ROADWORKS SUMMARY
Park Road, LEICESTER, LE8 4EF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Park Road, LE8 4EF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Park Road, LEICESTER, LE8 4EF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Park Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Footpath Bridleway V69

Leicestershire County Council were proposing to carry out Highway improvement works on Footpath Bridleway V69, Huncote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2021 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Aug 2024 at 17:26.

Leicestershire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Footpath V68

Leicestershire County Council were proposing to carry out Highway improvement works on Footpath V68, Huncote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2021 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Aug 2024 at 17:26.

Leicestershire County Council logo
LONG TERM
Between
31 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgeway, Littlethorpe, Narborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 08:31.

Leicester City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Abbey Gate

Leicester City Council are carrying out Highway improvement works on Abbey Gate, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 07:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 29 Nov 2024 at 11:58.

Leicestershire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Footpath Z13

Leicestershire County Council are carrying out Highway improvement works on Footpath Z13, Glen Parva.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 16:35 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Dec 2024 at 16:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Winchester Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Winchester Avenue, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:04 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Dec 2024 at 14:19.

Leicester City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Norman Street

Leicester City Council are carrying out Highway improvement works on Norman Street, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 7 Jan 2025 at 14:28.

Leicester City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Briton Street

Leicester City Council are carrying out Highway improvement works on Briton Street, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 7 Jan 2025 at 14:30.

Leicester City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Western Road

Leicester City Council are carrying out Highway improvement works on Western Road, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 8 Jan 2025 at 16:30.

Leicester City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Freeschool Lane

Leicester City Council are carrying out Highway improvement works on Freeschool Lane, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 28 Nov 2024 at 11:44.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Linden Drive

Cadent Gas are proposing to carry out Utility asset works on Linden Drive, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:03.

Cadent Gas logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Linden Drive

Cadent Gas are carrying out Utility asset works on Linden Drive, Leicester.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 13:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:15.

Leicester City Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are carrying out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 07:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 6 Jan 2025 at 13:47.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 27 Apr 2025
Details
View Map
Share
Follow
Narborough Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 14:12.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
Narborough Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Narborough Road, Leicester.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 13:19 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Jan 2025 at 14:10.

Leicester City Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Dover Street

Leicester City Council are carrying out Highway improvement works on Dover Street, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 6 Jan 2025 at 13:48.

Leicester City Council logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 25 Oct 2024 at 09:35.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Brixham Drive

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Brixham Drive, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 19 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 14:30.

Western Power Distribution (East Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Narborough Road South

Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Narborough Road South, Leicestershire County Council, Braunstone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:56.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Melbourne Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Melbourne Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 13:18.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Main Street

Severn Trent Water are carrying out Utility repair and maintenance works on Main Street, Huncote.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2025 at 12:00 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 15:07.

Leicestershire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Shuttleworth Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shuttleworth Lane, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Nov 2024 at 14:56.

Leicestershire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Shuttleworth Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shuttleworth Lane, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Nov 2024 at 10:26.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Narborough Road

Leicester City Council are proposing to carry out Highway improvement works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 7 Nov 2024 at 12:50.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Stuart Street

Leicester City Council are proposing to carry out Highway improvement works on Stuart Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 1 Nov 2024 at 09:45.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Ashleigh Road

Leicester City Council are proposing to carry out Highway improvement works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 6 Nov 2024 at 11:45.

Leicester City Council logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Marble Street

Leicester City Council are proposing to carry out Highway improvement works on Marble Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 16 Jan 2025 at 11:48.

Leicester City Council logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Marble Street

Leicester City Council are proposing to carry out Highway improvement works on Marble Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 16 Jan 2025 at 11:37.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 12:18.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Church Gate

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Church Gate, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Church Gate

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Church Gate, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:43.

Leicester City Council logo
LONG TERM
Between
20 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Humberstone Road

Leicester City Council are proposing to carry out Highway improvement works on Humberstone Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 7 Nov 2024 at 17:25.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Main Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Street, Kilby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 16:30.

Severn Trent Water logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
London Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on London Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 11:55.

Severn Trent Water logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
London Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on London Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 09:20.

Severn Trent Water logo
Between
23 and 30 Jan 2025
Details
View Map
Share
London Road

Severn Trent Water were proposing to carry out Utility asset works on London Road, Oadby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 16:23.

Cityfibre Metro Networks logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Cityfibre Metro Networks are proposing to carry out Remedial works on London Road, Oadby, Oadby And Wigston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Dec 2024 at 16:29.

Leicester City Council logo
LONG TERM
Between
25 Jan and 5 May 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leicester City Council on 24 Jul 2024 at 10:18.

