ROADWORKS SUMMARY
Cookson Road, LEICESTER, LE4 9WT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cookson Road, LE4 9WT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cookson Road, LEICESTER, LE4 9WT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cookson Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
30 Oct 2025
Details
View Map
Share
Follow
Footpath I56

Leicestershire County Council are carrying out Highway improvement works on Footpath I56, Cossington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2024 at 12:26 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Oct 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
31 Mar and 14 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Cadent Gas are proposing to carry out Utility asset works on Leicester Road, Thurcaston, Thurcaston And Cropston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 16:36.

Cadent Gas logo
LONG TERM
Between
31 Mar and 14 Jul 2025
Details
View Map
Share
Leicester Road

Cadent Gas were proposing to carry out Utility asset works on Leicester Road, Thurcaston, Thurcaston And Cropston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:13.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ashleigh Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:49 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 May 2025 at 14:21.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Kingfisher Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Kingfisher Road, Mountsorrel.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Jan 2025 at 17:26.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Cossington Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Cossington Road, Sileby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Feb 2025 at 15:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Cossington Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Cossington Road, Sileby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 16:41 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2025 at 08:15.

Leicester City Council logo
LONG TERM
Between
27 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Dulverton Road

Leicester City Council are proposing to carry out Highway improvement works on Dulverton Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 8 Apr 2025 at 15:59.

Leicester City Council logo
LONG TERM
Between
27 Apr and 10 Jul 2025
Details
View Map
Share
Follow
Dunster Street

Leicester City Council are proposing to carry out Highway improvement works on Dunster Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 30 May 2025 at 09:25.

Leicester City Council logo
LONG TERM
Between
27 Apr and 10 Jul 2025
Details
View Map
Share
Follow
Hinckley Road

Leicester City Council are proposing to carry out Highway improvement works on Hinckley Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 30 May 2025 at 09:25.

Leicester City Council logo
LONG TERM
Between
27 Apr and 10 Jul 2025
Details
View Map
Share
Follow
Westcotes Drive

Leicester City Council are proposing to carry out Highway improvement works on Westcotes Drive, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 10 July 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 30 May 2025 at 09:26.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Meadvale Road

Cadent Gas are proposing to carry out Utility asset works on Meadvale Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 15:19.

Leicester City Council logo
LONG TERM
Between
28 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Dulverton Road

Leicester City Council are proposing to carry out Highway improvement works on Dulverton Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 4 Mar 2025 at 08:35.

Leicester City Council logo
LONG TERM
Between
28 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Hinckley Road

Leicester City Council are proposing to carry out Highway improvement works on Hinckley Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 4 Mar 2025 at 09:00.

Leicester City Council logo
LONG TERM
Between
28 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Dunster Street

Leicester City Council are proposing to carry out Highway improvement works on Dunster Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 4 Mar 2025 at 08:48.

Leicester City Council logo
LONG TERM
Between
28 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Westcotes Drive

Leicester City Council are proposing to carry out Highway improvement works on Westcotes Drive, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 4 Mar 2025 at 08:43.

Cadent Gas logo
LONG TERM
Between
5 May and 19 Jun 2025
Details
View Map
Share
Follow
Evington Lane

Cadent Gas are proposing to carry out Utility asset works on Evington Lane, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 11:23.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Horston Road

Cadent Gas are proposing to carry out Utility asset works on Horston Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 11:30.

Leicester City Council logo
LONG TERM
Between
5 May and 4 Jul 2025
Details
View Map
Share
Follow
Blackbird Road

Leicester City Council are proposing to carry out Highway improvement works on Blackbird Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 4 Apr 2025 at 16:02.

Cadent Gas logo
Today
Details
View Map
Share
Chapel Lane

Cadent Gas carried out Utility asset works on Chapel Lane, Leicester.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 6 May 2025 and 3 Jun 2025 and were actually completed between 6 May 2025 (10:20) and 3 Jun 2025 (11:50). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:55.

Leicester City Council logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Blackbird Road

Leicester City Council are proposing to carry out Highway improvement works on Blackbird Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 2 May 2025 at 09:39.

Leicester City Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Blackbird Road

Leicester City Council are carrying out Highway improvement works on Blackbird Road, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 2 Jun 2025 at 10:31.

