 10:33.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Station Road, Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Oct 2024 at 11:17.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Station Road, Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 09:26.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are carrying out New service connection on Station Road, Normanton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 10:04.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Stone Brig Green

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Stone Brig Green, Rothwell, Leeds.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 13:29.

Network Rail logo
Between
19 and 31 Dec 2024
Details
View Map
Share
Follow
Osmondthorpe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Osmondthorpe Lane, Osmondthorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Jul 2024 at 08:03.

Network Rail logo
Between
19 and 31 Dec 2024
Details
View Map
Share
Follow
Osmondthorpe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Osmondthorpe Lane, Osmondthorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 07:44.

Leeds City Council logo
Between
5 and 31 Jan 2025
Details
View Map
Share
Follow
Sheepscar Street North

Leeds City Council are proposing to carry out Highway repair and maintenance works on Sheepscar Street North, Sheepscar, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 11:47.

Northern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Castleford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castleford Road, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:15.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Farrer Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farrer Lane, Oulton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:51.

Northern Powergrid (Yorkshire) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Highfield Place

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Highfield Place, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Nov 2024 at 14:19.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Highfield Place

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Highfield Place, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 08:16.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Highfield Place

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Highfield Place, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 10:19.

Northern Powergrid (Yorkshire) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Highfield Place

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Highfield Place, Allerton Bywater, Castleford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Nov 2024 at 10:19.

Leeds City Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Newsam Green Road

Leeds City Council are proposing to carry out Highway improvement works on Newsam Green Road, Newsam Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 13:18.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ingram Road Distributor

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingram Road Distributor, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2024 at 09:19.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Elland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Elland Road, Beeston, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 12:03.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Admiral Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Admiral Street, Hunslet, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 12:35.

Northern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Ninelands Lane

Northern Gas Networks are proposing to carry out Remedial works on Ninelands Lane, Garforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 08:48.

Electricity Network Company logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Silver Street

Electricity Network Company are proposing to carry out Utility asset works on Silver Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 09:41.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Kirkgate

Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.

Northern Powergrid (Yorkshire) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Park Cross Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Park Cross Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Oct 2024 at 09:42.

Northern Powergrid (Yorkshire) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Park Cross Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Park Cross Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 12:31.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.

Leeds City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Burmantofts Street

Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 16 Dec 2024 at 10:27.

Leeds City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Burmantofts Street

Leeds City Council were proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 14:48.

Leeds City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Beckett Street

Leeds City Council are proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 15:05.

Leeds City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Beckett Street

Leeds City Council were proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 14:47.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 14:29.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:31.

Northern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Fleet Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fleet Lane, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.

Northern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Quarry Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quarry Hill, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:53.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Leeds Road, Allerton Bywater, Castleford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Aug 2024 at 09:06.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Leeds Road, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Aug 2024 at 13:37.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Leeds Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Leeds Road, Allerton Bywater, Castleford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2024 at 15:00.

Northern Powergrid (Yorkshire) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Leeds Road, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Oct 2024 at 08:34.

Leeds City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Rowland Road

Leeds City Council were proposing to carry out Highway improvement works on Rowland Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Dec 2024 at 08:03.

Leeds City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 13:55.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Marlborough Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 07:42.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 07:45.

Leeds City Council logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.

Leeds City Council logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Byron Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Byron Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Austhorpe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 12:37.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Austhorpe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 10:28.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Lascelles Road West

Yorkshire Water are proposing to carry out Utility asset works on Lascelles Road West, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 14:51.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Lascelles Road West

Yorkshire Water are proposing to carry out Utility asset works on Lascelles Road West, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 12:23.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Back Shepherds Place

Yorkshire Water are proposing to carry out Utility asset works on Back Shepherds Place, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 12:54.

Leeds City Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out roadworks on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 6 Dec 2024 at 12:27.

Yorkshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 13:07.

Northern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Barnsdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnsdale Road, Methley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2024 at 12:13.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 May 2025
Details
View Map
Share
Follow
Pinfold Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinfold Lane, Methley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2024 at 12:29.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Harlech Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harlech Way, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:12.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:59.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Oakwood Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakwood Lane, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 16:30.

Northern Powergrid (Yorkshire) logo
Between
22 and 28 Jan 2025
Details
View Map
Share
Follow
Barden Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Barden Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 15:48.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 10:26.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
High Court Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on High Court Lane, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Dec 2024 at 08:37.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Highfield Drive

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Highfield Drive, Allerton Bywater, Castleford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2024 at 14:39.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Highfield Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Highfield Drive, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Oct 2024 at 08:32.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Highfield Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Highfield Drive, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 07:54.

Northern Gas Networks logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Windsor Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Green, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:12.

Northern Gas Networks logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Back Harehills Park View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Harehills Park View, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2024 at 08:23.

Leeds City Council logo
Between
29 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Dewsbury Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Nov 2024 at 13:11.

Leeds City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Pauls Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Pauls Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Sep 2024 at 10:43.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:27.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Brigshaw Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brigshaw Lane, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2024 at 07:52.

