ROADWORKS SUMMARY
Luke Jackson Way, MARKFIELD, LE67 9DA
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Luke Jackson Way, LE67 9DA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Luke Jackson Way, MARKFIELD, LE67 9DA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Luke Jackson Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
13 Sep 2025
Leicestershire County Council are carrying out Highway improvement works on Footpath R50, Ratby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 February 2022 at 00:00 and could run through until 13 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 30 Jul 2024 at 11:26.
4 Mar 2025
Leicestershire County Council are carrying out Highway improvement works on Main Street, Thornton, Bagworth And Thornton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 00:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 26 Jan 2024 at 12:06.
20 Mar 2024 and 20 Mar 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Moore Road, Ellistown And Battleflat.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 March 2024 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 08:42.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.
24 Mar 2025
Leicestershire County Council are carrying out Highway improvement works on Bagworth Road, Newbold Heath, Newbold Verdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 00:00 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Feb 2025 at 10:36.
Tomorrow
Severn Trent Water are carrying out Utility repair and maintenance works on Ravenstone Road, Heather.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 December 2024 at 16:00 and could run through until 17 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 13:12.
2 Apr 2025
Leicestershire County Council are carrying out Highway improvement works on Bagworth Road, Barlestone.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 January 2025 at 08:14 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 9 Jan 2025 at 09:18.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Swannymote Road, Belton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 February 2025 at 08:50 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 10:05.
13 Feb and 7 Apr 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Stoney Lane, Markfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 7 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 09:36.
15 and 27 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Desford Lane, Ratby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 5 Aug 2024 at 15:06.
23 Feb 2025
Leicestershire County Council are carrying out Highway improvement works on Ratby Lane, Kirby Muxloe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 09:49 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Feb 2025 at 09:56.
15 and 27 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Ratby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 5 Aug 2024 at 15:06.
23 Feb 2025
Leicestershire County Council are carrying out Highway improvement works on Main Street, Ratby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 09:49 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Feb 2025 at 09:56.
23 Feb 2025
Leicestershire County Council are carrying out Highway improvement works on Desford Lane, Ratby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 09:49 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Feb 2025 at 09:56.
23 Feb 2025
Leicestershire County Council are carrying out Highway improvement works on Station Road, Ratby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 09:49 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Feb 2025 at 09:56.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
17 Feb and 7 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Beveridge Lane, Ellistown And Battleflat.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Feb 2025 at 15:26.
17 Feb and 16 Apr 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forest Road, Markfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 09:16.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Nov 2024 at 11:27.
17 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 16:18.
Saturday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Central Road, Hugglescote Donington Le Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 14:52.
24 Feb and 30 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on St Saviours Road, Coalville.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.
24 Feb and 30 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on St Saviours Road, Coalville.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 10 Feb 2025 at 16:56.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Woodhouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 10:26.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Woodhouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 17:56.
27 Feb and 1 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Nanpantan Road, Loughborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Jan 2025 at 12:06.
28 Feb and 23 Mar 2025
Leicestershire County Council are proposing to carry out Remedial works on Peckleton Lane, Desford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 29 Jan 2025 at 15:46.
28 Feb and 23 Mar 2025
Leicestershire County Council are proposing to carry out Remedial works on Peckleton Lane, Desford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 29 Jan 2025 at 13:36.
4 and 6 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 14:58.
7 and 9 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Jan 2025 at 14:46.
10 and 14 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Church Lane, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 Jan 2025 at 17:34.
10 and 14 Mar 2025
Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on Church Lane, Whitwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 3 Feb 2025 at 12:52.
11 and 13 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Belvoir Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 14:04.
24 and 27 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Whitcrofts Lane, Ulverscroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 29 Jan 2025 at 12:57.
24 and 27 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Whitcrofts Lane, Ulverscroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 5 Feb 2025 at 11:16.
24 Mar and 6 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:52.
28 Mar and 27 Apr 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Highfield Street, Coalville.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.
31 Mar and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Glenfield Lane, Kirby Muxloe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:22.
31 Mar and 16 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ratby Lane, Kirby Muxloe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:24.
7 and 29 Apr 2025
Severn Trent Water are proposing to carry out Utility asset works on Beveridge Lane, Ellistown And Battleflat.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 11:56.
12 and 27 Apr 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Highfield Street, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.
14 Apr and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Danehill, Ratby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 15:16.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Ferndale Drive, Ratby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 15:16.
14 Apr and 16 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forest Road, Markfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Jan 2025 at 11:36.
14 and 16 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 17:26.
21 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Ingle Drive, Ratby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 15:16.
22 and 24 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Abbey Road, Charley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 31 Jan 2025 at 17:33.
22 and 25 Apr 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bardon Road, Bardon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 14:16.
22 and 25 Apr 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bardon Road, Bardon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 16:06.
28 Apr and 15 May 2025
Cadent Gas are proposing to carry out Utility asset works on Wesley Close, Ratby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 15:16.
28 Apr and 16 Jun 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bagworth Road, Barlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Feb 2025 at 14:16.
28 Apr and 16 Jun 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bagworth Road, Barlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Feb 2025 at 14:56.
6 and 8 May 2025
BT are proposing to carry out Utility repair and maintenance works on Abbey Road, Charley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Feb 2025 at 12:03.
6 and 9 May 2025
Severn Trent Water are proposing to carry out Utility asset works on Forest Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Feb 2025 at 17:49.
12 May and 5 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Nicholas Drive, Ratby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 09:36.
Roadworks Map near to Luke Jackson Way, MARKFIELD, LE67 9DA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Luke Jackson Way, MARKFIELD, LE67 9DA (3 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.