Cadent Gas logo
LONG TERM
Between
12 May and 19 Jun 2025
Details
View Map
Share
Follow
Meadvale Road

Cadent Gas are proposing to carry out Utility asset works on Meadvale Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:09.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Newstead Road

Cadent Gas are proposing to carry out Utility asset works on Newstead Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 15:53.

Cadent Gas logo
Between
12 May and 11 Jun 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:08.

Cadent Gas logo
Between
12 May and 11 Jun 2025
Details
View Map
Share
Church Road

Cadent Gas were proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 09:46.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hillcroft Road

Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 12:43.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carisbrooke Road

Cadent Gas are proposing to carry out Utility asset works on Carisbrooke Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:09.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carisbrooke Road

Cadent Gas are proposing to carry out Utility asset works on Carisbrooke Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 11:47.

Cadent Gas logo
Between
19 May and 11 Jun 2025
Details
View Map
Share
Ratcliffe Road

Cadent Gas were proposing to carry out Utility asset works on Ratcliffe Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 09:04.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Elms Road

Cadent Gas were proposing to carry out Utility asset works on Elms Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 09:05.

Leicester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are proposing to carry out Section 50 on Havelock Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 12:49.

Leicester City Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are proposing to carry out Highway improvement works on Havelock Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 1 May 2025 at 10:14.

Leicester City Council logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are carrying out Highway improvement works on Havelock Street, Leicester.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 28 May 2025 at 14:26.

Leicester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are proposing to carry out Section 50 on Havelock Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 16 May 2025 at 15:42.

Leicester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Jarrom Street

Leicester City Council are proposing to carry out Highway improvement works on Jarrom Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 1 May 2025 at 10:08.

Leicester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Jarrom Street

Leicester City Council are proposing to carry out Highway improvement works on Jarrom Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 28 May 2025 at 14:26.

Cadent Gas logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Ambassador Road

Cadent Gas are proposing to carry out Utility asset works on Ambassador Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 09:41.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Illingworth Road

Cadent Gas are proposing to carry out Utility asset works on Illingworth Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:28.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
19 May and 31 Aug 2025
Details
View Map
Share
Follow
Mill Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Mill Lane, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Feb 2025 at 15:18.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
19 May and 31 Aug 2025
Details
View Map
Share
Follow
Mill Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Mill Lane, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Mar 2025 at 13:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
1 Sep 2025
Details
View Map
Share
Follow
Mill Lane

Western Power Distribution (East Midlands) are carrying out Utility asset works on Mill Lane, Sileby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:03 and could run through until 1 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 May 2025 at 14:04.

Cadent Gas logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Meadvale Road

Cadent Gas are carrying out Utility asset works on Meadvale Road, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 13:30 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 07:07.

Cadent Gas logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are carrying out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:48.

Cadent Gas logo
Between
24 May and 21 Jun 2025
Details
View Map
Share
Follow
Evington Valley Road

Cadent Gas are proposing to carry out Utility asset works on Evington Valley Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 10:00.

Cadent Gas logo
Between
26 May and 11 Jun 2025
Details
View Map
Share
Follow
Asquith Way

Cadent Gas are proposing to carry out Utility asset works on Asquith Way, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 11:43.

Cadent Gas logo
Between
26 May and 11 Jun 2025
Details
View Map
Share
Follow
Westgate Road

Cadent Gas are proposing to carry out Utility asset works on Westgate Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:54.

Cadent Gas logo
Between
26 May and 10 Jun 2025
Details
View Map
Share
Knighton Road

Cadent Gas were proposing to carry out Utility asset works on Knighton Road, Leicester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 09:08.

Cadent Gas logo
Until
24 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Evington, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:30 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 08:36.

Cadent Gas logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
St Philips Road

Cadent Gas are proposing to carry out Utility asset works on St Philips Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 16:25.

Cadent Gas logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Wakerley Road

Cadent Gas are proposing to carry out Utility asset works on Wakerley Road, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:51.

Cadent Gas logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Wakerley Road

Cadent Gas are proposing to carry out Utility asset works on Wakerley Road, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:09.

Cadent Gas logo
LONG TERM
Between
26 May and 7 Jul 2025
Details
View Map
Share
Follow
Ambassador Road

Cadent Gas are proposing to carry out Utility asset works on Ambassador Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 14:30.

