Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Aberford Road, LS26 8HP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Aberford Road, LEEDS, LS26 8HP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Aberford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Yorkshire Water logo
LONG TERM
Until
30 Dec 2026
Details
View Map
Share
Follow
Wheldon Road

Yorkshire Water are carrying out Utility repair and maintenance works on Wheldon Road, Castleford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 June 2025 at 12:45 and could run through until 30 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 16:02.

Leeds City Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Templar Place

Leeds City Council are carrying out Highway improvement works on Templar Place, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2025 at 07:00 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 6 Nov 2025 at 11:41.

Leeds City Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Templar Lane

Leeds City Council are carrying out Highway improvement works on Templar Lane, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2025 at 07:00 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 6 Nov 2025 at 11:40.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Eastgate

Leeds City Council are proposing to carry out Highway improvement works on Eastgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Lady Lane

Leeds City Council are proposing to carry out Highway improvement works on Lady Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway improvement works on Bridge Street, Sheepscar, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:40.

Leeds City Council logo
LONG TERM
Between
17 Nov 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Templar Street

Leeds City Council are proposing to carry out Highway improvement works on Templar Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Oct 2025 at 13:41.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Bridge End

Leeds City Council are carrying out Highway improvement works on Bridge End, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:48.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are carrying out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 12:01.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Briggate

Leeds City Council are carrying out Highway improvement works on Briggate, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:48.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are carrying out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2026 at 11:47.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are carrying out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:58.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:40.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:38.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are carrying out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:50.

Leeds City Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are carrying out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 Mar 2026 at 11:57.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Marsh Lane

Leeds City Council are proposing to carry out Highway improvement works on Marsh Lane, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:07.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
New York Road

Leeds City Council are proposing to carry out Highway improvement works on New York Road, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 9 Sep 2025 at 15:51.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:07.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Rigton Approach

Leeds City Council are proposing to carry out Highway improvement works on Rigton Approach, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:06.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Burmantofts Street

Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 2 Sep 2025 at 10:52.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Naseby View

Leeds City Council are proposing to carry out Highway improvement works on Naseby View, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:05.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Nippet Lane

Leeds City Council are proposing to carry out Highway improvement works on Nippet Lane, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:05.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Accommodation Road

Leeds City Council are proposing to carry out Highway improvement works on Accommodation Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:02.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Lincoln Green Road

Leeds City Council are proposing to carry out Highway improvement works on Lincoln Green Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:03.

Leeds City Council logo
LONG TERM
Between
5 Jan 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Rectory Street

Leeds City Council are proposing to carry out Highway improvement works on Rectory Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 May 2026 at 13:06.

Network Rail logo
LONG TERM
Until
4 Dec 2026
Details
View Map
Share
Follow
Ridge Road

Network Rail are carrying out Works for Rail Purposes on Ridge Road, Micklefield, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2026 at 07:00 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Mar 2026 at 08:30.

Yorkshire Water logo
LONG TERM
Until
26 Mar 2027
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are carrying out Utility asset works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2026 at 06:00 and could run through until 26 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2026 at 12:01.

Network Rail logo
LONG TERM
Until
15 Jan 2027
Details
View Map
Share
Follow
Austhorpe Lane

Network Rail are carrying out Works for Rail Purposes on Austhorpe Lane, Austhorpe, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2026 at 08:00 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Apr 2026 at 08:15.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
30 Nov 2027
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are carrying out Highway improvement works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2026 at 18:00 and could run through until 30 November 2027. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Jun 2026 at 11:19.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are carrying out Highway improvement works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2026 at 18:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 May 2026 at 12:31.

Network Rail logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Pepper Road

Network Rail are carrying out Works for Rail Purposes on Pepper Road, Hunslet, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2026 at 07:00 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2026 at 08:27.

Leeds City Council logo
LONG TERM
Between
22 Jun 2026 and 27 Aug 2027
Details
View Map
Share
Follow
Beckett Street

Leeds City Council are proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2026 and could run through until 27 August 2027. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Feb 2026 at 15:02.

Yorkshire Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fearnville Drive

Yorkshire Water are carrying out Utility asset works on Fearnville Drive, Roundhay, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2026 at 10:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 12:11.

Leeds City Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Concordia Street

Leeds City Council are proposing to carry out Highway improvement works on Concordia Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 28 May 2026 at 13:27.

Yorkshire Water logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Clarendon Street

Yorkshire Water are carrying out Utility repair and maintenance works on Clarendon Street, Wakefield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 13:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 09:44.

