ROADWORKS SUMMARY
Wakefield Road, LEEDS, LS26 0SF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wakefield Road, LS26 0SF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wakefield Road, LEEDS, LS26 0SF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wakefield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Whitehall Road

Leeds City Council are carrying out Highway improvement works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 11:27.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Kirkgate

Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
18 Mar 2025 and 9 Aug 2026
Details
View Map
Share
Follow
Ingwell Street

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ingwell Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 9 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 6 Jun 2025 at 11:36.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
9 Aug 2026
Details
View Map
Share
Follow
Ingwell Street

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Ingwell Street, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 08:00 and could run through until 9 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 17 Jun 2025 at 12:30.

Network Rail logo
LONG TERM
Between
31 Mar and 25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 11:26.

Network Rail logo
LONG TERM
Until
25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are carrying out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 01:00 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Jul 2025 at 10:46.

Yorkshire Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Mar 2025 at 13:26.

Yorkshire Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Mar 2025 at 13:18.

Northern Gas Networks logo
LONG TERM
Between
27 May 2025 and 28 Jul 2026
Details
View Map
Share
Ring Road Crossgates

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 28 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 11:41.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
17 Sep 2025
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:00 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 17 Jun 2025 at 08:52.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
17 Sep 2025
Details
View Map
Share
Follow
Thornes Lane

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Thornes Lane, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 19:00 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 4 Jul 2025 at 11:20.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
17 Sep 2025
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 June 2025 at 20:00 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 24 Jul 2025 at 13:47.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
17 Sep 2025
Details
View Map
Share
Follow
Kirkgate

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Kirkgate, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 19:00 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 9 Jul 2025 at 08:38.

Leeds City Council logo
LONG TERM
Between
16 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:32.

Leeds City Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are carrying out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 06:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Jun 2025 at 09:16.

Yorkshire Water logo
LONG TERM
Between
23 Jun and 14 Sep 2025
Details
View Map
Share
Follow
Embleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Embleton Road, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 08:32.

Yorkshire Water logo
LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Embleton Road

Yorkshire Water are carrying out Utility repair and maintenance works on Embleton Road, Methley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 13:10 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 15:07.

Yorkshire Water logo
LONG TERM
Between
23 Jun and 14 Sep 2025
Details
View Map
Share
Follow
Embleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Embleton Road, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 14:27.

Yorkshire Water logo
LONG TERM
Between
23 Jun and 14 Sep 2025
Details
View Map
Share
Follow
Embleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Embleton Road, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 11:20.

Yorkshire Water logo
LONG TERM
Between
23 Jun and 14 Sep 2025
Details
View Map
Share
Embleton Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Embleton Road, Methley, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 14 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 May 2025 at 13:27.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Fountain Street

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Fountain Street, Woodhouse, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 09:45 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Jul 2025 at 10:08.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 26 Jun 2026
Details
View Map
Share
Ring Road Beeston

Leeds City Council were proposing to carry out Highway improvement works on Ring Road Beeston, Beeston, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 26 June 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 26 Jun 2025 at 10:40.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Park Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2025 at 09:15 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jul 2025 at 09:53.

Yorkshire Water logo
LONG TERM
Between
18 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:34.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Station Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Station Road, Normanton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:40 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 29 Aug 2025 at 12:25.

National Highways logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are carrying out Highway repair and maintenance works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 19:00 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Jul 2025 at 14:29.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 17 Sep 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:19.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:56.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Topcliffe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Topcliffe Lane, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:59.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 13:19.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 09:59.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 12:41.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
York Road

Northern Gas Networks are carrying out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Jul 2025 at 14:47.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St Marks Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2025 at 13:36.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St Marks Street

Northern Gas Networks are carrying out Utility repair and maintenance works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 12:41.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Woodhouse Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodhouse Lane, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2025 at 13:36.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Woodhouse Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodhouse Lane, Woodhouse, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 14:26.

