ROADWORKS SUMMARY
Holme Well Road, LEEDS, LS10 4TQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Holme Well Road, LS10 4TQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Holme Well Road, LEEDS, LS10 4TQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Holme Well Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2022 at 00:01 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Oct 2024 at 14:48.

Leeds City Council logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Swinegate

Leeds City Council are carrying out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2023 at 23:01 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Oct 2023 at 11:34.

Leeds City Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Regent Street

Leeds City Council are carrying out Highway improvement works on Regent Street, Sheepscar, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leeds City Council on 10 Oct 2024 at 15:27.

Leeds City Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are carrying out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 4 Jul 2024 at 07:52.

Leeds City Council logo
LONG TERM
Between
7 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Canal Street

Leeds City Council were proposing to carry out Highway improvement works on Canal Street, Armley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2024 and run through until 1 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 2 Aug 2024 at 14:24.

Leeds City Council logo
LONG TERM
Between
7 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Armley Road

Leeds City Council are proposing to carry out Highway improvement works on Armley Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 Jun 2024 at 09:53.

Leeds City Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Canal Street

Leeds City Council are carrying out Highway repair and maintenance works on Canal Street, Armley, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2024 at 00:01 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by Leeds City Council on 13 Nov 2024 at 11:34.

Leeds City Council logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2024 at 00:01 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Sep 2024 at 13:11.

Leeds City Council logo
LONG TERM
Between
8 Aug 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are proposing to carry out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2024 and could run through until 1 January 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 7 Aug 2024 at 17:08.

Leeds City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Canal Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Canal Street, Armley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2024 and could run through until 1 December 2024. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 8 Aug 2024 at 11:42.

Leeds City Council logo
LONG TERM
Between
9 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 13 Aug 2024 at 11:22.

Leeds City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Skelton Grange Road

Leeds City Council are carrying out Highway improvement works on Skelton Grange Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 19 Aug 2024 at 10:25.

Leeds City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pontefract Road

Leeds City Council are carrying out Highway improvement works on Pontefract Road, Stourton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 19 Aug 2024 at 10:23.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Parkhill Crescent

Yorkshire Water were proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2024 at 16:21.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:12.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:24.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:22.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 28 Jun 2024 at 11:06.

Yorkshire Water logo
LONG TERM
Between
16 Sep 2024 and 28 Feb 2025
Details
View Map
Share
Church Road

Yorkshire Water were proposing to carry out Utility asset works on Church Road, Normanton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 11:40.

Yorkshire Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are carrying out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:30 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 08:40.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Marlborough Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 15:04 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:09.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bridle Street

Kirklees Council are carrying out Highway repair and maintenance works on Bridle Street, Soothill, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:51.

National Highways logo
LONG TERM
Between
9 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Ouzlewell Green

National Highways are proposing to carry out Works for road purposes on Ouzlewell Green, Lofthouse, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 30 Sep 2024 at 15:19.

National Highways logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Ouzlewell Green

National Highways are carrying out Works for road purposes on Ouzlewell Green, Lofthouse, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 15:23.

Leeds City Council logo
LONG TERM
Between
9 Oct 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Pontefract Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 10:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Lovell Park Hill

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Lovell Park Hill, Sheepscar, Leeds.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 08:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 12:15.

Northern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Cardigan Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Cardigan Lane, Burley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 11:36.

Leeds City Council logo
Finishing
Today
Details
View Map
Share
Follow
Cross Gates Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Cross Gates Road, Cross Gates, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 08:09.

Leeds City Council logo
Finishing
Today
Details
View Map
Share
Follow
York Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 07:57.

Leeds City Council logo
Finishing
Today
Details
View Map
Share
Stratford Street

Leeds City Council were proposing to carry out Highway repair and maintenance works on Stratford Street, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 11:14.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Elland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Elland Road, Beeston, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 14:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 11:55.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.

Leeds City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Water Lane

Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 00:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 09:21.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Water Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Water Lane, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 13:18 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 12:02.

Northern Gas Networks logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Leeds Road, Rothwell, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 08:58.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Clarence Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Clarence Road, Hunslet, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 11:31.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 18:20.

Leeds City Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hyde Park Road

Leeds City Council are proposing to carry out Highway improvement works on Hyde Park Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 24 Oct 2024 at 14:15.

Leeds City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Hyde Park Road

Leeds City Council are carrying out Highway improvement works on Hyde Park Road, Hyde Park, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 12:40.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.

