ROADWORKS SUMMARY
Bradgate Road, LEICESTER, LE6 0HD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bradgate Road, LE6 0HD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bradgate Road, LEICESTER, LE6 0HD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bradgate Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
13 Sep 2025
Details
View Map
Share
Follow
Footpath R50

Leicestershire County Council are carrying out Highway improvement works on Footpath R50, Ratby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2022 at 00:00 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Jul 2024 at 11:26.

Leicestershire County Council logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are carrying out Highway improvement works on Main Street, Thornton, Bagworth And Thornton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2023 at 00:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 26 Jan 2024 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
1 Jul 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Cossington Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Lane, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 22 Nov 2024 at 10:26.

Leicestershire County Council logo
LONG TERM
Between
1 Jul 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Cossington Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Lane, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 22 Nov 2024 at 10:26.

Leicestershire County Council logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are carrying out Highway improvement works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 00:00 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jul 2024 at 07:06.

Leicestershire County Council logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Hallfields Lane

Leicestershire County Council are carrying out Highway improvement works on Hallfields Lane, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 00:00 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jul 2024 at 07:06.

Leicester City Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Abbey Gate

Leicester City Council are carrying out Highway improvement works on Abbey Gate, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 07:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 17 Sep 2024 at 16:15.

Leicester City Council logo
LONG TERM
Between
16 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Abbey Gate

Leicester City Council are proposing to carry out Highway improvement works on Abbey Gate, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 17 Jul 2024 at 10:07.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
19 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Imperial Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Imperial Avenue, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 10:14.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Imperial Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Imperial Avenue, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Oct 2024 at 09:43.

Electricity Network Company logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are carrying out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:50.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 7 Oct 2024 at 15:21.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
Loughborough Road

Electricity Network Company were proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 5 Nov 2024 at 09:42.

Electricity Network Company logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are carrying out Statutory Infrastructure Works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 08:18.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Ratby Lane

Cadent Gas are carrying out Utility repair and maintenance works on Ratby Lane, Kirby Muxloe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:53 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:28.

Leicester City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Freeschool Lane

Leicester City Council are carrying out Highway improvement works on Freeschool Lane, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 Nov 2024 at 10:45.

Leicester City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 12 Nov 2024 at 10:09.

Leicester City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 5 Nov 2024 at 17:11.

Murphy Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bath Street

Murphy Gas Networks are proposing to carry out Utility asset works on Bath Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 18 Sep 2024 at 12:04.

Murphy Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bath Street

Murphy Gas Networks are proposing to carry out Utility asset works on Bath Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 11 Nov 2024 at 12:15.

Leicester City Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 3 Oct 2024 at 09:58.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Medina Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Medina Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:27.

Severn Trent Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Cliffe Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cliffe Lane, Markfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 09:50.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Beacon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Beacon Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Beacon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Beacon Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Nov 2024 at 16:46.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Jermyn Street

Severn Trent Water are proposing to carry out New service connection on Jermyn Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 16:19.

Leicestershire County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Greenhill Road

Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Aug 2024 at 10:56.

Leicestershire County Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Whitwick Road

Leicestershire County Council are proposing to carry out Highway improvement works on Whitwick Road, Copt Oak, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Forest Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Forest Road, Markfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 13:19.

Leicester City Council logo
LONG TERM
Between
5 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 22 Nov 2024 at 09:38.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out Utility asset works on High Street, Desford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 16:36.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out Utility asset works on High Street, Desford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 16:16.

Severn Trent Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Loughborough Road

Severn Trent Water were proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:10.

Leicester City Council logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 25 Oct 2024 at 09:35.

Electricity Network Company logo
Between
7 and 21 Jan 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 21 January 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 24 Oct 2024 at 10:43.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:33.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 08:09.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:24.

Severn Trent Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Cliffe Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cliffe Lane, Markfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 11:56.

Cadent Gas logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Follow
Hand Avenue

Cadent Gas are proposing to carry out Utility asset works on Hand Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:30.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beaumanor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beaumanor Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 13:05.

Severn Trent Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Shepshed Road

Severn Trent Water were proposing to carry out Utility asset works on Shepshed Road, Charley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 10:29.

Severn Trent Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Shepshed Road

Severn Trent Water are proposing to carry out Utility asset works on Shepshed Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:56.

Cadent Gas logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Hand Avenue

Cadent Gas are proposing to carry out Utility asset works on Hand Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:37.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beaumanor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beaumanor Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 09:52.

Severn Trent Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 07:36.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 14:36.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Greenhill Road

Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Whitwick Road

Leicestershire County Council are proposing to carry out Highway improvement works on Whitwick Road, Copt Oak, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Church Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Church Lane, Anstey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 15:13.

Leicester City Council logo
LONG TERM
Between
25 Jan and 5 May 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leicester City Council on 24 Jul 2024 at 10:18.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Speers Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Speers Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:52.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Speers Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Speers Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 09:34.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
The Ridings

Leicestershire County Council are proposing to carry out Highway improvement works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Sep 2024 at 14:36.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
The Ridings

Leicestershire County Council are proposing to carry out Highway improvement works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:46.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Sep 2024 at 14:36.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:46.

Leicestershire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Oct 2024 at 16:30.

Electricity Network Company logo
LONG TERM
Between
2 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:22.

Electricity Network Company logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Barrow Road

Electricity Network Company are proposing to carry out Utility asset works on Barrow Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 14:47.

Electricity Network Company logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:30.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Ratby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Aug 2024 at 11:06.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Ratby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2024 at 15:06.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Desford Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Desford Lane, Ratby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Aug 2024 at 11:06.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Desford Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Desford Lane, Ratby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2024 at 15:06.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Station Road

Leicestershire County Council are proposing to carry out Highway improvement works on Station Road, Ratby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 6 Nov 2024 at 13:56.

Leicestershire County Council logo
Between
15 and 27 Feb 2025
Details
View Map
Share
Follow
Ratby Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ratby Lane, Kirby Muxloe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Jul 2024 at 14:56.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 14:26.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 12:56.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 08:07.


Roadworks Map near to Bradgate Road, LEICESTER, LE6 0HD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Nov 2024 08:28
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bradgate Road, LEICESTER, LE6 0HD (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
BRADGATE ROAD 
(0.2 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.