Leicester City Council logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are proposing to carry out Section 50 on Havelock Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 12:48.

Leicester City Council logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Havelock Street

Leicester City Council are proposing to carry out Section 50 on Havelock Street, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 16 May 2025 at 15:43.

Cadent Gas logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:16.

Cadent Gas logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 11:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Swithland Lane

Cadent Gas are carrying out Utility repair and maintenance works on Swithland Lane, Rothley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 23:43 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 13:56.

Telefonica UK logo
Finishing
Friday
Details
View Map
Share
Follow
Halstead Road

Telefonica UK are carrying out Utility asset works on Halstead Road, Mountsorrel.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 29 May 2025 at 08:37.

Cadent Gas logo
LONG TERM
Between
30 May and 22 Jul 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 13:06.

Cadent Gas logo
LONG TERM
Between
30 May and 22 Jul 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 16:46.

Cadent Gas logo
LONG TERM
Until
23 Jul 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are carrying out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:15 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:33.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 15:14.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 00:10.

Cadent Gas logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Bannerman Road

Cadent Gas are proposing to carry out Utility asset works on Bannerman Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 10:30.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Regent Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Regent Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Feb 2025 at 10:08.

Leicester City Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Winifred Street

Leicester City Council are proposing to carry out Highway improvement works on Winifred Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 2 May 2025 at 07:45.

Leicester City Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Winifred Street

Leicester City Council are proposing to carry out Highway improvement works on Winifred Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 29 May 2025 at 14:28.

Cadent Gas logo
Between
2 and 25 Jun 2025
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:46.

Leicester City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
All Saints Road

Leicester City Council are proposing to carry out Highway improvement works on All Saints Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 16:01.

Leicester City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Jarvis Street

Leicester City Council are proposing to carry out Highway improvement works on Jarvis Street, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 16:08.

Leicester City Council logo
LONG TERM
Between
2 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Blackbird Road

Leicester City Council are proposing to carry out Highway improvement works on Blackbird Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 19 Feb 2025 at 10:47.

Cadent Gas logo
Between
2 and 25 Jun 2025
Details
View Map
Share
Follow
Mill Road

Cadent Gas are proposing to carry out Utility asset works on Mill Road, Thurcaston, Thurcaston And Cropston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 16:06.

Cadent Gas logo
Between
2 and 25 Jun 2025
Details
View Map
Share
Mill Road

Cadent Gas were proposing to carry out Utility asset works on Mill Road, Thurcaston, Thurcaston And Cropston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:34.

Cadent Gas logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Thurcaston Lane

Cadent Gas are proposing to carry out Utility asset works on Thurcaston Lane, Thurcaston And Cropston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 16:06.

Cadent Gas logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Thurcaston Lane

Cadent Gas were proposing to carry out Utility asset works on Thurcaston Lane, Thurcaston And Cropston.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:15.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
2 Jun and 31 Aug 2025
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Brook Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Feb 2025 at 13:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are carrying out Utility asset works on Brook Street, Sileby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:21 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jun 2025 at 08:51.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
2 Jun and 31 Aug 2025
Details
View Map
Share
Follow
Albion Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Albion Road, Sileby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Feb 2025 at 13:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Albion Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Albion Road, Sileby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:29 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jun 2025 at 08:51.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Regent Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Regent Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Apr 2025 at 11:42.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 May 2025 at 12:15.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Asfordby Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asfordby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Nottingham Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nottingham Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Market Garden Close

Severn Trent Water are proposing to carry out New service connection on Market Garden Close, Thurmaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 14:16.

Cadent Gas logo
Between
4 and 20 Jun 2025
Details
View Map
Share
Follow
Carisbrooke Road

Cadent Gas are proposing to carry out Utility asset works on Carisbrooke Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 10:32.

Leicestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Groby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Groby Road, Glenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 29 Apr 2025 at 11:06.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Constance Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Constance Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:44.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Constance Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Constance Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 15:35.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Dorothy Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dorothy Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:44.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Dorothy Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dorothy Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 15:30.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Kitchener Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kitchener Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Kitchener Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kitchener Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 15:27.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
Osborne Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Severn Trent Water logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Cadent Gas logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Aberdale Road

Cadent Gas are proposing to carry out Utility asset works on Aberdale Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 11:44.

