ROADWORKS SUMMARY
St. Peters Close, WETHERBY, LS22 4FA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Peters Close, LS22 4FA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Peters Close, WETHERBY, LS22 4FA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Peters Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Between
23 Sep 2024 and 26 Sep 2025
Details
View Map
Share
Racecourse Approach

Leeds City Council were proposing to carry out Highway improvement works on Racecourse Approach, Wetherby.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 26 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 3 Sep 2024 at 10:00.

Leeds City Council logo
LONG TERM
Between
23 Sep 2024 and 26 Sep 2025
Details
View Map
Share
Follow
Racecourse Approach

Leeds City Council are proposing to carry out Highway improvement works on Racecourse Approach, Wetherby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 15:10.

North Yorkshire County Council logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Deighton Gates Roundabout To County Boundary

North Yorkshire County Council are carrying out Highway improvement works on Deighton Gates Roundabout To County Boundary, Kirk Deighton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:00 and could run through until 30 November 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:59.

Leeds City Council logo
LONG TERM
Until
22 Dec 2025
Details
View Map
Share
Follow
Racecourse Approach

Leeds City Council are carrying out Highway improvement works on Racecourse Approach, Wetherby.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:30 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 25 Feb 2025 at 13:25.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Freemans Way

North Yorkshire County Council are proposing to carry out Highway improvement works on Freemans Way, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 16:35.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Hornbeam Park Avenue

North Yorkshire County Council are proposing to carry out Highway improvement works on Hornbeam Park Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 17:00.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Hornbeam Square West

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hornbeam Square West, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 17:00.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Sherwood Drive

North Yorkshire County Council are proposing to carry out Highway improvement works on Sherwood Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 16:17.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Firs Avenue

North Yorkshire County Council are proposing to carry out Highway improvement works on Firs Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 17:00.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Grimbald Crag Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Grimbald Crag Road, Knaresborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 11:15.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Haggs Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Haggs Road, Spofforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 13 Mar 2025 at 16:33.

North Yorkshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Wetherby Road

North Yorkshire County Council are proposing to carry out Works for road purposes on Wetherby Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 22 May 2025 at 14:24.

Northern Gas Networks logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Hookstone Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Hookstone Drive, Harrogate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 07:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 14:35.

Independent Water Networks logo
LONG TERM
Between
4 Aug and 20 Oct 2025
Details
View Map
Share
Follow
York Road

Independent Water Networks are proposing to carry out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Independent Water Networks on 7 May 2025 at 10:57.

Electricity Network Company logo
LONG TERM
Between
4 Aug and 20 Oct 2025
Details
View Map
Share
Follow
York Road

Electricity Network Company are proposing to carry out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 7 May 2025 at 11:05.

North Yorkshire County Council logo
LONG TERM
Between
18 Aug and 5 Dec 2025
Details
View Map
Share
Wetherby Road

North Yorkshire County Council were proposing to carry out Works for road purposes on Wetherby Road, Knaresborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 5 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 1 Jul 2025 at 11:22.

Independent Water Networks logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
York Road

Independent Water Networks are carrying out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Independent Water Networks on 26 Aug 2025 at 09:57.

Independent Water Networks logo
LONG TERM
Between
26 Aug and 21 Nov 2025
Details
View Map
Share
Follow
York Road

Independent Water Networks are proposing to carry out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Independent Water Networks on 9 Jun 2025 at 10:50.

Electricity Network Company logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
York Road

Electricity Network Company are carrying out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2025 at 09:56.

Electricity Network Company logo
LONG TERM
Between
26 Aug and 21 Nov 2025
Details
View Map
Share
Follow
York Road

Electricity Network Company are proposing to carry out Utility asset works on York Road, Wetherby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Jun 2025 at 10:54.

Yorkshire Water logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Spofforth Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Spofforth Lane, Follifoot.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 16:40 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Sep 2025 at 12:48.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prospect Road

Yorkshire Water are carrying out Utility repair and maintenance works on Prospect Road, Harrogate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 14:48 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 10:37.

North Yorkshire County Council logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Wetherby Road

North Yorkshire County Council are carrying out Works for road purposes on Wetherby Road, Knaresborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:54 and could run through until 24 November 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by North Yorkshire County Council on 15 Sep 2025 at 10:14.

North Yorkshire County Council logo
LONG TERM
Between
27 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Wetherby Road

North Yorkshire County Council are proposing to carry out Works for road purposes on Wetherby Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by North Yorkshire County Council on 1 Sep 2025 at 09:30.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Pannal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2025 at 13:44.

Northern Powergrid (Northeast) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Almsford Oval

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Almsford Oval, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Sep 2025 at 14:26.

Northern Powergrid (Northeast) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Almsford Oval

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Almsford Oval, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Sep 2025 at 16:59.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Pannal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jul 2025 at 16:55.

Northern Powergrid (Northeast) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Swindon Lane

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Swindon Lane, Kirkby Overblow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Sep 2025 at 16:16.

Northern Powergrid (Northeast) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Swindon Lane

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Swindon Lane, Kirkby Overblow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Sep 2025 at 14:37.

Yorkshire Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Fulwith Mill Lane

Yorkshire Water are proposing to carry out New service connection on Fulwith Mill Lane, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Aug 2025 at 10:00.

Quickline Commucations logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Milner Lane

Quickline Commucations are proposing to carry out Utility asset works on Milner Lane, Thorner, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2025 at 16:21.

Quickline Commucations logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Milner Lane

Quickline Commucations are proposing to carry out Utility asset works on Milner Lane, Thorner, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:46.


Roadworks Map near to St. Peters Close, WETHERBY, LS22 4FA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Peters Close, WETHERBY, LS22 4FA (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Quickline Commucations logo
MAIN STREET 
(0.3 miles)
Quickline Commucations
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 19 Sep 2025
0.3
Details
Share
Follow
2
Quickline Commucations logo
WETHERBY ROAD 
(0.6 miles)
Quickline Commucations
Utility asset works - Carriageway, Verge - Two-way signals
Planned
Scheduled: 19 Sep 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.