ROADWORKS SUMMARY
Main Street, ASHBY-DE-LA-ZOUCH, LE65 1RQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Main Street, LE65 1RQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Main Street, ASHBY-DE-LA-ZOUCH, LE65 1RQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The works started on 27 November 2023 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 16:36.

Severn Trent Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are carrying out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The works started on 22 January 2024 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 16:36.

Leicestershire County Council logo
LONG TERM
Between
31 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.

Severn Trent Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Layby Off B5324 Westbound Ashby Road

Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Feb 2025 at 16:15.

National Highways logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Ashby Road

National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 20:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jan 2025 at 16:53.

Severn Trent Water logo
LONG TERM
Between
2 Dec 2024 and 30 May 2025
Details
View Map
Share
Follow
From Main Street To Moor Lane

Severn Trent Water are proposing to carry out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 30 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 11:56.

Severn Trent Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
From Main Street To Moor Lane

Severn Trent Water are carrying out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.

These works are categorised as Major.

The works started on 9 December 2024 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 09:22.

Severn Trent Water logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are carrying out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Feb 2025 at 15:45.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are proposing to carry out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 17:26.

Severn Trent Water logo
LONG TERM
Between
12 Feb and 13 May 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 10:50.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 27 Nov 2024 at 11:27.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
LONG TERM
Between
24 Feb and 30 Mar 2025
Details
View Map
Share
Follow
St Saviours Road

Leicestershire County Council are proposing to carry out Highway improvement works on St Saviours Road, Coalville.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 14:56.

Leicestershire County Council logo
LONG TERM
Between
24 Feb and 30 Mar 2025
Details
View Map
Share
Follow
St Saviours Road

Leicestershire County Council are proposing to carry out Highway improvement works on St Saviours Road, Coalville.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
6 Apr 2025
Details
View Map
Share
Follow
Fairway Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Fairway Road, Shepshed.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 17:19 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Mar 2025 at 08:29.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Fairway Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fairway Road, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 17:26.

LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Ingleberry Road

GTC Pipelines are proposing to carry out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 16 Dec 2024 at 17:26.

Severn Trent Water logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Robinsons Hill

Severn Trent Water were proposing to carry out Utility asset works on Robinsons Hill, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 14:41.

Leicestershire County Council logo
Until
4 Apr 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are carrying out Highway improvement works on Loughborough Road, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 10:58 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 20 Mar 2025 at 11:16.

Connect Fibre (Fibre Assets) logo
Finishing
Wednesday
Details
View Map
Share
Nottingham Road

Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on Nottingham Road, Peggs Green, Coleorton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 3 Feb 2025 at 10:34.

Connect Fibre (Fibre Assets) logo
Finishing
Wednesday
Details
View Map
Share
Tugbys Lane

Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on Tugbys Lane, Peggs Green, Coleorton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 10 Mar 2025 at 14:54.

Connect Fibre (Fibre Assets) logo
Finishing
Friday
Details
View Map
Share
Follow
Breedon Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 Jan 2025 at 15:00.

Connect Fibre (Fibre Assets) logo
Finishing
Friday
Details
View Map
Share
Follow
Breedon Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 7 Feb 2025 at 13:23.

Connect Fibre (Fibre Assets) logo
Finishing
Friday
Details
View Map
Share
Follow
Breedon Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 17 Mar 2025 at 10:58.

Cadent Gas logo
Between
24 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Broom Leys Road

Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:52.

Cadent Gas logo
Between
24 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Broom Leys Road

Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 14:47.

Leicestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ferrers Close

Leicestershire County Council are proposing to carry out Highway improvement works on Ferrers Close, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 09:56.

Leicestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ferrers Close

Leicestershire County Council are proposing to carry out Highway improvement works on Ferrers Close, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Feb 2025 at 17:56.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Weston-on-trent, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Mar 2025 at 14:33.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Babelake Street

Severn Trent Water are proposing to carry out New service connection on Babelake Street, Packington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 14:49.

Leicestershire County Council logo
LONG TERM
Between
28 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Highfield Street

Leicestershire County Council are proposing to carry out Highway improvement works on Highfield Street, Coalville.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.

Severn Trent Water logo
Between
28 Mar and 10 Apr 2025
Details
View Map
Share
Ashby Road Central

Severn Trent Water were proposing to carry out Statutory Infrastructure Works on Ashby Road Central, Shepshed.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Mar 2025 at 11:20.

LONG TERM
Between
28 Mar and 13 May 2025
Details
View Map
Share
Follow
Ingleberry Road

GTC Pipelines are proposing to carry out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 13 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 4 Mar 2025 at 16:30.

Severn Trent Water logo
Between
28 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 14 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 09:46.

Severn Trent Water logo
Between
28 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 14 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 14:48.

Western Power Distribution (East Midlands) logo
Between
30 Mar and 2 Apr 2025
Details
View Map
Share
Follow
South Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on South Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Feb 2025 at 13:41.