Northern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 07:54.

Leeds City Council logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2024 at 16:30.

Yorkshire Water logo
LONG TERM
Between
10 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Kirkgate

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kirkgate, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2025 at 09:46.

Yorkshire Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Kirkgate

Yorkshire Water are carrying out Utility repair and maintenance works on Kirkgate, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2025 at 15:04 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Aug 2025 at 07:23.

Northern Gas Networks logo
LONG TERM
Between
11 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 09:44.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:40.

Northern Gas Networks logo
LONG TERM
Between
13 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Mar 2025 at 11:52.

Northern Gas Networks logo
LONG TERM
Between
13 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 09:22.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
14 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Peterson Road

City Of Wakefield Metropolitan District Council are proposing to carry out roadworks on Peterson Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 21 Aug 2025 at 15:21.

Yorkshire Water logo
LONG TERM
Between
14 Aug and 14 Sep 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:08.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:44.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Sweet Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sweet Street, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jul 2025 at 12:40.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Marshall Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marshall Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jul 2025 at 12:39.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Sweet Street West

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jul 2025 at 12:41.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Jul 2025 at 12:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Jul 2025 at 11:04.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:30 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2025 at 09:18.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are carrying out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 11:07.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:17.

Yorkshire Water logo
Between
20 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 15:01.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Oak Tree Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Tree Lane, Killingbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Leopold Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 16:01.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Canal Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Canal Lane, Lofthouse Gate, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 09:21.

Northern Gas Networks logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Potovens Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Potovens Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 09:21.

Northern Gas Networks logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 09:20.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are carrying out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2025 at 08:27.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
St Wilfrids Circus

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Wilfrids Circus, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:29.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Bradford Road, Tingley, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 10:00 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 11:04.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Back Cross Green Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Back Cross Green Lane, Cross Green, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 13:00 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 14:30.

Northern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Windsor Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Windsor Road, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 09:00.

Northern Gas Networks logo
Between
29 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wrenthorpe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrenthorpe Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2025 at 12:59.

Northern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Wrenthorpe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Road, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 09:01.

Northern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Apr 2025 at 12:33.

Northern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:25.

Northern Powergrid (Yorkshire) logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Denby Dale Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Denby Dale Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 15:22.

Northern Powergrid (Yorkshire) logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Denby Dale Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Denby Dale Road, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:00 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 10:55.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Brunswick Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brunswick Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jun 2025 at 10:52.

Northern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Bowling Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowling Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 09:43.

City Of Wakefield Metropolitan District Council logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Lake Lock Drive

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lake Lock Drive, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 21 Aug 2025 at 13:54.

Northern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Canal Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canal Lane, Lofthouse Gate, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:51.

Northern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Canal Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canal Lane, Lofthouse Gate, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:13.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Potovens Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potovens Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:57.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Potovens Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potovens Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:14.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:13.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:55.

Yorkshire Water logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are carrying out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 23:00 and could run through until 30 November 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 09:19.

Yorkshire Water logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are carrying out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 23:00 and could run through until 30 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 09:19.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Dewsbury Road

Leeds City Council are proposing to carry out Highway improvement works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 10 Jul 2025 at 15:38.

Northern Powergrid (Yorkshire) logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Amberley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Aug 2025 at 12:37.

Northern Powergrid (Yorkshire) logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Amberley Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Amberley Road, Upper Wortley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:33 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 09:42.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:14.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:14.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:17.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:19.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:17.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Marsh Lane

Leeds City Council are proposing to carry out Highway improvement works on Marsh Lane, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:44.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
New York Road

Leeds City Council are proposing to carry out Highway improvement works on New York Road, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 16 May 2025 at 13:56.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:55.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Rigton Approach

Leeds City Council are proposing to carry out Highway improvement works on Rigton Approach, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:46.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Burmantofts Street

Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:47.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Naseby View

Leeds City Council are proposing to carry out Highway improvement works on Naseby View, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:45.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:11.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 20 Nov 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:19.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Nippet Lane

Leeds City Council are proposing to carry out Highway improvement works on Nippet Lane, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 11:22.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Accommodation Road

Leeds City Council are proposing to carry out Highway improvement works on Accommodation Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:42.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Lincoln Green Road

Leeds City Council are proposing to carry out Highway improvement works on Lincoln Green Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:44.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Beckett Street

Leeds City Council are proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:51.

