ROADWORKS SUMMARY
Otter Close, IBSTOCK, LE67 6AQ
Introduction
View current and future planned roadworks and road closures for Otter Close, LE67 6AQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Otter Close, IBSTOCK, LE67 6AQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Otter Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Jan 2025
Severn Trent Water are carrying out Utility asset works on Footpath S39, Barlestone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 July 2023 at 10:30 and could run through until 25 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Severn Trent Water on 20 Oct 2023 at 12:36.
4 Mar 2025
Leicestershire County Council are carrying out Highway improvement works on Main Street, Thornton, Bagworth And Thornton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 00:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 26 Jan 2024 at 12:06.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.
12 Sep and 3 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Corkscrew Lane, Farm Town, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 2 Sep 2024 at 08:46.
12 Sep and 3 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Corkscrew Lane, Farm Town, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 5 Jul 2024 at 09:56.
24 Feb 2025
Leicestershire County Council are carrying out Highway improvement works on Bagworth Road, Newbold Heath, Newbold Verdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 00:00 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 18 Sep 2024 at 13:06.
23 Sep and 29 Nov 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Beveridge Lane, Ellistown And Battleflat.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 24 Jul 2024 at 15:17.
Sunday
Severn Trent Water are carrying out Utility repair and maintenance works on Jeffcoats Lane, Swannington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 October 2024 at 09:00 and could run through until 24 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 16:16.
Today
Leicestershire County Council are proposing to carry out Highway improvement works on Mantle Lane, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Oct 2024 at 10:16.
Today
Severn Trent Water are carrying out Utility asset works on Main Street, Thornton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 09:44.
Today
Severn Trent Water are proposing to carry out Utility asset works on Main Street, Thornton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 15:56.
Today
Severn Trent Water are carrying out Utility asset works on Merrylees Road, Thornton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 09:44.
Today
Severn Trent Water are proposing to carry out Utility asset works on Merrylees Road, Thornton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 15:56.
Today
Leicestershire County Council are carrying out Highway improvement works on Main Street, Nailstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 16:16 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 16:36.
Today
Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Nailstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 5 Nov 2024 at 16:36.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Newbold Road, Barlestone.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 13:03 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:53.
Thursday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Gracedieu Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 14:31.
Thursday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Gracedieu Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 16:56.
2 and 4 Dec 2024
Severn Trent Water were proposing to carry out New service connection on Gracedieu Road, Coalville.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 13:13.
2 and 4 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cliffe Lane, Markfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 09:50.
2 and 4 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on From A511 Ashby Road To The Moorlands, Ravenstone With Snibston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:59.
7 and 15 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Mill Lane, Heather.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 6 Nov 2024 at 10:26.
9 and 14 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Aug 2024 at 10:56.
9 and 15 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Warren Hills Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.
9 and 15 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.
9 and 11 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Church Road, Nailstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Nov 2024 at 14:56.
9 and 11 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Church Road, Nailstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Sep 2024 at 14:26.
16 and 18 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Nov 2024 at 15:02.
16 and 18 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Oct 2024 at 12:36.
2 and 6 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Central Road, Hugglescote Donington Le Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 6 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 11:29.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Barton Road, Market Bosworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:56.
6 and 8 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 08:52.
6 and 8 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 09:25.
7 and 9 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cliffe Lane, Markfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 11:56.
7 and 9 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 12:56.
7 and 9 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 12:46.
13 and 24 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Tamworth Road, Ashby-de-la-zouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 11:31.
13 and 28 Jan 2025
BT are proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 14:22.
13 and 28 Jan 2025
BT are proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 14:25.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Central Road, Hugglescote Donington Le Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 15:06.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Central Road, Hugglescote Donington Le Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 12:36.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Snarestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 12:01.
13 and 15 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Snarestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 12:39.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Harcourt Spinney, Market Bosworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:56.
20 and 25 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.
20 and 22 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Swannington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:56.
20 and 25 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Warren Hills Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.
20 and 25 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Market Bosworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:56.
29 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on From A511 Ashby Road To The Moorlands, Ravenstone With Snibston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:06.
31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Raunstone Close, Ravenstone With Snibston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 31 January 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 12:21.
4 and 6 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Oaks Road, Charley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:56.
7 and 11 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Ravenstone Road, Heather.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
Roadworks Map near to Otter Close, IBSTOCK, LE67 6AQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Otter Close, IBSTOCK, LE67 6AQ (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.