Cadent Gas logo
Between
9 and 25 Jun 2025
Details
View Map
Share
Follow
Overdale Road

Cadent Gas are proposing to carry out Utility asset works on Overdale Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:23.

Cadent Gas logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Shady Lane

Cadent Gas are proposing to carry out Utility asset works on Shady Lane, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:11.

Cadent Gas logo
LONG TERM
Between
9 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Stoughton Lane

Cadent Gas are proposing to carry out Utility asset works on Stoughton Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:09.

Cadent Gas logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Church Road

Cadent Gas were proposing to carry out Utility asset works on Church Road, Evington, Leicester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 09:49.

Severn Trent Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Stoughton Street South

Severn Trent Water are proposing to carry out New service connection on Stoughton Street South, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Mar 2025 at 10:54.

Severn Trent Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Stoughton Street South

Severn Trent Water are proposing to carry out New service connection on Stoughton Street South, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Mar 2025 at 09:25.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Illingworth Road

Cadent Gas are proposing to carry out Utility asset works on Illingworth Road, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:21.

Cityfibre Metro Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Clyde Street

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Clyde Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Apr 2025 at 14:41.

Cityfibre Metro Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Clyde Street

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Clyde Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 22 May 2025 at 11:45.

Cityfibre Metro Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Erskine Street

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Erskine Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Apr 2025 at 12:09.

Severn Trent Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Beatrice Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Mar 2025 at 14:27.

Severn Trent Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Beatrice Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Mar 2025 at 11:40.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Covert Lane

BT are proposing to carry out Utility repair and maintenance works on Covert Lane, Scraptoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 8 Apr 2025 at 16:56.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Covert Lane

BT are proposing to carry out Utility repair and maintenance works on Covert Lane, Scraptoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Jun 2025 at 09:56.

Cadent Gas logo
Between
9 and 18 Jun 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:30.

Cadent Gas logo
Between
9 and 18 Jun 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 16:36.

Severn Trent Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Stoughton Street South

Severn Trent Water were proposing to carry out New service connection on Stoughton Street South, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Mar 2025 at 15:38.

Electricity Network Company logo
Between
10 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 11:14.

Electricity Network Company logo
Between
10 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:41.

Electricity Network Company logo
Between
11 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:35.

Electricity Network Company logo
Between
11 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:36.

Electricity Network Company logo
Between
12 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:07.

Electricity Network Company logo
Between
12 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:27.

Electricity Network Company logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:00.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
14 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Groby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Groby Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Apr 2025 at 15:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
14 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Groby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Groby Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Jun 2025 at 11:23.

Network Rail logo
Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 May 2025 at 15:06.

Network Rail logo
Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 May 2025 at 16:26.

Severn Trent Water logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Margaret Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Margaret Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 09:46.

Severn Trent Water logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Severn Trent Water logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Copdale Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Copdale Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:43.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Bonchurch Street

Leicester City Council are proposing to carry out Highway improvement works on Bonchurch Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:24.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Repton Street

Leicester City Council are proposing to carry out Highway improvement works on Repton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 23 May 2025 at 15:32.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Dunton Street

Leicester City Council are proposing to carry out Highway improvement works on Dunton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:26.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Central Road

Leicester City Council are proposing to carry out Highway improvement works on Central Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:24.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Bassett Street

Leicester City Council are proposing to carry out Highway improvement works on Bassett Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:26.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Marshall Street

Leicester City Council are proposing to carry out Highway improvement works on Marshall Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:27.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Marshall Street

Leicester City Council are proposing to carry out Highway improvement works on Marshall Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:28.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Rugby Street

Leicester City Council are proposing to carry out Highway improvement works on Rugby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 23 May 2025 at 15:31.

Leicester City Council logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Balfour Street

Leicester City Council are proposing to carry out Highway improvement works on Balfour Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 27 May 2025 at 09:27.

Severn Trent Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Knighton Fields Road East

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knighton Fields Road East, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Apr 2025 at 10:21.

Leicester City Council logo
Between
16 and 25 Jun 2025
Details
View Map
Share
Follow
Winifred Street

Leicester City Council are proposing to carry out Section 50 on Winifred Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 16 May 2025 at 15:43.