Severn Trent Water logo
Until
7 Mar 2025
Details
View Map
Share
Follow
Linden Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Linden Lane, Kirby Muxloe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 12:35.

Cadent Gas logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Hawthorne Drive

Cadent Gas are proposing to carry out Utility asset works on Hawthorne Drive, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:41.

Cadent Gas logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Hawthorne Drive

Cadent Gas are proposing to carry out Utility asset works on Hawthorne Drive, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 14:00.

Cadent Gas logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Follow
The Common

Cadent Gas are proposing to carry out Utility asset works on The Common, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:33.

Leicester City Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
St Martins

Leicester City Council are proposing to carry out Highway improvement works on St Martins, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 7 Jan 2025 at 16:18.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Halstead Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Halstead Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Dec 2024 at 13:06.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Asfordby Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asfordby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 11:21.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 15:45.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 14:51.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mere Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 14:46.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 11:35.

Leicester City Council logo
Between
2 and 16 Feb 2025
Details
View Map
Share
Follow
Narborough Road

Leicester City Council are proposing to carry out Highway improvement works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Jan 2025 at 14:21.

Leicester City Council logo
Between
2 and 16 Feb 2025
Details
View Map
Share
Follow
Ashleigh Road

Leicester City Council are proposing to carry out Highway improvement works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Jan 2025 at 14:06.

Severn Trent Water logo
Between
2 and 6 Feb 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 14:04.

Leicestershire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsway

Leicestershire County Council are proposing to carry out Highway improvement works on Kingsway, Braunstone Town.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 14:36.

Leicestershire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsway

Leicestershire County Council are proposing to carry out Highway improvement works on Kingsway, Braunstone Town.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Dec 2024 at 09:26.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Romway Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Romway Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 09:21.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Romway Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Romway Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 09:47.

Severn Trent Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Halstead Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Halstead Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 15:30.

Severn Trent Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Asfordby Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asfordby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 15:31.

Severn Trent Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 15:30.

Severn Trent Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 15:28.

Severn Trent Water logo
Between
4 and 12 Feb 2025
Details
View Map
Share
Follow
Wokingham Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wokingham Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 10:23.

Severn Trent Water logo
Between
4 and 12 Feb 2025
Details
View Map
Share
Wokingham Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Wokingham Avenue, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 12:54.

Severn Trent Water logo
Between
9 and 20 Feb 2025
Details
View Map
Share
Follow
Halstead Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Halstead Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 14:35.

Severn Trent Water logo
Between
9 and 20 Feb 2025
Details
View Map
Share
Follow
Asfordby Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asfordby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 14:47.

Severn Trent Water logo
Between
9 and 20 Feb 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 14:42.

Severn Trent Water logo
Between
9 and 20 Feb 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 14:40.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Main Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Street, Willoughby Waterleys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 17:56.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Evington Lane

Cadent Gas are proposing to carry out Utility asset works on Evington Lane, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 15:32.

Cadent Gas logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Coplow Avenue

Cadent Gas are proposing to carry out Utility asset works on Coplow Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 10:27.

Cadent Gas logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Highway Road

Cadent Gas are proposing to carry out Utility asset works on Highway Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 10:28.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Clarence Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarence Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 10:06.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Clarence Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Clarence Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 13:27.

Leicestershire County Council logo
Between
12 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Shuttleworth Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shuttleworth Lane, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Dec 2024 at 12:16.

Leicestershire County Council logo
Between
12 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Shuttleworth Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shuttleworth Lane, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Jan 2025 at 10:13.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Willoughby Road

Cadent Gas are proposing to carry out Utility asset works on Willoughby Road, Countesthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:56.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Cadent Gas are proposing to carry out Utility asset works on Winchester Road, Countesthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:56.

Cadent Gas logo
Between
15 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Stoughton Drive

Cadent Gas are proposing to carry out Utility asset works on Stoughton Drive, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 15:37.

Cadent Gas logo
Between
15 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Wakerley Road

Cadent Gas are proposing to carry out Utility asset works on Wakerley Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:57.

Leicester City Council logo
LONG TERM
Between
16 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Stuart Street

Leicester City Council are proposing to carry out Highway improvement works on Stuart Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Jan 2025 at 13:54.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Central Street

Cadent Gas were proposing to carry out Remedial works on Central Street, Countesthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 08:47.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgeway, Littlethorpe, Narborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgeway, Littlethorpe, Narborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 13:16.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Glen Parva.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Oct 2024 at 13:44.

Leicestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Glen Parva.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Oct 2024 at 09:40.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Avenue Road Extension

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Avenue Road Extension, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 10:59.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Avenue Road Extension

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Avenue Road Extension, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 11:33.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Lineker Road

Severn Trent Water are proposing to carry out New service connection on Lineker Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 14:20.

Leicester City Council logo
Between
17 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Stuart Street

Leicester City Council are proposing to carry out Highway improvement works on Stuart Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Jan 2025 at 14:30.

Severn Trent Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Melbourne Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Melbourne Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 13:08.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Rutland Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Rutland Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 10:33.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 11:43.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 16:01.

Severn Trent Water logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
London Road

Severn Trent Water are proposing to carry out Utility asset works on London Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:13.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Sackville Gardens

Cadent Gas are proposing to carry out Utility asset works on Sackville Gardens, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:10.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 11:51.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ratcliffe Road

Cadent Gas are proposing to carry out Utility asset works on Ratcliffe Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:10.

Cadent Gas logo
Between
24 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Newstead Road

Cadent Gas are proposing to carry out Utility asset works on Newstead Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:42.

Severn Trent Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Linden Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Linden Lane, Kirby Muxloe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 15:56.

Severn Trent Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Constance Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Constance Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 14:56.

Severn Trent Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Constance Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Constance Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 11:46.

Leicester City Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Garland Crescent

Leicester City Council are proposing to carry out Highway improvement works on Garland Crescent, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 15 Jan 2025 at 14:58.

Severn Trent Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Wellington Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 03:01.

Leicestershire County Council logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Shuttleworth Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shuttleworth Lane, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Dec 2024 at 12:16.

Severn Trent Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Wokingham Avenue

Severn Trent Water are proposing to carry out Remedial works on Wokingham Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 15:39.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Elms Road

Cadent Gas are proposing to carry out Utility asset works on Elms Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:04.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:13.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Paton Street

Leicester City Council are proposing to carry out Highway improvement works on Paton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:44.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Gaul Street

Leicester City Council are proposing to carry out Highway improvement works on Gaul Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:46.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Roman Street

Leicester City Council are proposing to carry out Highway improvement works on Roman Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:45.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Saxon Street

Leicester City Council are proposing to carry out Highway improvement works on Saxon Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:45.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Celt Street

Leicester City Council are proposing to carry out Highway improvement works on Celt Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:44.

Leicester City Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Ruding Road

Leicester City Council are proposing to carry out Highway improvement works on Ruding Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 15 Oct 2024 at 09:44.

Severn Trent Water logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Narborough Road

Severn Trent Water are proposing to carry out New service connection on Narborough Road, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 10:36.

Severn Trent Water logo
Between
7 and 9 Mar 2025
Details
View Map
Share
Wellington Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Wellington Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 9 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 15:56.

Leicestershire County Council logo
Between
9 and 11 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgeway, Littlethorpe, Narborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Jan 2025 at 15:28.

Telefonica UK logo
Between
10 and 26 Mar 2025
Details
View Map
Share
Follow
Florence Wragg Way

Telefonica UK are proposing to carry out Utility asset works on Florence Wragg Way, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 2 Jan 2025 at 14:41.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:26.

Cadent Gas logo
Between
10 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Eton Close

Cadent Gas are proposing to carry out Utility asset works on Eton Close, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 15:16.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:58.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Northcote Road

Cadent Gas are proposing to carry out Utility asset works on Northcote Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:10.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Stanfell Road

Cadent Gas are proposing to carry out Utility asset works on Stanfell Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:30.

Leicester City Council logo
Between
10 Mar and 7 Apr 2025
Details
View Map
Share
Knighton Drive

Leicester City Council were proposing to carry out Highway improvement works on Knighton Drive, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 16 Jan 2025 at 14:46.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:41.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 09:39.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are proposing to carry out Utility asset works on Gainsborough Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:30.

Severn Trent Water logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Hospital Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hospital Lane, Blaby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 10:01.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
The Newry

Cadent Gas are proposing to carry out Utility asset works on The Newry, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 10:06.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:10.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:10.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Northcote Road

Cadent Gas are proposing to carry out Utility asset works on Northcote Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 10:38.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Stanfell Road

Cadent Gas are proposing to carry out Utility asset works on Stanfell Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:40.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are proposing to carry out Utility asset works on Gainsborough Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:39.

Severn Trent Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Applegate

Severn Trent Water were proposing to carry out Utility asset works on Applegate, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 12:52.

Severn Trent Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Portland Towers

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Portland Towers, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 16:21.

Severn Trent Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Portland Towers

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Portland Towers, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Jan 2025 at 08:49.

BT logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Wigston Road

BT are proposing to carry out Utility repair and maintenance works on Wigston Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jan 2025 at 16:29.

