ROADWORKS SUMMARY
Crag Lane, LEEDS, LS17 0BW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crag Lane, LS17 0BW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crag Lane, LEEDS, LS17 0BW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crag Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Yorkshire County Council logo
LONG TERM
Between
1 Apr 2026 and 31 Mar 2027
Details
View Map
Share
Follow
Harlow Pines

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Harlow Pines, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2026 and could run through until 31 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2025 at 14:18.

Yorkshire Water logo
LONG TERM
Between
18 Jun and 30 Sep 2026
Details
View Map
Share
Follow
Castley Lane

Yorkshire Water are proposing to carry out Utility asset works on Castley Lane, Leathley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2026 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 27 Mar 2026 at 10:38.

Yorkshire Water logo
LONG TERM
Between
18 Jun and 30 Sep 2026
Details
View Map
Share
Follow
Castley Lane

Yorkshire Water are proposing to carry out Utility asset works on Castley Lane, Castley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2026 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 27 Mar 2026 at 10:37.

Yorkshire Water logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Lady Lane

Yorkshire Water are carrying out Statutory Infrastructure Works on Lady Lane, Beckwithshaw.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 June 2026 at 13:00 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 09:53.

Yorkshire Water logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Swan Road

Yorkshire Water are carrying out Utility asset works on Swan Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:55 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 10:58.

North Yorkshire County Council logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Raglan Street

North Yorkshire County Council are carrying out Highway repair and maintenance works on Raglan Street, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 20 Jul 2026 at 08:07.

Yorkshire Water logo
LONG TERM
Until
5 Dec 2026
Details
View Map
Share
Follow
Arthington Lane

Yorkshire Water are carrying out Utility asset works on Arthington Lane, Pool In Wharfedale, Otley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2026 at 09:00 and could run through until 5 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 10:07.

North Yorkshire County Council logo
LONG TERM
Between
30 Jul and 3 Dec 2026
Details
View Map
Share
Follow
Harrogate Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Harrogate Road, Leathley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 22 Jul 2026 at 09:07.

Yorkshire Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Castley Lane

Yorkshire Water are carrying out Utility asset works on Castley Lane, Castley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2026 at 09:00 and could run through until 22 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2026 at 07:09.

Northern Powergrid (Northeast) logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Howhill Quarry Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Howhill Quarry Road, Beckwithshaw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 10:19 and could run through until 16 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Sep 2026 at 08:09.

Northern Powergrid (Northeast) logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Beckwith Head Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Beckwith Head Road, Harrogate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2026 at 14:21 and could run through until 16 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Aug 2026 at 14:46.

North Yorkshire County Council logo
LONG TERM
Between
31 Aug 2026 and 31 Aug 2028
Details
View Map
Share
Follow
James Street

North Yorkshire County Council are proposing to carry out Works for road purposes on James Street, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 31 August 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 9 Jun 2026 at 10:19.

North Yorkshire County Council logo
LONG TERM
Between
31 Aug 2026 and 31 Aug 2028
Details
View Map
Share
Follow
Station Bridge

North Yorkshire County Council are proposing to carry out Works for road purposes on Station Bridge, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 31 August 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 9 Jun 2026 at 10:19.

North Yorkshire County Council logo
LONG TERM
Between
31 Aug 2026 and 31 Aug 2028
Details
View Map
Share
Follow
Albert Street

North Yorkshire County Council are proposing to carry out Works for road purposes on Albert Street, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 31 August 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 9 Jun 2026 at 10:17.

North Yorkshire County Council logo
Between
9 and 28 Sep 2026
Details
View Map
Share
Follow
Rossett Green Lane

North Yorkshire County Council are proposing to carry out Section 50 on Rossett Green Lane, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 19 Aug 2026 at 15:18.

North Yorkshire County Council logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Rossett Green Lane

North Yorkshire County Council are carrying out Section 50 on Rossett Green Lane, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 11 Sep 2026 at 09:52.

Yorkshire Water logo
LONG TERM
Between
14 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Otley Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Otley Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Jul 2026 at 10:05.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Moseley Wood Way

Northern Powergrid (Yorkshire) are carrying out New service connection on Moseley Wood Way, Cookridge, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 08:55 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Sep 2026 at 12:39.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
Follow
Barrowby Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Barrowby Lane, Kirkby Overblow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Jul 2026 at 07:48.