Leicester City Council logo
Between
16 and 25 Jun 2025
Details
View Map
Share
Follow
Winifred Street

Leicester City Council are proposing to carry out Section 50 on Winifred Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 21 May 2025 at 10:01.

Severn Trent Water logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Melbourne Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Mar 2025 at 11:58.

Cadent Gas logo
Between
16 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Balderstone Close

Cadent Gas are proposing to carry out Utility asset works on Balderstone Close, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 15:37.

Leicester City Council logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Garland Crescent

Leicester City Council are proposing to carry out Highway improvement works on Garland Crescent, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 19 May 2025 at 12:44.

Leicestershire County Council logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Barkby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Barkby Road, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leicestershire County Council on 29 May 2025 at 14:56.

Leicestershire County Council logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Barkby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Barkby Road, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leicestershire County Council on 29 May 2025 at 14:56.

Leicestershire County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 12:16.

Leicestershire County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Bradgate Road

Leicestershire County Council were proposing to carry out Highway improvement works on Bradgate Road, Anstey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 13:36.

Leicestershire County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
The Nook

Leicestershire County Council are proposing to carry out Highway improvement works on The Nook, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 12:57.

Leicestershire County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Stadon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stadon Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 12:57.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
21 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Groby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Groby Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Apr 2025 at 15:58.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
21 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Groby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Groby Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Jun 2025 at 11:35.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
21 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Forest Way Cycleway City Boundary To Outer Ring Cycleway

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forest Way Cycleway City Boundary To Outer Ring Cycleway, Leicester.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 21 June 2025 and could run through until 24 August 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Apr 2025 at 12:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
21 Jun and 24 Aug 2025
Details
View Map
Share
Follow
Forest Way Cycleway City Boundary To Outer Ring Cycleway

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forest Way Cycleway City Boundary To Outer Ring Cycleway, Leicester.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 21 June 2025 and could run through until 24 August 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Jun 2025 at 11:35.

Severn Trent Water logo
Between
22 and 26 Jun 2025
Details
View Map
Share
Follow
Gedding Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gedding Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 14:36.

Severn Trent Water logo
Between
22 and 26 Jun 2025
Details
View Map
Share
Follow
Margaret Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Margaret Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 14:38.

Severn Trent Water logo
Between
22 and 26 Jun 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 14:33.

Cadent Gas logo
LONG TERM
Between
23 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Stoughton Lane

Cadent Gas are proposing to carry out Utility asset works on Stoughton Lane, Stoughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:56.

Cadent Gas logo
LONG TERM
Between
23 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Stoughton Lane

Cadent Gas are proposing to carry out Utility asset works on Stoughton Lane, Stoughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:26.

Cadent Gas logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Shady Lane

Cadent Gas are proposing to carry out Utility asset works on Shady Lane, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 14:42.

Cadent Gas logo
LONG TERM
Between
23 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Stoughton Lane

Cadent Gas are proposing to carry out Utility asset works on Stoughton Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 15:27.

Cadent Gas logo
LONG TERM
Between
23 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Stoughton Lane

Cadent Gas are proposing to carry out Utility asset works on Stoughton Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:10.

Leicester City Council logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Narborough Road

Leicester City Council are proposing to carry out Highway improvement works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 09:47.

Leicester City Council logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Ashleigh Road

Leicester City Council are proposing to carry out Highway improvement works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 May 2025 at 14:44.

Cadent Gas logo
Between
23 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Kedleston Road

Cadent Gas are proposing to carry out Utility asset works on Kedleston Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 15:00.

Cadent Gas logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Ambassador Road

Cadent Gas are proposing to carry out Utility asset works on Ambassador Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 11:18.

Cadent Gas logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Illingworth Road

Cadent Gas are proposing to carry out Utility asset works on Illingworth Road, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:21.

Cadent Gas logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Illingworth Road

Cadent Gas are proposing to carry out Utility asset works on Illingworth Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:03.

Leicester City Council logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
All Saints Road

Leicester City Council are proposing to carry out Highway improvement works on All Saints Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 22 May 2025 at 16:01.

Leicester City Council logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Jarvis Street

Leicester City Council are proposing to carry out Highway improvement works on Jarvis Street, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 22 May 2025 at 16:01.

Severn Trent Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Beatrice Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 14:52.

