ROADWORKS SUMMARY
Lincoln Road, LINCOLN, LN6 8PE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lincoln Road, LN6 8PE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lincoln Road, LINCOLN, LN6 8PE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lincoln Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lincolnshire County Council logo
LONG TERM
Between
18 Aug 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are proposing to carry out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2024 and could run through until 14 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lincolnshire County Council on 14 May 2024 at 08:38.

Lincolnshire County Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are carrying out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 00:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 16 Sep 2024 at 12:31.

Lincolnshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Freeman Road

Lincolnshire County Council are carrying out Highway improvement works on Freeman Road, North Hykeham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:08 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 12 Nov 2024 at 09:14.

Cityfibre Metro Networks logo
LONG TERM
Between
7 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Newark Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Newark Road, Lincoln.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Oct 2024 at 15:53.

Lincolnshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are carrying out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 11:14 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 9 Jan 2025 at 11:17.

Lincolnshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are proposing to carry out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Dec 2024 at 10:21.

Lincolnshire County Council logo
LONG TERM
Between
10 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Tritton Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Tritton Road, Lincoln.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Lincolnshire County Council on 21 Jan 2025 at 11:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sudbrooke Drive

Cadent Gas are carrying out Utility asset works on Sudbrooke Drive, Lincoln.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 13:50 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 15:41.

Lincolnshire County Council logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
St Marys Street

Lincolnshire County Council are carrying out Highway improvement works on St Marys Street, Lincoln.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 09:55 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lincolnshire County Council on 13 Jan 2025 at 09:56.

Lincolnshire County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
St Marys Street

Lincolnshire County Council are proposing to carry out Highway improvement works on St Marys Street, Lincoln.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lincolnshire County Council on 13 Dec 2024 at 19:26.

Lincolnshire County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
St Marys Street

Lincolnshire County Council are proposing to carry out Highway improvement works on St Marys Street, Lincoln.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lincolnshire County Council on 4 Dec 2024 at 15:23.

Lincolnshire County Council logo
Until
19 Feb 2025
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are carrying out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 January 2025 at 08:40 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 22 Jan 2025 at 08:45.

Lincolnshire County Council logo
Between
22 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are proposing to carry out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 16 Jan 2025 at 08:44.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT were proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 22 Nov 2024 at 13:31.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Oct 2024 at 12:48.

Lincolnshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Coleby Street

Lincolnshire County Council are carrying out Highway improvement works on Coleby Street, Lincoln.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 17:16 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 31 Jan 2025 at 09:23.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Spring Hill

Anglian Water are carrying out Utility repair and maintenance works on Spring Hill, Lincoln.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 17:39 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Jan 2025 at 08:05.

Anglian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gresham Street

Anglian Water are carrying out Utility repair and maintenance works on Gresham Street, Lincoln.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2025 at 07:40 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Jan 2025 at 08:30.

Cadent Gas logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Laughton Way

Cadent Gas are carrying out Utility asset works on Laughton Way, Lincoln.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 08:43 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 15:41.

Lincolnshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Thurlby Road

Lincolnshire County Council are carrying out Highway improvement works on Thurlby Road, Bassingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 2 February 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 2 Feb 2025 at 13:25.

Lincolnshire County Council logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Sincil Bank

Lincolnshire County Council are proposing to carry out Highway improvement works on Sincil Bank, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 28 Jan 2025 at 07:36.

Cadent Gas logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Pelham Bridge

Cadent Gas were proposing to carry out Utility asset works on Pelham Bridge, Lincoln.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 21:08.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, North Hykeham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 15:35.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Laughton Way

Cadent Gas are proposing to carry out Utility asset works on Laughton Way, Lincoln.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 08:53.

Cadent Gas logo
Between
13 Feb and 13 Mar 2025
Details
View Map
Share
Canwick Road

Cadent Gas were proposing to carry out Utility asset works on Canwick Road, Lincoln.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 21:09.

Lincolnshire County Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Greetwell Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Greetwell Road, Greetwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the verge only.

This roadwork event was last updated by Lincolnshire County Council on 13 Nov 2024 at 09:17.

Lincolnshire County Council logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Greetwell Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Greetwell Road, Greetwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the verge only.

This roadwork event was last updated by Lincolnshire County Council on 11 Nov 2024 at 16:04.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 31 Jan 2025 at 13:53.

Lincolnshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Lincolnshire County Council are proposing to carry out Highway improvement works on High Street, Bassingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 10 Oct 2024 at 07:37.

Lincolnshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Lincolnshire County Council are proposing to carry out Highway improvement works on High Street, Bassingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 15 Oct 2024 at 15:42.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Beevor Street

Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on Beevor Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 13:07.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 14:44.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 8 Nov 2024 at 11:25.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT were proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 14 Nov 2024 at 14:08.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 15 Nov 2024 at 08:47.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
School Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on School Lane, Harmston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 10:54.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out New service connection on Main Street, Boothby Graffoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 13:12.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Gresham Street

Anglian Water are proposing to carry out New service connection on Gresham Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 09:43.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
School Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on School Lane, Harmston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 13:02.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Thesiger Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thesiger Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Aug 2024 at 08:10.

Anglian Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Rose Cottage Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Rose Cottage Lane, Coleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 09:58.

Cadent Gas logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, North Hykeham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:49.

Lincolnshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Chapel Lane

Lincolnshire County Council were proposing to carry out Highway improvement works on Chapel Lane, Lincoln.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 9 Jan 2025 at 12:04.

BT logo
Between
7 and 28 Mar 2025
Details
View Map
Share
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT were proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 28 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 23 Jan 2025 at 11:24.

BT logo
Between
7 and 28 Mar 2025
Details
View Map
Share
Follow
A46 From J A1434 To J A1138 Sw Including Roundabouts

BT are proposing to carry out Utility asset works on A46 From J A1434 To J A1138 Sw Including Roundabouts, North Kesteven.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 25 Nov 2024 at 12:39.

Anglian Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Danesgate

Anglian Water are proposing to carry out Utility repair and maintenance works on Danesgate, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:50.

Lincolnshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Lower High Street

Lincolnshire County Council are proposing to carry out Highway improvement works on Lower High Street, Waddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 13 Jan 2025 at 08:48.

Anglian Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Queen Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Queen Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 10:26.

Anglian Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Boundary Lane

Anglian Water are proposing to carry out New service connection on Boundary Lane, South Hykeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Jan 2025 at 08:20.

Anglian Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Winn Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Winn Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 08:57.

Western Power Distribution (East Midlands) logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Thesiger Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thesiger Street, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Aug 2024 at 09:44.

Lincolnshire County Council logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Lancaster Place

Lincolnshire County Council are proposing to carry out Highway improvement works on Lancaster Place, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 27 Jan 2025 at 12:18.

Lincolnshire County Council logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Lancaster Place

Lincolnshire County Council are proposing to carry out Highway improvement works on Lancaster Place, Lincoln.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Jan 2025 at 13:39.


Roadworks Map near to Lincoln Road, LINCOLN, LN6 8PE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Feb 2025 19:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lincoln Road, LINCOLN, LN6 8PE (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
MAJOR
  
ELIZABETH AVENUE 
(0.0 miles)
Anglian Water
Utility repair and maintenance works - Footway - Road closure
Planned
Scheduled: 3 Feb 2025 - 5 Feb 2025
0.0
Details
Share
Follow
2
Anglian Water logo
MAJOR
  
ELIZABETH AVENUE 
(0.0 miles)
Anglian Water
Utility repair and maintenance works - Footway - Road closure
Planned
Scheduled: 3 Feb 2025 - 5 Feb 2025
0.0
Details
Share
Follow
3
Anglian Water logo
MAJOR
  
ELIZABETH AVENUE 
(0.0 miles)
Anglian Water
Utility repair and maintenance works - Footway - Road closure
Planned
Scheduled: 3 Feb 2025 - 5 Feb 2025
0.0
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
MILL LANE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 3 Feb 2025 - 4 Apr 2025
0.6
Details
Share
Follow
5
BT logo
STATION ROAD, LINCOLNSHIRE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 31 Jan 2025 - 4 Feb 2025
0.8
Details
Share
Follow
6
Lincolnshire County Council logo
MAJOR
  
FREEMAN ROAD 
(0.8 miles)
Lincolnshire County Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 12 Nov 2024 09:08
(Scheduled: 11 Nov 2024 - 3 Feb 2025)
0.8
Details
Share
Follow
7
Anglian Water logo
REDCAR CLOSE 
(0.9 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 31 Jan 2025 - 4 Feb 2025
0.9
Details
Share
Follow
8
Virgin Media logo
BRANT ROAD 
(0.9 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 31 Jan 2025 - 4 Feb 2025
0.9
Details
Share
Follow
9
BT logo
ORCHID ROAD, LINCOLNSHIRE 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 30 Jan 2025 - 3 Feb 2025
1.0
Details
Share
Follow
10
Anglian Water logo
URGENT
  
DODDINGTON ROAD 
(1.0 miles)
Anglian Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Complete
31 Jan 2025 11:48 - 13:49
1.0
Details
Share