Leeds City Council logo
LONG TERM
Between
3 Aug and 14 Nov 2026
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 14 November 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 Aug 2026 at 15:35.

Northern Gas Networks logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Pontefract Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Pontefract Road, Castleford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 August 2026 at 09:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 15:41.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Wood Lane

City Of Wakefield Metropolitan District Council are carrying out New service connection on Wood Lane, Castleford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:42 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 7 Sep 2026 at 09:31.

Northern Gas Networks logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Kippax, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 12:50 and could run through until 13 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2026 at 12:57.

Yorkshire Water logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are carrying out Utility repair and maintenance works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:30 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2026 at 10:15.

Yorkshire Water logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
Thorn Terrace

Yorkshire Water are carrying out Utility asset works on Thorn Terrace, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 08:40 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 09:29.

Yorkshire Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Eshald Lane

Yorkshire Water are carrying out Utility asset works on Eshald Lane, Woodlesford, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 09:00 and could run through until 29 September 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 08:48.

Electricity Network Company logo
Until
27 Sep 2026
Details
View Map
Share
Follow
California Drive

Electricity Network Company are carrying out Utility asset works on California Drive, Castleford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 11:15 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 10 Sep 2026 at 16:03.

Northern Powergrid (Yorkshire) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pontefract Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:30 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2026 at 08:05.

Yorkshire Water logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Pepper Road

Yorkshire Water are carrying out Utility asset works on Pepper Road, Hunslet, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 08:33.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Pontefract Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:29 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2026 at 08:36.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
2 Sep and 2 Oct 2026
Details
View Map
Share
Wykebeck Valley Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Wykebeck Valley Road, Gipton, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2026 at 14:06.

City Of Wakefield Metropolitan District Council logo
Between
3 and 25 Sep 2026
Details
View Map
Share
Follow
Wheldon Road

City Of Wakefield Metropolitan District Council are proposing to carry out New service connection on Wheldon Road, Castleford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 3 Sep 2026 at 15:08.

City Of Wakefield Metropolitan District Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wheldon Road

City Of Wakefield Metropolitan District Council are carrying out New service connection on Wheldon Road, Castleford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 11:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 5 Sep 2026 at 07:52.

Northern Gas Networks logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Wheldon Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wheldon Road, Castleford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 14:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 13:46.

Yorkshire Water logo
LONG TERM
Until
25 Oct 2026
Details
View Map
Share
Follow
Amberton Gardens

Yorkshire Water are carrying out Utility asset works on Amberton Gardens, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:00 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 10:38.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Leeds Road

Leeds City Council were proposing to carry out Highway improvement works on Leeds Road, Lofthouse, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 26 March 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 8 Sep 2026 at 08:21.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Longthorpe Lane

Leeds City Council were proposing to carry out Highway improvement works on Longthorpe Lane, Lofthouse, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 26 March 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 8 Sep 2026 at 09:03.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are proposing to carry out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 14 Jan 2026 at 10:26.

Leeds City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Westfield Lane

Leeds City Council are carrying out Highway repair and maintenance works on Westfield Lane, Kippax, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 10 Sep 2026 at 13:53.

Leeds City Council logo
LONG TERM
Between
7 Sep 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are proposing to carry out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 26 Jan 2026 at 15:58.

Northern Powergrid (Yorkshire) logo
Until
4 Oct 2026
Details
View Map
Share
Follow
Low Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Low Road, Hunslet, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 13:30 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 14:31.

Yorkshire Water logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Ridge Road

Yorkshire Water are proposing to carry out Utility asset works on Ridge Road, Micklefield, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 14:59.

Yorkshire Water logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Ridge Road

Yorkshire Water are proposing to carry out Utility asset works on Ridge Road, Micklefield, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:55.

Leeds City Council logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Dufton Approach

Leeds City Council are carrying out Highway repair and maintenance works on Dufton Approach, Seacroft, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 10:59.

Yorkshire Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Thorn Mount

Yorkshire Water are carrying out Utility asset works on Thorn Mount, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 13:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 13:11.

Yorkshire Water logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Fearnville Avenue

Yorkshire Water are carrying out Utility asset works on Fearnville Avenue, Roundhay, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 09:51.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Midland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Midland Road, Hunslet, Leeds.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 11:35 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 14:18.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hawkhill Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Hawkhill Drive, Cross Gates, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 14:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 14:27.