Cadent Gas logo
Between
22 and 30 Mar 2025
Details
View Map
Share
Green Lane

Cadent Gas were proposing to carry out Remedial works on Green Lane, Countesthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 March 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:09.

Cadent Gas logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Main Street

Cadent Gas were proposing to carry out Remedial works on Main Street, Countesthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:13.

Cadent Gas logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Main Street

Cadent Gas are proposing to carry out Remedial works on Main Street, Countesthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 18:51.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Lutterworth Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lutterworth Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Jan 2025 at 10:57.

Cadent Gas logo
Between
24 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Pendlebury Drive Footpaths

Cadent Gas are proposing to carry out Utility asset works on Pendlebury Drive Footpaths, Leicester.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 March 2025 and could run through until 14 April 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 16:05.

Cadent Gas logo
Between
24 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:03.

Cadent Gas logo
Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Craighill Road

Cadent Gas are proposing to carry out Utility asset works on Craighill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:18.

Cadent Gas logo
Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Knighton Road

Cadent Gas are proposing to carry out Utility asset works on Knighton Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:45.

Severn Trent Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Earl Shilton Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Earl Shilton Road, Thurlaston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 08:45.

Cadent Gas logo
Between
29 Mar and 7 Apr 2025
Details
View Map
Share
Green Lane

Cadent Gas were proposing to carry out Remedial works on Green Lane, Countesthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 15:50.

Cadent Gas logo
Between
29 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Remedial works on Green Lane, Countesthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 16:05.

Cadent Gas logo
Between
31 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Northcote Road

Cadent Gas are proposing to carry out Utility asset works on Northcote Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 14:30.

Leicester City Council logo
Between
31 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Knighton Drive

Leicester City Council are proposing to carry out Highway improvement works on Knighton Drive, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 16 Jan 2025 at 14:45.

Severn Trent Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Rutland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rutland Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 12:13.

Severn Trent Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Clarence Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarence Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 10:40.

Severn Trent Water logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Kings Newton Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kings Newton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Jan 2025 at 10:53.

Western Power Distribution (East Midlands) logo
Between
12 and 27 Apr 2025
Details
View Map
Share
Follow
Ashleigh Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Nov 2024 at 10:07.

Severn Trent Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Narborough Road

Severn Trent Water are proposing to carry out New service connection on Narborough Road, Cosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 14:23.

Leicestershire County Council logo
Between
14 Apr and 4 May 2025
Details
View Map
Share
Follow
Bull Head Street

Leicestershire County Council are proposing to carry out Highway improvement works on Bull Head Street, Wigston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Jan 2025 at 14:16.

Severn Trent Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Goldhill Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Goldhill Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 15:33.

Severn Trent Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Earl Shilton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Earl Shilton Road, Thurlaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 11:30.

Western Power Distribution (East Midlands) logo
Between
15 and 27 Apr 2025
Details
View Map
Share
Follow
Leicester Lane

Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Leicester Lane, Leicestershire County Council, Enderby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 13:56.

Western Power Distribution (East Midlands) logo
Between
15 and 27 Apr 2025
Details
View Map
Share
Follow
Leicester Lane

Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Leicester Lane, Leicestershire County Council, Enderby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Nov 2024 at 12:36.

Western Power Distribution (East Midlands) logo
Between
15 and 20 Apr 2025
Details
View Map
Share
Follow
Leicester Lane

Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Leicester Lane, Leicestershire County Council, Enderby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 20 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 13:16.


Roadworks Map near to Park Road, LEICESTER, LE8 4EF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 19 Jan 2025 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Park Road, LEICESTER, LE8 4EF (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
THE NOOK 
(0.5 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Give and take
Complete
9 Jan 2025 13:00 - 17 Jan 2025 18:29
0.5
Details
Share
2
Leicestershire County Council logo
MAJOR
  
FOOTPATH Z13 
(0.6 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 14 Oct 2024 16:35
(Scheduled: 14 Oct 2024 - 20 Jan 2025)
0.6
Details
Share
Follow
3
Leicester City Council logo
SONNING WAY FOOTPATH 
(0.7 miles)
Leicester City Council
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
17 Jan 2025 15:00 - 15:15
0.7
Details
Share
4
Western Power Distribution (East Midlands) logo
URGENT
  
FEATHERSTONE DRIVE 
(0.9 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 7 Jan 2025 22:41
(Scheduled: 7 Jan 2025 - 20 Jan 2025)
0.9
Details
Share
Follow
5
Leicester City Council logo
TWICKENHAM ROAD 
(0.9 miles)
Leicester City Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Jan 2025 16:00 - 16:15
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.