Leeds City Council logo
Between
10 Nov and 6 Dec 2024
Details
View Map
Share
Meadow Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Meadow Road, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Oct 2024 at 14:40.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wakefield Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 11:41.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bradford Road, Gildersome, Morley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 11:44.

Yorkshire Water logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 13:39.

Yorkshire Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are carrying out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 10:33.

Leeds City Council logo
Between
11 Nov and 8 Dec 2024
Details
View Map
Share
Pontefract Lane

Leeds City Council were proposing to carry out Highway improvement works on Pontefract Lane, Richmond Hill, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 15:07.

Leeds City Council logo
Between
11 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Pontefract Lane

Leeds City Council are proposing to carry out Highway improvement works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 4 Oct 2024 at 13:56.

Leeds City Council logo
LONG TERM
Between
13 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Wrangthorn Place

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wrangthorn Place, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Sep 2024 at 08:59.

Leeds City Council logo
Between
15 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Grosvenor Road

Leeds City Council are proposing to carry out Highway improvement works on Grosvenor Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 10 Oct 2024 at 12:47.

Leeds City Council logo
Between
17 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Meadow Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Meadow Road, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Oct 2024 at 14:17.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

Leeds City Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 7 Nov 2024 at 10:43.

Leeds City Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Leeds City Council are carrying out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 11:40.

Leeds City Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 14 Nov 2024 at 15:41.

Leeds City Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Leeds City Council are carrying out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 13:23.

Leeds City Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Bradford Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Bradford Road, Gildersome, Morley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 14 Nov 2024 at 09:27.

Northern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Church Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Crescent, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 10:10.

Northern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Church Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Crescent, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 08:22.

Northern Gas Networks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Church Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Church Crescent, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 08:29.

Northern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wakefield Road, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 10:09.

Northern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wakefield Road, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 08:21.

Northern Gas Networks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Wakefield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wakefield Road, Swillington, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 08:29.

Leeds City Council logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Pontefract Lane

Leeds City Council are carrying out Highway improvement works on Pontefract Lane, Richmond Hill, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 14:59.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Silver Street

Electricity Network Company are proposing to carry out Utility asset works on Silver Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 13:47.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Silver Street

Electricity Network Company are proposing to carry out Utility asset works on Silver Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 15:01.

Leeds City Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Greenthorpe Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Greenthorpe Road, Armley, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Oct 2024 at 14:48.

Leeds City Council logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Greenthorpe Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Greenthorpe Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Oct 2024 at 15:09.

Leeds City Council logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 11 Oct 2024 at 10:34.

Leeds City Council logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Byron Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Byron Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 11 Oct 2024 at 10:34.

Northern Gas Networks logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Brander Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Brander Road, Gipton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:17.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Kirkstall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkstall Road, Burley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 29 May 2024 at 09:10.

Leeds City Council logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grosvenor Road

Leeds City Council are proposing to carry out Highway improvement works on Grosvenor Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 14:24.

Leeds City Council logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grosvenor Road

Leeds City Council are proposing to carry out Highway improvement works on Grosvenor Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 10 Oct 2024 at 10:54.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Home Lea

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Home Lea, Rothwell, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 14:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 15:10.

Northern Gas Networks logo
Between
21 Nov and 11 Dec 2024
Details
View Map
Share
Follow
New Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:03.

Northern Powergrid (Yorkshire) logo
Finishing
Thursday
Details
View Map
Share
Follow
Albany Street

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Albany Street, Armley, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 11:30 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Nov 2024 at 12:54.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Belle Isle Road

Yorkshire Water are carrying out Utility repair and maintenance works on Belle Isle Road, Belle Isle, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 11:47 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 24 Nov 2024 at 14:09.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
York Road

Yorkshire Water are carrying out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 01:35 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Nov 2024 at 10:33.

Leeds City Council logo
Between
24 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Meadow Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Meadow Road, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Nov 2024 at 10:08.

Northern Powergrid (Yorkshire) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Sep 2024 at 11:40.

Northern Powergrid (Yorkshire) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Sep 2024 at 15:49.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Cross Green Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Cross Green Lane, Cross Green, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 07:54.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Oct 2024 at 15:26.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Green Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cross Green Lane, Cross Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Oct 2024 at 14:49.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Tong Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 13:46.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Tong Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 15:03.

Leeds City Council logo
LONG TERM
Between
25 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Brudenell Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 08:28.

Leeds City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway improvement works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 18 Nov 2024 at 16:51.

