ROADWORKS SUMMARY
Leeds Road, TADCASTER, LS24 9NE
Introduction

View current and future planned roadworks and road closures for Leeds Road, LS24 9NE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Leeds Road, TADCASTER, LS24 9NE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Leeds Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Garth, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:53.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Drive, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:48.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Road, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 13:36.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cedar Drive, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:56.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Walk, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 09:56.
30 Jun 2025
North Yorkshire County Council are carrying out Highway repair and maintenance works on New Road, Ulleskelf.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 April 2025 at 10:00 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 17 Apr 2025 at 16:02.
30 Jun 2025
National Grid Electricity Transmission are carrying out Utility repair and maintenance works on All Saints Church To Healaugh Manor Cottages, Wighill.
These works are categorised as Major.
The works started on 1 May 2025 at 16:00 and could run through until 30 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 7 May 2025 at 16:27.
12 May and 4 Aug 2025
Independent Water Networks are proposing to carry out Utility asset works on York Road, Wetherby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 5 Mar 2025 at 14:57.
Today
National Grid Electricity Transmission are carrying out Utility repair and maintenance works on Castle Hill To The Rein, Saxton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:45 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 22 May 2025 at 11:18.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Five Lane Ends To Church Fenton, Ulleskelf.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 1 Apr 2025 at 10:16.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Busk Lane, Church Fenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 1 Apr 2025 at 09:18.
2 Jun and 28 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Stutton Road, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 May 2025 at 14:06.
2 Jun and 28 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Stutton Road, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 May 2025 at 16:08.
2 Jun and 28 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Stutton Road, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 14:20.
28 Jul 2025
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Stutton Road, Tadcaster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Jun 2025 at 09:02.
2 Jun and 28 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Golf Links Avenue, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 May 2025 at 14:12.
28 Jul 2025
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Golf Links Avenue, Tadcaster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Jun 2025 at 09:01.
13 Jun 2025
North Yorkshire County Council are carrying out Section 50 on Centre Lane, Tadcaster.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:00.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Colton Lane, Colton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 31 Mar 2025 at 12:30.
2 and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Section 50 on Centre Lane, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:09.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Braegate Lane, Colton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 1 Apr 2025 at 10:18.
Friday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Back Lane, Barkston Ash.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 11:35.
9 and 11 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on Malt Kiln Terrace, Stutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 3 Jun 2025 at 13:24.
9 and 13 Jun 2025
Yorkshire Water were proposing to carry out New service connection on The Village, Thorp Arch, Wetherby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 13:21.
10 and 12 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on Church Lane, Stutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 3 Jun 2025 at 13:48.
12 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Leeds Road, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 May 2025 at 12:36.
12 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Leeds Road, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 May 2025 at 14:07.
16 and 18 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 8 May 2025 at 15:53.
16 Jun and 4 Jul 2025
North Yorkshire County Council are proposing to carry out Section 50 on New Street, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:18.
16 Jun and 4 Jul 2025
North Yorkshire County Council are proposing to carry out Section 50 on New Street, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 11 Mar 2025 at 12:43.
20 Jun and 21 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Leeds Road To Cock Bridge, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 May 2025 at 12:39.
23 Jun and 21 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Leeds Road To Cock Bridge, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 May 2025 at 14:11.
23 and 25 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on Church Hill, Bramham, Wetherby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 23 May 2025 at 16:29.
23 and 25 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on High Street, Bramham, Wetherby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 23 May 2025 at 16:28.
23 and 25 Jun 2025
Quickline Commucations are proposing to carry out Utility asset works on Town Hill, Bramham, Wetherby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 23 May 2025 at 16:07.
25 and 27 Jun 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Kiddal Lane, Barwick In Elmet, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 8 May 2025 at 14:44.
23 and 25 Jul 2025
Leeds City Council are proposing to carry out Utility repair and maintenance works on Dowkell Lane, Thorp Arch, Wetherby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 15:42.
29 Jul and 15 Aug 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Castle Hill To The Rein, Saxton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 3 Jun 2025 at 10:08.
4 Aug and 31 Oct 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on All Saints Church To Healaugh Manor Cottages, Wighill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 13 Dec 2024 at 11:30.
4 Aug and 20 Oct 2025
Electricity Network Company are proposing to carry out Utility asset works on York Road, Wetherby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 May 2025 at 11:05.
4 Aug and 20 Oct 2025
Independent Water Networks are proposing to carry out Utility asset works on York Road, Wetherby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 7 May 2025 at 10:57.
11 and 13 Aug 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Raw Lane, Kirkby Wharfe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 19 May 2025 at 10:28.
26 Aug and 21 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on York Road, Wetherby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 14:35.
26 Aug and 21 Nov 2025
Independent Water Networks are proposing to carry out Utility asset works on York Road, Wetherby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 30 May 2025 at 14:30.
28 Aug and 1 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Busk Lane, Church Fenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 12:06.
28 Aug and 2 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Five Lane Ends To Church Fenton, Ulleskelf.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 12:07.
Roadworks Map near to Leeds Road, TADCASTER, LS24 9NE (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Leeds Road, TADCASTER, LS24 9NE (2 Events)
(Scheduled Dates)
(miles)