Northern Gas Networks logo
Until
29 Sep 2026
Details
View Map
Share
Follow
St Helens Place

Northern Gas Networks are carrying out Utility repair and maintenance works on St Helens Place, Castleford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:30 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 10:34.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Firville Avenue

Yorkshire Water are carrying out Utility repair and maintenance works on Firville Avenue, Normanton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:01 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 10:32.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Stafford Street

Northern Powergrid (Yorkshire) are carrying out roadworks on Stafford Street, Castleford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 19:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 08:30.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hunslet Hall Road

Yorkshire Water are carrying out Utility repair and maintenance works on Hunslet Hall Road, Beeston, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 17:55 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 12:38.

City Of Wakefield Metropolitan District Council logo
Between
14 and 23 Sep 2026
Details
View Map
Share
Follow
Brunel Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on Brunel Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 3 Aug 2026 at 12:44.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Leake Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Leake Street, Castleford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 14:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 15:22.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 07:49.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 10:58.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 08:30.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Thorn Walk

Yorkshire Water are proposing to carry out Utility asset works on Thorn Walk, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2026 at 14:55.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
St John's Grove

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on St John's Grove, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 21 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 10:34.

Electricity Network Company logo
LONG TERM
Until
2 Nov 2026
Details
View Map
Share
Follow
Express Way

Electricity Network Company are carrying out Utility asset works on Express Way, Castleford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:00 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 15 Sep 2026 at 13:01.

Northern Gas Networks logo
Between
15 and 29 Sep 2026
Details
View Map
Share
Follow
Abraham Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Abraham Hill, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Jun 2026 at 08:43.

Northern Gas Networks logo
Between
15 and 29 Sep 2026
Details
View Map
Share
Follow
Berry Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Berry Lane, Great Preston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2025 at 08:38.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
St Hildas Road

Yorkshire Water are carrying out Utility repair and maintenance works on St Hildas Road, Cross Green, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 07:30 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 09:39.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
St Hildas Place

Yorkshire Water were proposing to carry out Utility repair and maintenance works on St Hildas Place, Cross Green, Leeds.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 12:20.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Easterly View

Yorkshire Water are carrying out Utility repair and maintenance works on Easterly View, Gipton, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 16:35 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 08:30.

Yorkshire Water logo
Between
16 and 25 Sep 2026
Details
View Map
Share
Follow
New Temple Gate

Yorkshire Water are proposing to carry out Permanent reinstatement on New Temple Gate, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 15:07.

Yorkshire Water logo
Until
25 Sep 2026
Details
View Map
Share
Follow
New Temple Gate

Yorkshire Water are carrying out Permanent reinstatement on New Temple Gate, Halton, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 08:02.

Yorkshire Water logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Temple Avenue

Yorkshire Water are carrying out Permanent reinstatement on Temple Avenue, Halton, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 08:03.

Northern Powergrid (Yorkshire) logo
Between
17 and 24 Sep 2026
Details
View Map
Share
Follow
Birchroyd

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Birchroyd, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Jul 2026 at 10:14.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
York Road

Yorkshire Water were proposing to carry out Permanent reinstatement on York Road, Burmantofts, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 21 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 13:58.

Northern Gas Networks logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Park West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park West, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Aug 2026 at 09:53.

Northern Gas Networks logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Park West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park West, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2026 at 16:09.

Northern Gas Networks logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Park West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park West, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2026 at 15:24.

Northern Gas Networks logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Park West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park West, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 13:30.

Northern Gas Networks logo
Between
18 Sep and 15 Oct 2026
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jul 2026 at 08:45.

Yorkshire Water logo
Between
19 Sep and 11 Oct 2026
Details
View Map
Share
Follow
North Parkway

Yorkshire Water are proposing to carry out Utility repair and maintenance works on North Parkway, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2026 at 12:20.

Northern Gas Networks logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Nineveh Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Nineveh Road, Holbeck, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 10:26.

Yorkshire Water logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Cross Green Lane

Yorkshire Water were proposing to carry out Utility asset works on Cross Green Lane, Cross Green, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:52.

Northern Gas Networks logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Easy Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Easy Road, Cross Green, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 May 2026 at 15:06.

Northern Gas Networks logo
LONG TERM
Between
23 Sep and 27 Oct 2026
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 12:47.

Northern Powergrid (Yorkshire) logo
Between
24 and 30 Sep 2026
Details
View Map
Share
Follow
Brookfield Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Brookfield Avenue, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2026 at 10:02.