Leeds City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway improvement works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 14:18.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway improvement works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 7 Nov 2024 at 10:08.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Brudenell Road

Leeds City Council were proposing to carry out Highway improvement works on Brudenell Road, Hyde Park, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 11:05.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Westfield Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westfield Terrace, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:19.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Westfield Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westfield Terrace, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 10:40.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Sandyacres Crescent

BT are proposing to carry out Utility asset works on Sandyacres Crescent, Rothwell, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Aug 2024 at 13:33.

BT logo
Finishing
Thursday
Details
View Map
Share
Sandyacres Crescent

BT were proposing to carry out Utility asset works on Sandyacres Crescent, Rothwell, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:36.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Back Shepherds Place

Yorkshire Water are proposing to carry out Utility asset works on Back Shepherds Place, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 08:21.

Northern Gas Networks logo
Between
27 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Pottery Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pottery Lane, Woodlesford, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 15:20.

National Highways logo
Between
30 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Cemetery Road

National Highways are proposing to carry out Works for road purposes on Cemetery Road, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 11:28.

National Highways logo
Between
30 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Cemetery Road

National Highways are proposing to carry out Works for road purposes on Cemetery Road, Beeston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 14:34.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 16:12.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 09:11.

Northern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Midland Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Midland Street, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:53.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Quarry Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quarry Hill, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:54.

Leeds City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Hillidge Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Hillidge Road, Hunslet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Sep 2024 at 11:51.

Northern Gas Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Burdett Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdett Terrace, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2024 at 16:16.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Back Shepherds Lane

Northern Powergrid (Yorkshire) were proposing to carry out Disconnection or alteration of supply on Back Shepherds Lane, Chapeltown, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2024 at 14:01.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Back Shepherds Lane

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Back Shepherds Lane, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Oct 2024 at 11:45.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Back Shepherds Lane

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Back Shepherds Lane, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 12:00.

Yorkshire Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hartley Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hartley Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Oct 2024 at 16:39.

Yorkshire Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hartley Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hartley Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 15:04.

Northern Gas Networks logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Oulton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oulton Lane, Woodlesford, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:53.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Scott Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:04.

Northern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Gildersome Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 11:22.

Northern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Gildersome Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 13:54.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Hungate Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hungate Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 08:23.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Hungate Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hungate Lane, Methley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 10:30.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
High Court Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on High Court Lane, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 Nov 2024 at 10:32.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
High Court Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on High Court Lane, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 12:49.

Leeds City Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
York Street

Leeds City Council are proposing to carry out Highway improvement works on York Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 10:20.

Network Rail logo
Between
19 and 31 Dec 2024
Details
View Map
Share
Follow
Osmondthorpe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Osmondthorpe Lane, Osmondthorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Jul 2024 at 08:03.

Network Rail logo
Between
19 and 31 Dec 2024
Details
View Map
Share
Follow
Osmondthorpe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Osmondthorpe Lane, Osmondthorpe, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 07:44.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:09.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 13:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Brook Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Nov 2024 at 15:12.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Brook Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 12:09.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Brook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 10:01.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Oct 2024 at 14:23.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 10:39.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Farrer Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farrer Lane, Oulton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aberford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:51.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Church Avenue

Yorkshire Water are proposing to carry out Utility asset works on Church Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 15:04.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Springbank Crescent

Yorkshire Water are proposing to carry out Utility asset works on Springbank Crescent, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:59.

Leeds City Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Newsam Green Road

Leeds City Council are proposing to carry out Highway improvement works on Newsam Green Road, Newsam Green, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 13:18.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ingram Road Distributor

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingram Road Distributor, Holbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2024 at 09:19.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Elland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Elland Road, Beeston, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 12:03.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Admiral Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Admiral Street, Hunslet, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 12:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Kirkgate

Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Marlborough Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 14:57.

Northern Powergrid (Yorkshire) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Park Cross Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Park Cross Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Oct 2024 at 09:42.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:15.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.

Leeds City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wrangthorn Place

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wrangthorn Place, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 11:56.

Leeds City Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 11:44.

Northern Powergrid (Yorkshire) logo
Between
7 and 13 Jan 2025
Details
View Map
Share
Follow
Eskdale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Eskdale Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:30.

Northern Gas Networks logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Follow
Welton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Welton Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:27.

Northern Gas Networks logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Evanston Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Evanston Avenue, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 14:00.

Northern Gas Networks logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Cardigan Fields

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 10:06.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Windsor Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:13.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Windsor Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 07:13.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 14:29.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:31.

Northern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Fleet Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fleet Lane, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.

Northern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Quarry Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quarry Hill, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:53.

Leeds City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rowland Road

Leeds City Council are proposing to carry out Highway improvement works on Rowland Road, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 09:40.