Western Power Distribution (East Midlands) logo
Between
30 Mar and 2 Apr 2025
Details
View Map
Share
Follow
South Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on South Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Feb 2025 at 15:59.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Penn Lane

Severn Trent Water were proposing to carry out Utility asset works on Penn Lane, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:53.

Severn Trent Water logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Selina Street

Severn Trent Water were proposing to carry out Utility asset works on Selina Street, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.

Cadent Gas logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Pack Horse Road

Cadent Gas are proposing to carry out Utility asset works on Pack Horse Road, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:44.

Cadent Gas logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Pack Horse Road

Cadent Gas are proposing to carry out Utility asset works on Pack Horse Road, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 14:08.

Severn Trent Water logo
LONG TERM
Between
11 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 21 Mar 2025 at 08:18.

Severn Trent Water logo
LONG TERM
Between
11 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 11:12.

Between
12 and 17 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Feb 2025 at 15:56.

Leicestershire County Council logo
Between
12 and 27 Apr 2025
Details
View Map
Share
Follow
Highfield Street

Leicestershire County Council are proposing to carry out Highway improvement works on Highfield Street, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 14:06.

Between
12 and 17 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Jan 2025 at 12:28.

Severn Trent Water logo
LONG TERM
Between
14 Apr and 24 Jun 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 14:42.

Severn Trent Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Meadow Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 17:26.

Severn Trent Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 16:03.

Severn Trent Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Apiary Gate

Severn Trent Water were proposing to carry out roadworks on Apiary Gate, Castle Donington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 13:56.

Severn Trent Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Market Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Market Street, Castle Donington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 09:45.

Cadent Gas logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Follow
Pack Horse Road

Cadent Gas are proposing to carry out Utility asset works on Pack Horse Road, Melbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:23.

Western Power Distribution (East Midlands) logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Mar 2025 at 15:17.

Western Power Distribution (East Midlands) logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Mar 2025 at 13:00.

BT logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Abbey Road

BT are proposing to carry out Utility repair and maintenance works on Abbey Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 31 Jan 2025 at 17:33.

Leicestershire County Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Mantle Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Mantle Lane, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 17 Mar 2025 at 12:06.

Leicestershire County Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Mantle Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Mantle Lane, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 21 Feb 2025 at 17:56.

Severn Trent Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Packington Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower Packington Road, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Feb 2025 at 16:16.

Severn Trent Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Packington Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower Packington Road, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 10:36.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
From A0512 Ashby Road To The Moorlands

BT are proposing to carry out Utility repair and maintenance works on From A0512 Ashby Road To The Moorlands, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Jan 2025 at 17:45.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
From A0512 Ashby Road To The Moorlands

BT are proposing to carry out Utility repair and maintenance works on From A0512 Ashby Road To The Moorlands, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Feb 2025 at 13:22.

Severn Trent Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Old Gate Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Old Gate Avenue, Weston-on-trent, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Feb 2025 at 11:11.

Severn Trent Water logo
Between
6 and 9 May 2025
Details
View Map
Share
Forest Road

Severn Trent Water were proposing to carry out Utility asset works on Forest Road, Coalville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Feb 2025 at 14:42.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Worthington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 15:57.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:39.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 15:56.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:37.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 15:47.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:45.

BT logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Abbey Road

BT are proposing to carry out Utility repair and maintenance works on Abbey Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 20 Feb 2025 at 11:32.

Leicestershire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Breedon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 10:56.

Leicestershire County Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Hallamford Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hallamford Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Feb 2025 at 12:56.

Cadent Gas logo
Between
19 May and 5 Jun 2025
Details
View Map
Share
Follow
Pack Horse Road

Cadent Gas are proposing to carry out Utility asset works on Pack Horse Road, Melbourne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:33.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Hastings Street

BT are proposing to carry out Utility repair and maintenance works on Hastings Street, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Feb 2025 at 17:52.

Cadent Gas logo
LONG TERM
Between
26 May and 28 Jul 2025
Details
View Map
Share
Follow
The Woodlands

Cadent Gas are proposing to carry out Utility asset works on The Woodlands, Melbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:36.

Severn Trent Water logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Weston-on-trent, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Mar 2025 at 11:56.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Abbey Road

BT are proposing to carry out Utility repair and maintenance works on Abbey Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Feb 2025 at 10:43.

Severn Trent Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Belvoir Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Belvoir Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Feb 2025 at 15:01.

Leicestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Drypot Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Drypot Lane, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 17 Mar 2025 at 12:06.

Leicestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Drypot Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Drypot Lane, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 14 Mar 2025 at 11:46.


Roadworks Map near to Main Street, ASHBY-DE-LA-ZOUCH, LE65 1RQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Main Street, ASHBY-DE-LA-ZOUCH, LE65 1RQ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Connect Fibre (Fibre Assets) logo
BULL HILL 
(0.2 miles)
Connect Fibre (Fibre Assets)
Utility repair and maintenance works - Carriageway, Verge - Two-way signals
In Progress
Since: 21 Mar 2025 08:50
(Scheduled: 21 Mar 2025 - 25 Mar 2025)
0.2
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.