Leeds City Council logo
LONG TERM
Between
1 Sep 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Rectory Street

Leeds City Council are proposing to carry out Highway improvement works on Rectory Street, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 10:41.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Nowell Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Nowell Lane, Harehills, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 07:36.

Yorkshire Water logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:42.

Yorkshire Water logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:24.

Yorkshire Water logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:30.

Yorkshire Water logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 13:10.

Northern Powergrid (Yorkshire) logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Oakwood Lane

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Jun 2025 at 14:04.

Northern Powergrid (Yorkshire) logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Oakwood Lane

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:46.

Yorkshire Water logo
Between
2 and 22 Sep 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 14:20.

Yorkshire Water logo
Between
2 and 14 Sep 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 15:28.

Leeds City Council logo
LONG TERM
Between
3 Sep 2025 and 31 Aug 2026
Details
View Map
Share
Follow
Templar Place

Leeds City Council are proposing to carry out Highway improvement works on Templar Place, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 31 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 28 Jul 2025 at 11:36.

Leeds City Council logo
Finishing
Monday
Details
View Map
Share
Follow
St Marks Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Aug 2025 at 11:51.

Northern Gas Networks logo
Between
3 and 22 Sep 2025
Details
View Map
Share
Follow
Louis Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Louis Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 16:08.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Back Mexborough Grove

Yorkshire Water are carrying out Utility repair and maintenance works on Back Mexborough Grove, Chapeltown, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:00 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 11:17.

Northern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Bowling Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowling Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:43.

City Of Wakefield Metropolitan District Council logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Follow
Barnes Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Barnes Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Jun 2025 at 08:40.

Leeds City Council logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Highway repair and maintenance works on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jul 2025 at 10:01.

City Of Wakefield Metropolitan District Council logo
Between
9 and 15 Sep 2025
Details
View Map
Share
Follow
Riverdale Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Riverdale Road, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Jun 2025 at 08:47.

City Of Wakefield Metropolitan District Council logo
Between
9 and 15 Sep 2025
Details
View Map
Share
Follow
Auty Crescent

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Auty Crescent, Stanley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Jun 2025 at 08:44.

Northern Gas Networks logo
Between
11 and 17 Sep 2025
Details
View Map
Share
Follow
M62 J28 Join W

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on M62 J28 Join W, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Jun 2025 at 16:30.

Northern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 15:56.

Northern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 09:44.

City Of Wakefield Metropolitan District Council logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Birkwood Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Birkwood Road, Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 26 Jun 2025 at 15:39.

Yorkshire Water logo
Between
15 and 21 Sep 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility asset works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2025 at 08:53.

Yorkshire Water logo
Between
15 and 21 Sep 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility asset works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 09:09.

Yorkshire Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility asset works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Jun 2025 at 08:12.

Yorkshire Water logo
Between
15 and 21 Sep 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility asset works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 09:14.

Yorkshire Water logo
Between
15 and 28 Sep 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 10:13.

Yorkshire Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Low Common

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Low Common, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Apr 2025 at 12:51.

Leeds City Council logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Sheepscar Street North

Leeds City Council are proposing to carry out Highway improvement works on Sheepscar Street North, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Aug 2025 at 13:49.

Northern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 08:58.

Yorkshire Water logo
Between
15 and 28 Sep 2025
Details
View Map
Share
Follow
Ironwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:10.