Leeds City Council logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.

Leeds City Council logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Byron Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Byron Street, Sheepscar, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Back Norwood Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Norwood Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 17:01.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 Nov 2024 at 10:28.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 12:17.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 15:59.

Yorkshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 13:07.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Upper Batley Low Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Batley Low Lane, Birstall, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:12.

Northern Gas Networks logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Cross Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cross Lane, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 14:58.

Northern Gas Networks logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Carr Crofts

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Crofts, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 13:54.

Leeds City Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Barden Mount

Leeds City Council are proposing to carry out Highway repair and maintenance works on Barden Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 31 Oct 2024 at 15:39.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 10:26.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blakey Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Blakey Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:27.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Nov 2024 at 14:21.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 13:54.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 13:07.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:01.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Spring Avenue

Yorkshire Water are proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:55.

Yorkshire Water logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:40.

Leeds City Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Barden Mount

Leeds City Council are proposing to carry out Highway improvement works on Barden Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 13:04.

Northern Gas Networks logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Back Harehills Park View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Harehills Park View, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2024 at 08:23.

Northern Gas Networks logo
Between
29 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Birstall, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 07:33.

Leeds City Council logo
Between
29 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Dewsbury Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 22 Nov 2024 at 10:44.

Leeds City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Pauls Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Pauls Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Sep 2024 at 10:43.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Albert Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Oulton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:27.

Leeds City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
The Oval

Leeds City Council were proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 31 Oct 2024 at 15:17.

Leeds City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
The Oval

Leeds City Council are proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Nov 2024 at 09:32.

Northern Gas Networks logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Thornhill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhill Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 11:50.

Leeds City Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Burton Road

Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 6 Nov 2024 at 08:49.

Leeds City Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Burton Road

Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Nov 2024 at 09:26.

Northern Powergrid (Yorkshire) logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Beech Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beech Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:43.

Northern Gas Networks logo
LONG TERM
Between
13 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Marlborough Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2024 at 15:49.

Northern Gas Networks logo
LONG TERM
Between
13 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2024 at 09:57.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
New Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:51.

Leeds City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Oakhurst Avenue

Leeds City Council are proposing to carry out Highway improvement works on Oakhurst Avenue, Beeston, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 8 Nov 2024 at 08:18.

Leeds City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Queen Street

Leeds City Council were proposing to carry out Highway repair and maintenance works on Queen Street, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 09:47.


Roadworks Map near to Holme Well Road, LEEDS, LS10 4TQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Nov 2024 03:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Holme Well Road, LEEDS, LS10 4TQ (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
RING ROAD MIDDLETON, MIDDLETON 
(0.2 miles)
Northern Gas Networks
Utility repair and maintenance works - Verge - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.2
Details
Share
Follow
2
Yorkshire Water logo
URGENT
  
RAYLANDS WAY, MIDDLETON 
(0.2 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
21 Nov 2024 22:11 - 23 Nov 2024 13:15
0.2
Details
Share
3
Leeds City Council logo
TOWN STREET, MIDDLETON 
(0.2 miles)
Leeds City Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
4
BT logo
BRYONY COURT, MIDDLETON 
(0.2 miles)
BT
New service connection - Footway - No carriageway incursion
Complete
21 Nov 2024 14:27 - 22 Nov 2024 13:01
0.2
Details
Share
5
Leeds City Council logo
MAJOR
  
MOOR FLATTS AVENUE, MIDDLETON 
(0.6 miles)
Leeds City Council
Highway improvement works - Footway - Give and take
In Progress
Since: 12 Aug 2024 09:00
(Scheduled: 12 Aug 2024 - 13 Dec 2024)
0.6
Details
Share
Follow
6
Leeds City Council logo
MOOR FLATTS AVENUE, MIDDLETON 
(0.6 miles)
Leeds City Council
Highway improvement works - Carriageway - Road closure
Cancelled
(Scheduled: 18 Nov 2024 - 25 Nov 2024)
0.6
Details
Share
7
Yorkshire Water logo
EMERGENCY
  
BELLE ISLE ROAD, BELLE ISLE 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway, Verge - Lane closure
In Progress
Since: 23 Nov 2024 11:47
(Scheduled: 23 Nov 2024 - 29 Nov 2024)
0.7
Details
Share
Follow
8
Cityfibre Metro Networks logo
LEA PARK CROFT, BELLE ISLE 
(0.9 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024
0.9
Details
Share
Follow
9
Virgin Media logo
THORPE LANE, MIDDLETON 
(1.0 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.