Severn Trent Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Harrison Road

Severn Trent Water are proposing to carry out New service connection on Harrison Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 May 2025 at 15:22.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
23 Jun and 31 Aug 2025
Details
View Map
Share
Follow
King Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on King Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Feb 2025 at 13:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
23 Jun and 31 Aug 2025
Details
View Map
Share
Follow
King Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on King Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Mar 2025 at 11:36.

Severn Trent Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Apr 2025 at 10:35.

Severn Trent Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 May 2025 at 11:37.

Severn Trent Water logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
From Church Road To Numbers 19 To 23 To

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Church Road To Numbers 19 To 23 To, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Apr 2025 at 16:26.

Severn Trent Water logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
From Church Road To Numbers 19 To 23 To

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Church Road To Numbers 19 To 23 To, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 May 2025 at 15:16.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Shakespeare Street

Severn Trent Water are proposing to carry out New service connection on Shakespeare Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2025 at 11:26.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Shakespeare Street

Severn Trent Water are proposing to carry out New service connection on Shakespeare Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Apr 2025 at 13:52.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Beatrice Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 3 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 14:51.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Leicester Road

Leicestershire County Council were proposing to carry out Highway improvement works on Leicester Road, Anstey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 July 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Feb 2025 at 13:36.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Mar 2025 at 16:56.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Apr 2025 at 15:26.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Apr 2025 at 16:36.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Bradgate Road

Leicestershire County Council are proposing to carry out Highway improvement works on Bradgate Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Mar 2025 at 17:26.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Bradgate Road

Leicestershire County Council are proposing to carry out Highway improvement works on Bradgate Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Mar 2025 at 16:16.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
The Nook

Leicestershire County Council are proposing to carry out Highway improvement works on The Nook, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Mar 2025 at 16:36.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
The Nook

Leicestershire County Council are proposing to carry out Highway improvement works on The Nook, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Mar 2025 at 16:16.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Cropston Road

Leicestershire County Council are proposing to carry out Highway improvement works on Cropston Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Mar 2025 at 16:36.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Cropston Road

Leicestershire County Council are proposing to carry out Highway improvement works on Cropston Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Mar 2025 at 16:16.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Stadon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stadon Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Mar 2025 at 16:36.

Leicestershire County Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Stadon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stadon Road, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Mar 2025 at 16:16.

Leicester City Council logo
LONG TERM
Between
6 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Narborough Road

Leicester City Council are proposing to carry out Highway improvement works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 9 May 2025 at 14:15.

Severn Trent Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Knighton Fields Road West

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knighton Fields Road West, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Mar 2025 at 08:51.

Severn Trent Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Knighton Fields Road West

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knighton Fields Road West, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Apr 2025 at 10:19.

Cadent Gas logo
Between
7 and 24 Jul 2025
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 11:21.

Cadent Gas logo
LONG TERM
Between
7 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Evington Lane

Cadent Gas are proposing to carry out Utility asset works on Evington Lane, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 14:22.

Cadent Gas logo
LONG TERM
Between
7 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Evington Lane

Cadent Gas are proposing to carry out Utility asset works on Evington Lane, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 12:10.

Cadent Gas logo
Between
7 and 31 Jul 2025
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:02.

Cadent Gas logo
Between
7 and 31 Jul 2025
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:20.

Severn Trent Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Beaumanor Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Beaumanor Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Apr 2025 at 12:17.

Leicestershire County Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Hungarton Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Hungarton Lane, Beeby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 08:26.

Leicestershire County Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Hungarton Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Hungarton Lane, Beeby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 13 May 2025 at 16:06.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
7 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Allington Drive

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Allington Drive, Birstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 May 2025 at 15:38.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Mountsorrel Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Mountsorrel Lane, Sileby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Apr 2025 at 16:30.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on High Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Feb 2025 at 14:51.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on High Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Mar 2025 at 13:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on High Street, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 May 2025 at 12:51.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Barrow Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barrow Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Feb 2025 at 17:44.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Barrow Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barrow Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Mar 2025 at 13:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Barrow Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barrow Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 May 2025 at 12:53.

BT logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Olympic Close

BT are proposing to carry out Utility repair and maintenance works on Olympic Close, Glenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 29 Apr 2025 at 11:56.

BT logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Olympic Close

BT are proposing to carry out Utility repair and maintenance works on Olympic Close, Glenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 12 May 2025 at 13:36.