Leeds City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
The Oval

Leeds City Council were proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 31 Oct 2024 at 15:17.

Leeds City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
The Oval

Leeds City Council are proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Nov 2024 at 09:32.

Northern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Castleford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castleford Road, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 13:42.

Northern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Castleford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castleford Road, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 10:16.

Northern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Victoria Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Street, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 15:43.

Northern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Brigshaw Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brigshaw Drive, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2024 at 07:55.

Yorkshire Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 14:19.

Yorkshire Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Dec 2024 at 07:18.

Leeds City Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Burton Road

Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 6 Nov 2024 at 08:49.

Leeds City Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Burton Road

Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Nov 2024 at 09:26.

Yorkshire Water logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Dewsbury Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 08:32.

Northern Gas Networks logo
LONG TERM
Between
13 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Marlborough Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2024 at 15:49.

Northern Gas Networks logo
LONG TERM
Between
13 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2024 at 09:57.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Victoria Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Street, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 15:19.

Leeds City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Oakhurst Avenue

Leeds City Council are proposing to carry out Highway improvement works on Oakhurst Avenue, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 8 Nov 2024 at 08:18.

Northern Gas Networks logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Skipton Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skipton Rise, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:01.

Leeds City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Queen Street

Leeds City Council were proposing to carry out Highway repair and maintenance works on Queen Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 09:47.

Leeds City Council logo
Between
23 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Acre Close

Leeds City Council are proposing to carry out Highway improvement works on Acre Close, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 16:05.

Northern Gas Networks logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Granville Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Granville Street, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 13:43.

Northern Gas Networks logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Granville Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Granville Street, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 10:17.

Northern Gas Networks logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Green Lea

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lea, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:25.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Preston Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Lane, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2024 at 07:54.

Leeds City Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Orion Walk

Leeds City Council are proposing to carry out Highway improvement works on Orion Walk, Belle Isle, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 14:55.

Northern Gas Networks logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Southleigh Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Southleigh Crescent, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:17.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:11.

National Highways logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
William Parkin Way

National Highways are proposing to carry out Highway repair and maintenance works on William Parkin Way, Austhorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Dec 2024 at 13:03.

Northern Gas Networks logo
Between
1 and 23 Mar 2025
Details
View Map
Share
Follow
Easterly Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Easterly Road, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Jun 2024 at 11:14.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Greengate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greengate, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:26.

Northern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Brigshaw Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brigshaw Drive, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 08:15.

Leeds City Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Burton Road

Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 14:53.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 9 May 2025
Details
View Map
Share
Follow
New Sturton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Sturton Lane, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 13:55.

Leeds City Council logo
Between
9 and 17 Mar 2025
Details
View Map
Share
Queen Street

Leeds City Council were proposing to carry out Highway repair and maintenance works on Queen Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Nov 2024 at 10:25.

Northern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Edinburgh Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edinburgh Place, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 16:00.

Leeds City Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Grafton Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Grafton Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 10:22.

Leeds City Council logo
Between
11 and 20 Mar 2025
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 08:28.

Leeds City Council logo
Between
16 and 22 Mar 2025
Details
View Map
Share
Follow
Butts Court

Leeds City Council are proposing to carry out Highway repair and maintenance works on Butts Court, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Nov 2024 at 16:30.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Allerton Bywater, Castleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 12:09.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Victoria Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Street, Allerton Bywater, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 15:20.


Roadworks Map near to Holmsley Lane, LEEDS, LS26 8SF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Holmsley Lane, LEEDS, LS26 8SF (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
SPRINGHEAD ROAD, ROTHWELL 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
16 Dec 2024 15:16 - 16:01
0.2
Details
Share
2
Northern Gas Networks logo
MAJOR
  
QUARRY HILL, OULTON 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 07:51
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
3
Northern Gas Networks logo
ROBERTS STREET, WOODLESFORD 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 07:50
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
4
Northern Gas Networks logo
BULLER STREET, WOODLESFORD 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 07:49
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
5
Northern Gas Networks logo
MAJOR
  
CLAREMONT STREET, OULTON 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 5 Dec 2024 08:00
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
6
Virgin Media logo
KNIGHTSCROFT AVENUE, ROTHWELL 
(0.7 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 16 Dec 2024 - 18 Dec 2024
0.7
Details
Share
Follow
7
Virgin Media logo
OAKROYD, ROTHWELL 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.8
Details
Share
Follow
8
Northern Powergrid (Yorkshire) logo
MARSH STREET, ROTHWELL 
(0.8 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Two-way signals
Planned
Scheduled: 13 Dec 2024 - 19 Dec 2024
0.8
Details
Share
Follow
9
Northern Powergrid (Yorkshire) logo
MARSH STREET, ROTHWELL 
(0.8 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - No carriageway incursion
In Progress
Since: 13 Dec 2024 12:00
(Scheduled: 13 Dec 2024 - 19 Dec 2024)
0.8
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
MIDLAND STREET, OULTON 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 5 Dec 2024 08:00
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.