Northern Powergrid (Yorkshire) logo
Between
16 and 22 Sep 2025
Details
View Map
Share
Follow
Hertford Chase

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hertford Chase, Colton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Jul 2025 at 09:22.

Northern Powergrid (Yorkshire) logo
Between
16 and 22 Sep 2025
Details
View Map
Share
Follow
Hertford Chase

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hertford Chase, Colton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2025 at 11:21.

Yorkshire Water logo
Between
16 and 23 Sep 2025
Details
View Map
Share
Follow
Compton View

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Compton View, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Jun 2025 at 10:05.

Yorkshire Water logo
Between
16 and 23 Sep 2025
Details
View Map
Share
Compton View

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Compton View, Harehills, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 10:56.

Yorkshire Water logo
Between
16 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 15:07.

Yorkshire Water logo
LONG TERM
Between
16 Sep and 20 Nov 2025
Details
View Map
Share
Foundry Mill Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Foundry Mill Street, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 20 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Mar 2025 at 14:29.

Northern Gas Networks logo
Between
17 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Francis Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Francis Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 14:03.

Northern Gas Networks logo
Between
17 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Cowper Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowper Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 14:13.

Northern Gas Networks logo
Between
19 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 12:37.

Yorkshire Water logo
Between
19 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:54.

Northern Powergrid (Yorkshire) logo
Between
20 and 26 Sep 2025
Details
View Map
Share
Follow
Thirlmere Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Thirlmere Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2025 at 13:34.

Northern Powergrid (Yorkshire) logo
Between
20 and 26 Sep 2025
Details
View Map
Share
Follow
Thirlmere Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Thirlmere Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Jul 2025 at 09:27.

Northern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 15:55.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 11:06.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 11:36.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Westways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westways, Wrenthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 08:53.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Foxdale View

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foxdale View, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Jun 2025 at 15:50.

National Highways logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Selby Road

National Highways are proposing to carry out roadworks on Selby Road, Austhorpe, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Jun 2024 at 09:56.

Leeds City Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out roadworks on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Aug 2025 at 09:43.

Leeds City Council logo
LONG TERM
Between
22 Sep 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leeds City Council on 27 Aug 2025 at 13:30.

Yorkshire Water logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:26.

Yorkshire Water logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Sweet Street West

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 13:29.

Leeds City Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out roadworks on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Jun 2025 at 09:53.

National Highways logo
Between
25 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are proposing to carry out Highway improvement works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 11:01.

National Highways logo
Between
25 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

National Highways are proposing to carry out Highway improvement works on Thorpe Lane, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jun 2025 at 14:26.

Yorkshire Water logo
LONG TERM
Between
29 Sep and 7 Dec 2025
Details
View Map
Share
Follow
The Hollings

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Hollings, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 10:27.

Yorkshire Water logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
The Hollings

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Hollings, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 13:31.

Yorkshire Water logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
The Hollings

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Hollings, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 14:16.

Yorkshire Water logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
The Hollings

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Hollings, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Jun 2025 at 08:20.

Leeds City Council logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hill Top Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Hill Top Street, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 31 Jul 2025 at 14:32.

Yorkshire Water logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:28.

Northern Powergrid (Yorkshire) logo
Between
4 and 11 Oct 2025
Details
View Map
Share
Follow
The Oval

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 16:40.

Northern Powergrid (Yorkshire) logo
Between
4 and 11 Oct 2025
Details
View Map
Share
Follow
The Oval

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Aug 2025 at 09:52.

ESP Electricity logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Marsh Way

ESP Electricity are proposing to carry out Utility asset works on Marsh Way, Wakefield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Aug 2025 at 15:31.

Northern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bowling Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowling Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 11:00.

Leeds City Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Linden Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Linden Road, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 09:53.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Britannia Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Britannia Road, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 13:32.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Fountain Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fountain Street, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 11:19.