Network Rail logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Barnsdale Road

Network Rail are proposing to carry out Works for Rail Purposes on Barnsdale Road, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2026 at 09:49.

Network Rail logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Neville Street

Network Rail were proposing to carry out Works for Rail Purposes on Neville Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 1 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Aug 2026 at 15:15.

Leeds City Council logo
Between
28 Sep and 10 Oct 2026
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on York Road, Whinmoor, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Aug 2026 at 14:49.

Northern Gas Networks logo
Between
29 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Styebank Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Styebank Lane, Rothwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 13:00.

Northern Powergrid (Yorkshire) logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Fairway Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fairway Drive, Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Jul 2026 at 11:00.

City Of Wakefield Metropolitan District Council logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Wrenthorpe Bypass A650

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wrenthorpe Bypass A650, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 29 Jul 2026 at 14:34.

Northern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Eastfield Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastfield Lane, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2026 at 08:33.

Northern Powergrid (Yorkshire) logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Meadowgate Vale

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Meadowgate Vale, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 09:50.

Leeds City Council logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
St Hildas Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Hildas Avenue, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Aug 2026 at 09:50.

Leeds City Council logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Jun 2026 at 15:33.

Northern Powergrid (Yorkshire) logo
Between
6 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pontefract Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2026 at 12:07.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Whitwood Common Lane

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Whitwood Common Lane, Castleford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Aug 2026 at 12:58.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Oct and 13 Nov 2026
Details
View Map
Share
Follow
California Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on California Drive, Castleford.

These works are categorised as Major.

The works will start on or after 10 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Aug 2026 at 12:58.

Yorkshire Water logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Back Cross Green Crescent

Yorkshire Water are proposing to carry out Utility asset works on Back Cross Green Crescent, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2026 at 08:10.

Yorkshire Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Oak Crescent

Yorkshire Water are proposing to carry out New service connection on Oak Crescent, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Jul 2026 at 08:55.

Yorkshire Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Oak Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oak Crescent, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2026 at 13:24.

Yorkshire Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are proposing to carry out Utility asset works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 09:09.

Yorkshire Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Upper Accommodation Road

Yorkshire Water are proposing to carry out Utility asset works on Upper Accommodation Road, Richmond Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 13:33.

Yorkshire Water logo
LONG TERM
Between
12 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Thorn Grove

Yorkshire Water are proposing to carry out Utility asset works on Thorn Grove, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 13:27.

Northern Powergrid (Yorkshire) logo
Between
19 and 28 Oct 2026
Details
View Map
Share
Follow
Cutsyke Crest

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cutsyke Crest, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jul 2026 at 12:37.

Leeds City Council logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Sharp Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Sharp Lane, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Jul 2026 at 10:22.

Northern Gas Networks logo
Between
19 and 28 Oct 2026
Details
View Map
Share
Follow
Station Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Lane, Woodlesford, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2026 at 09:50.

Leeds City Council logo
Between
19 and 26 Oct 2026
Details
View Map
Share
Follow
Old Run Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Old Run Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 13:37.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Trent Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Trent Street, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 2 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:54.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Trent Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Trent Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:55.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Marshall Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Marshall Street, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 2 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:56.

Northern Gas Networks logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marshall Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marshall Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 15:56.

Yorkshire Water logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out New service connection on Church Lane, Garforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 14:17.

Yorkshire Water logo
Between
21 and 23 Oct 2026
Details
View Map
Share
Follow
Back Osmondthorpe Lane

Yorkshire Water are proposing to carry out New service connection on Back Osmondthorpe Lane, Osmondthorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 14:56.

Northern Gas Networks logo
Between
24 and 31 Oct 2026
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jul 2026 at 16:17.

Electricity Network Company logo
Between
26 Oct and 22 Nov 2026
Details
View Map
Share
Follow
Express Way Wakefield Europort

Electricity Network Company are proposing to carry out Utility asset works on Express Way Wakefield Europort, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 22 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jul 2026 at 09:57.

City Of Wakefield Metropolitan District Council logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Baker Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway improvement works on Baker Lane, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Sep 2026 at 11:51.

Northern Gas Networks logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Station Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Lane, Woodlesford, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 13:15.

Leeds City Council logo
Between
26 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Selby Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Feb 2026 at 10:11.

Leeds City Council logo
Between
26 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Primrose Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Primrose Lane, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Feb 2026 at 10:12.

Yorkshire Water logo
Between
26 Oct and 22 Nov 2026
Details
View Map
Share
Follow
Amberton Garth

Yorkshire Water are proposing to carry out Utility asset works on Amberton Garth, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 12:19.