Northern Powergrid (Northeast) logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Queens Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Queens Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:15.

Northern Powergrid (Northeast) logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Otley Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:31.

Yorkshire Water logo
LONG TERM
Between
28 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Beckwith Head Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Beckwith Head Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2026 at 14:13.

Northern Powergrid (Northeast) logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Valley Drive

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Valley Drive, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:11.

Yorkshire Water logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Hill Foot Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hill Foot Lane, Burn Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 20:41.

Yorkshire Water logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Hill Foot Lane

Yorkshire Water were proposing to carry out New service connection on Hill Foot Lane, Burn Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:40.

Yorkshire Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Mill Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Kearby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 5 Aug 2026 at 08:45.

Northern Powergrid (Northeast) logo
Between
5 Oct and 2 Nov 2026
Details
View Map
Share
Follow
York Place

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on York Place, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:34.

Northern Powergrid (Northeast) logo
Between
12 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Leeds Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:45.

Northern Powergrid (Northeast) logo
Between
12 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Leeds Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Aug 2026 at 12:41.

Northern Powergrid (Northeast) logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Hill Foot Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Hill Foot Lane, Burn Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Aug 2026 at 06:58.

Northern Powergrid (Northeast) logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Hill Foot Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Hill Foot Lane, Burn Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Aug 2026 at 11:48.

Yorkshire Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Stairfoot Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stairfoot Lane, Alwoodley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Jul 2026 at 13:55.

Yorkshire Water logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Cornwall Road

Yorkshire Water are proposing to carry out Utility asset works on Cornwall Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:27.

Yorkshire Water logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Crescent Road

Yorkshire Water are proposing to carry out Utility asset works on Crescent Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:41.

Yorkshire Water logo
LONG TERM
Between
19 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Church Close

Yorkshire Water are proposing to carry out Utility asset works on Church Close, Pool In Wharfedale, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 13:56.

Yorkshire Water logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Royal Parade

Yorkshire Water are proposing to carry out Utility asset works on Royal Parade, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:30.

North Yorkshire County Council logo
Between
26 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Yew Tree Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Lane, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 27 Aug 2026 at 06:57.

Yorkshire Water logo
Between
2 and 29 Nov 2026
Details
View Map
Share
Follow
Beckwith Head Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Beckwith Head Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2026 at 08:19.

Yorkshire Water logo
Between
2 and 29 Nov 2026
Details
View Map
Share
Follow
Beckwith Head Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Beckwith Head Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2026 at 09:22.

Yorkshire Water logo
LONG TERM
Between
9 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Mill Lane

Yorkshire Water are proposing to carry out Utility asset works on Mill Lane, Pool In Wharfedale, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 13:55.

Yorkshire Water logo
Between
9 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Duchy Road

Yorkshire Water are proposing to carry out Utility asset works on Duchy Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2026 at 09:28.

North Yorkshire County Council logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Penny Pot Lane

North Yorkshire County Council are proposing to carry out Section 50 on Penny Pot Lane, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 15 Sep 2026 at 10:50.

Leeds City Council logo
Between
15 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Nelson Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 6 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Nov 2025 at 14:48.

Leeds City Council logo
Between
15 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Crossgate

Leeds City Council are proposing to carry out Highway repair and maintenance works on Crossgate, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 6 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Nov 2025 at 14:27.

Yorkshire Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Cornwall Road

Yorkshire Water are proposing to carry out New service connection on Cornwall Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 14:29.

Northern Powergrid (Northeast) logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Almsford Oval

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Almsford Oval, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Sep 2026 at 13:49.

Northern Powergrid (Yorkshire) logo
Between
14 and 20 Dec 2026
Details
View Map
Share
Follow
Follifoot Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Follifoot Lane, Kirkby Overblow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 13:01.


Roadworks Map near to Crag Lane, LEEDS, LS17 0BW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Sep 2026 23:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crag Lane, LEEDS, LS17 0BW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
MAJOR
  
WESCOE HILL LANE 
(1.0 miles)
Yorkshire Water
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 31 Dec 2026
1.0
Details
Share
Follow
2
Yorkshire Water logo
MAJOR
  
WESCOE HILL LANE 
(1.0 miles)
Yorkshire Water
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 31 Dec 2026
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.