Leeds City Council logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 19 Jun 2025 at 14:36.

Yorkshire Water logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Brook Street

Yorkshire Water were proposing to carry out Remedial works on Brook Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2025 at 09:05.

National Highways logo
Between
8 and 23 Oct 2025
Details
View Map
Share
Follow
Pontefract Lane

National Highways are proposing to carry out roadworks on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Jun 2024 at 09:55.

Yorkshire Water logo
Between
8 and 17 Oct 2025
Details
View Map
Share
Follow
Sweet Street West

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2025 at 09:51.

Yorkshire Water logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Dufton Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dufton Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:29.

Leeds City Council logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Follow
Whitfield Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Whitfield Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Aug 2025 at 13:10.

Leeds City Council logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Follow
Whitfield Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Whitfield Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 Aug 2025 at 10:58.

Northern Gas Networks logo
Between
10 and 24 Oct 2025
Details
View Map
Share
Follow
Baker Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Baker Lane, Stanley, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 16:28.

Yorkshire Water logo
LONG TERM
Between
10 Oct and 20 Nov 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:15.

City Of Wakefield Metropolitan District Council logo
Between
12 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Sep 2025 at 11:22.

City Of Wakefield Metropolitan District Council logo
Between
12 Oct and 2 Nov 2025
Details
View Map
Share
Ings Road

City Of Wakefield Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Ings Road, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Sep 2025 at 11:52.

City Of Wakefield Metropolitan District Council logo
Between
12 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Sep 2025 at 12:00.

City Of Wakefield Metropolitan District Council logo
Between
12 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Sep 2025 at 12:04.

Yorkshire Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Brook Street

Yorkshire Water are proposing to carry out Permanent reinstatement on Brook Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Jul 2025 at 09:21.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:04.

Northern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jul 2025 at 15:35.

Yorkshire Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Foundry Mill Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Mill Street, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:38.

Yorkshire Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ironwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:48.

Yorkshire Water logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Ironwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 14:59.

Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Cross Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Cross Lane, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2025 at 09:02.

Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Cross Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Cross Lane, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2025 at 10:22.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ruskin Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 10:49.

Northern Gas Networks logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Baker Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Baker Lane, Stanley, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 11:25.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility asset works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 14:39.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Millshaw

Yorkshire Water are proposing to carry out Utility asset works on Millshaw, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Jun 2025 at 16:15.

Yorkshire Water logo
LONG TERM
Between
20 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jul 2025 at 12:53.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Queen Street

Yorkshire Water are proposing to carry out roadworks on Queen Street, Stourton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2025 at 15:50.

Yorkshire Water logo
LONG TERM
Between
20 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 14:53.

Yorkshire Water logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Pontefract Road

Yorkshire Water are proposing to carry out Utility asset works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 14:25.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lands Lane

Northern Powergrid (Yorkshire) are proposing to carry out Permanent reinstatement on Lands Lane, Leeds.

These works are categorised as Major.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Aug 2025 at 13:09.

Leeds City Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Highway repair and maintenance works on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 16 Jul 2025 at 11:28.

Cornerstone Telecommunications Infrastructure logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Foundry Lane

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 19 Aug 2025 at 08:59.

Cornerstone Telecommunications Infrastructure logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Foundry Lane

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Foundry Lane, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Aug 2025 at 12:53.

Yorkshire Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Foundry Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:04.

Northern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 15:53.

Northern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Apr 2025 at 09:04.

Northern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 16:03.

Northern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Park Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Drive, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jul 2025 at 08:01.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Castlefields

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Castlefields, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 16:06.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 11:23.

Yorkshire Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 13:07.

Northern Gas Networks logo
Between
31 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Lingwell Nook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lingwell Nook Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 15:04.

Northern Gas Networks logo
Between
31 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leopold Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:08.

Leeds City Council logo
LONG TERM
Between
3 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Inner Ring Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Inner Ring Road, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Jun 2025 at 07:32.