Leeds City Council logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Town Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Town Street, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Jul 2026 at 10:21.

Yorkshire Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Kingsway

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kingsway, Garforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Jul 2026 at 12:43.

Yorkshire Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Halton Moor Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Halton Moor Avenue, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2026 at 12:17.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Fearnville View

Yorkshire Water are proposing to carry out Utility asset works on Fearnville View, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 13:49.

Northern Powergrid (Yorkshire) logo
Between
3 and 9 Nov 2026
Details
View Map
Share
Follow
Chelsfield Way

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chelsfield Way, Manston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Jul 2026 at 15:12.

Yorkshire Water logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Hodgson Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hodgson Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 08:34.

Northern Gas Networks logo
Between
5 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Stratford Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratford Street, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 15:09.

Electricity Network Company logo
Between
9 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Pope Street

Electricity Network Company are proposing to carry out Utility asset works on Pope Street, Normanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jul 2026 at 11:30.

Yorkshire Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Wesley Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wesley Street, Castleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Aug 2026 at 09:09.

Northern Powergrid (Yorkshire) logo
Between
11 and 19 Nov 2026
Details
View Map
Share
Follow
Sturton Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sturton Avenue, Garforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Jun 2026 at 15:12.

Northern Gas Networks logo
Between
12 and 23 Nov 2026
Details
View Map
Share
Follow
Westbourne Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbourne Place, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 15:08.

Yorkshire Water logo
LONG TERM
Between
16 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Fearnville Terrace

Yorkshire Water are proposing to carry out Utility asset works on Fearnville Terrace, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2026 at 13:02.

Northern Powergrid (Yorkshire) logo
Between
23 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Lake Lock Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lake Lock Drive, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Jul 2026 at 13:43.

Yorkshire Water logo
Between
23 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Amberton Lane

Yorkshire Water are proposing to carry out Utility asset works on Amberton Lane, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 12:17.

Northern Gas Networks logo
Between
4 and 21 Dec 2026
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 21 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 31 Jul 2026 at 13:38.

Yorkshire Water logo
Between
7 and 22 Dec 2026
Details
View Map
Share
Follow
Oak Tree Drive

Yorkshire Water are proposing to carry out Utility asset works on Oak Tree Drive, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jun 2026 at 14:07.

Yorkshire Water logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Amberton Mount

Yorkshire Water are proposing to carry out Utility asset works on Amberton Mount, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 14:05.

Yorkshire Water logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Amberton Mount

Yorkshire Water are proposing to carry out Utility asset works on Amberton Mount, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:31.

Northern Powergrid (Yorkshire) logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Willans Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Willans Avenue, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 12:19.


Roadworks Map near to Aberford Road, LEEDS, LS26 8HP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Aberford Road, LEEDS, LS26 8HP (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
EMERGENCY
  
HOLMSLEY FIELD LANE, OULTON 
(0.1 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 12 Sep 2026 10:26
(Scheduled: 12 Sep 2026 - 18 Sep 2026)
0.1
Details
Share
Follow
2
Yorkshire Water logo
URGENT
  
ESHALD LANE, WOODLESFORD 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway, Footpath - Road closure
In Progress
Since: 25 Aug 2026 09:00
(Scheduled: 25 Aug 2026 - 29 Sep 2026)
0.2
Details
Share
Follow
3
BT logo
DERWENT AVENUE, WOODLESFORD 
(0.4 miles)
BT
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.4
Details
Share
Follow
4
Virgin Media logo
OULTON DRIVE, OULTON 
(0.7 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.7
Details
Share
Follow
5
Yorkshire Water logo
URGENT
  
HOLMSLEY LANE, WOODLESFORD 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Road closure
In Progress
Since: 14 Sep 2026 12:24
(Scheduled: 14 Sep 2026 - 18 Sep 2026)
0.8
Details
Share
Follow
6
Yorkshire Water logo
SUGAR HILL CLOSE, OULTON 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.8
Details
Share
7
Leeds City Council logo
MAJOR
  
SUGAR HILL CLOSE, OULTON 
(0.8 miles)
Leeds City Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 29 Jul 2026 07:30
(Scheduled: 29 Jul 2026 - 16 Oct 2026)
0.8
Details
Share
Follow
8
Yorkshire Water logo
SUGAR HILL CLOSE, OULTON 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 7 Sep 2026 09:20
(Scheduled: 7 Sep 2026 - 17 Sep 2026)
0.8
Details
Share
Follow