ROADWORKS SUMMARY
High Street, LINCOLN, LN6 9LU
Introduction

View current and future planned roadworks and road closures for High Street, LN6 9LU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to High Street, LINCOLN, LN6 9LU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
4 Dec 2025
Nottinghamshire County Council are carrying out Works for road purposes on Carlton Ferry Lane, Collingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 17:40 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 23 Apr 2025 at 08:21.
Thursday
Anglian Water are carrying out Utility repair and maintenance works on Swinderby Road, South Scarle.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 05:15 and could run through until 5 June 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 30 May 2025 at 08:26.
2 and 20 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Aubourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 16 Jan 2025 at 08:44.
2 and 20 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Aubourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 21 Jan 2025 at 14:58.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Main Street, Aubourn.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 07:15 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 08:10.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Station Road, Eagle Hall.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 08:09 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 09:00.
4 and 23 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Aubourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 18 Mar 2025 at 08:23.
4 and 23 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Haddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 21 May 2025 at 13:48.
4 and 23 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Haddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 11:21.
9 and 11 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Station Road, Eagle Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 31 Mar 2025 at 11:54.
9 and 11 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Station Road, Eagle Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 1 Apr 2025 at 07:58.
13 Jun and 8 Aug 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Warren Lane, Witham St Hughs.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 3 Jun 2025 at 07:17.
13 and 20 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on South Hykeham Road, Haddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 21 Jan 2025 at 14:58.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 6 May 2025 at 08:38.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 5 Mar 2025 at 08:06.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 21 Mar 2025 at 14:49.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on A46 From J A1138 To J A1434 Ne, Newark And Sherwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 7 May 2025 at 09:27.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on A46 From J A1138 To J A1434 Ne, Newark And Sherwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 21 Mar 2025 at 14:48.
23 and 25 Jun 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Main Street, Aubourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lincolnshire County Council on 31 Mar 2025 at 08:19.
25 and 27 Jun 2025
Anglian Water are proposing to carry out New service connection on Boundary Lane, South Hykeham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 May 2025 at 08:42.
25 Jun and 5 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cross Lane, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Apr 2025 at 15:49.
25 Jun and 5 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cross Lane, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 11:48.
27 Jun and 3 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Eagle Road, Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 27 May 2025 at 08:42.
7 and 28 Jul 2025
BT were proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 28 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 17 Feb 2025 at 11:27.
7 and 28 Jul 2025
BT were proposing to carry out Utility asset works on A46 From J A1/a17/b6166 To J A1138 Ne, Newark And Sherwood.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 28 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 17 Feb 2025 at 11:36.
7 and 18 Jul 2025
BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Mar 2025 at 09:23.
7 and 11 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Mill Moor Way, North Hykeham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 15 May 2025 at 08:31.
9 and 11 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Eagle Road, Swinderby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 May 2025 at 12:43.
11 Jul and 5 Aug 2025
Network Rail are proposing to carry out roadworks on Swinderby Road, Collingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Mar 2025 at 15:32.
14 and 18 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Butt Lane, Norton Disney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 27 May 2025 at 08:55.
16 and 22 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Earlsfield Close, Lincoln.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 29 May 2025 at 15:48.
16 and 18 Jul 2025
BT are proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 2 Jun 2025 at 13:30.
16 and 18 Jul 2025
BT are proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 9 May 2025 at 15:15.
16 and 18 Jul 2025
BT are proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 30 May 2025 at 15:10.
16 and 18 Jul 2025
BT were proposing to carry out Utility asset works on Potter Hill Road, Collingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 July 2025 and run through until 18 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 Jun 2025 at 13:21.
16 and 18 Jul 2025
BT are proposing to carry out Utility asset works on A46 From J A1138 To J A1434 Ne, Newark And Sherwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 28 May 2025 at 16:30.
16 and 18 Jul 2025
BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 28 May 2025 at 16:30.
16 and 22 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Earlsfield Close, Lincoln.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 06:36.
21 and 25 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Whisby Road, Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 11:09.
21 and 25 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Black Lane, Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 11:09.
21 and 25 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Doddington Road, Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 11:21.
21 and 25 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Black Lane, Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 23 May 2025 at 11:21.
21 and 23 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Thurlby Near Swinderby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 May 2025 at 08:19.
25 and 31 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Mill Moor Way, North Hykeham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 16 May 2025 at 14:03.
25 and 31 Jul 2025
Lincolnshire County Council are proposing to carry out Highway improvement works on Butt Lane, Norton Disney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 27 May 2025 at 08:55.
6 and 19 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Swinderby Road, Collingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:05.
11 and 13 Aug 2025
Anglian Water are proposing to carry out Remedial works on Eagle Road, Swinderby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 9 May 2025 at 12:43.
12 and 14 Aug 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Collingham Road, Swinderby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2025 and run through until 14 August 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 19 May 2025 at 10:49.
13 Aug and 1 Sep 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Newark Road, Norton Disney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 1 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 May 2025 at 08:22.
27 and 29 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Collingham Road, Swinderby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 08:59.
Roadworks Map near to High Street, LINCOLN, LN6 9LU (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to High Street, LINCOLN, LN6 9LU (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 5 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.