Yorkshire Water logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Dufton Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dufton Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:41.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Park Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Drive, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:15.

Yorkshire Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Ferry Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Ferry Lane, Stanley, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2025 at 10:29.

Northern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Lingwell Nook Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lingwell Nook Lane, Lofthouse, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:14.

Yorkshire Water logo
Between
17 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Church Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Apr 2025 at 10:33.

Yorkshire Water logo
Between
17 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Church Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 09:07.

Northern Gas Networks logo
Between
17 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Louis Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Louis Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:07.

Yorkshire Water logo
Between
19 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Ironwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 14:59.

Northern Gas Networks logo
LONG TERM
Between
20 Nov 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 13:29.

Northern Gas Networks logo
LONG TERM
Between
20 Nov 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Jun 2025 at 14:11.

Northern Gas Networks logo
LONG TERM
Between
20 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Top Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 15:40.

Northern Gas Networks logo
Between
20 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Brown Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brown Lane East, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jun 2025 at 12:46.

Northern Gas Networks logo
Between
20 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Brown Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brown Lane East, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 09:01.

Yorkshire Water logo
Between
24 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Church Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 14 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 10:17.

Yorkshire Water logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Church Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 13:25.

Northern Gas Networks logo
Between
25 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Meadow Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadow Road, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2025 at 13:11.

Northern Gas Networks logo
Between
26 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Francis Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Francis Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:06.

Northern Gas Networks logo
Between
26 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Cowper Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowper Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:05.


Roadworks Map near to Wakefield Road, LEEDS, LS26 0SF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wakefield Road, LEEDS, LS26 0SF (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
HOPEFIELD DRIVE, ROTHWELL 
(0.2 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Give and take
In Progress
Since: 3 Sep 2025 11:30
(Scheduled: 3 Sep 2025 - 9 Sep 2025)
0.2
Details
Share
Follow
2
Yorkshire Water logo
MAJOR
  
WAKEFIELD ROAD, ROTHWELL 
(0.3 miles)
Yorkshire Water
New service connection - Footway, Carriageway - Two-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.3
Details
Share
3
National Highways logo
MAJOR
  
SHARP LANE, ROBIN HOOD 
(0.4 miles)
National Highways
Works for road purposes - Footway - Some carriageway incursion
Planned
Scheduled: 17 Apr 2025 - 10 Oct 2025
0.4
Details
Share
Follow
4
National Highways logo
MAJOR
  
SHARP LANE, ROBIN HOOD 
(0.4 miles)
National Highways
Works for road purposes - Footway - Some carriageway incursion
In Progress
Since: 17 Apr 2025 20:00
(Scheduled: 17 Apr 2025 - 10 Oct 2025)
0.4
Details
Share
Follow
5
BT logo
URGENT
  
CASTLE LODGE AVENUE, ROTHWELL 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 3 Sep 2025 09:48
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
0.6
Details
Share
Follow
6
Northern Powergrid (Yorkshire) logo
MAJOR
  
HOPES FARM VIEW, BELLE ISLE 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Aug 2025 - 8 Sep 2025
0.7
Details
Share
Follow
7
Northern Powergrid (Yorkshire) logo
MAJOR
  
HOPES FARM VIEW, BELLE ISLE 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 23 Sep 2025
0.7
Details
Share
Follow
8
Virgin Media logo
RING ROAD MIDDLETON, MIDDLETON 
(0.7 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
1 Sep 2025 09:30 - 3 Sep 2025 13:04
0.7
Details
Share
9
Northern Powergrid (Yorkshire) logo
MAJOR
  
HOPES FARM ROAD, BELLE ISLE 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 20 Aug 2025 - 10 Sep 2025)
0.7
Details
Share
10
Northern Powergrid (Yorkshire) logo
MAJOR
  
HOPES FARM ROAD, BELLE ISLE 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 20 Aug 2025 - 10 Sep 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.