Severn Trent Water logo
Between
9 and 22 Jul 2025
Details
View Map
Share
Highgate Road

Severn Trent Water were proposing to carry out Utility asset works on Highgate Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 16:23.

Severn Trent Water logo
Between
9 and 22 Jul 2025
Details
View Map
Share
Heathcote Drive

Severn Trent Water were proposing to carry out Utility asset works on Heathcote Drive, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 16:23.

Leicester City Council logo
Between
12 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Wicklow Drive

Leicester City Council are proposing to carry out Highway improvement works on Wicklow Drive, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 21 May 2025 at 10:38.

Leicester City Council logo
Between
12 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Ambassador Road

Leicester City Council are proposing to carry out Highway improvement works on Ambassador Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 21 May 2025 at 10:38.

Leicester City Council logo
LONG TERM
Between
13 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Ethel Road

Leicester City Council are proposing to carry out Highway improvement works on Ethel Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 9 May 2025 at 15:40.

Leicester City Council logo
LONG TERM
Between
13 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Evington Drive

Leicester City Council are proposing to carry out Highway improvement works on Evington Drive, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 8 May 2025 at 13:29.

Leicester City Council logo
LONG TERM
Between
13 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Evington Valley Road

Leicester City Council are proposing to carry out Highway improvement works on Evington Valley Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 8 May 2025 at 13:24.

Cadent Gas logo
Between
14 and 29 Jul 2025
Details
View Map
Share
Follow
Baden Road

Cadent Gas are proposing to carry out Utility asset works on Baden Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 11:25.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Horston Road

Cadent Gas are proposing to carry out Utility asset works on Horston Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 09:30.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Horston Road

Cadent Gas are proposing to carry out Utility asset works on Horston Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 11:52.

Cadent Gas logo
Between
14 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Balderstone Close

Cadent Gas are proposing to carry out Utility asset works on Balderstone Close, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:38.

Severn Trent Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Harewood Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Harewood Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 15:18.

Severn Trent Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Harewood Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Harewood Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 11:25.

Severn Trent Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Humberstone Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Humberstone Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 12:04.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
14 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Groby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Groby Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Apr 2025 at 15:55.

Leicestershire County Council logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Barkby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Barkby Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 23 May 2025 at 16:26.

Electricity Network Company logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Mar 2025 at 09:13.

Electricity Network Company logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Mar 2025 at 15:50.

Electricity Network Company logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Market Place

Electricity Network Company are proposing to carry out Utility asset works on Market Place, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Mar 2025 at 09:13.

Electricity Network Company logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Market Place

Electricity Network Company are proposing to carry out Utility asset works on Market Place, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Mar 2025 at 15:50.

Severn Trent Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Back Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Back Lane, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Apr 2025 at 14:06.

Severn Trent Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Back Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Back Lane, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 May 2025 at 11:46.

Severn Trent Water logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Knighton Fields Road East

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knighton Fields Road East, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 12:24.

Severn Trent Water logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Knighton Fields Road East

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knighton Fields Road East, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 May 2025 at 13:36.

Electricity Network Company logo
Between
16 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 12:53.

Electricity Network Company logo
Between
17 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 08:06.

Electricity Network Company logo
Between
17 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 15:58.

Electricity Network Company logo
Between
18 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 12:09.

Electricity Network Company logo
Between
18 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 15:54.

Electricity Network Company logo
Between
18 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:30.

Western Power Distribution (East Midlands) logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Colton Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Colton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Apr 2025 at 14:52.

Severn Trent Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Bridge Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Bridge Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Apr 2025 at 10:56.

Severn Trent Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Beatrice Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2025 at 09:40.

Severn Trent Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Beatrice Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 May 2025 at 10:21.

Severn Trent Water logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Regent Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Regent Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 24 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 May 2025 at 15:07.

BT logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Fowler Close

BT are proposing to carry out Utility repair and maintenance works on Fowler Close, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 May 2025 at 09:44.

Cadent Gas logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
St Philips Road

Cadent Gas are proposing to carry out Utility asset works on St Philips Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 12:40.

Cadent Gas logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Evington Drive

Cadent Gas are proposing to carry out Utility asset works on Evington Drive, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 12:11.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Evington Valley Road

Cadent Gas are proposing to carry out Utility asset works on Evington Valley Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 15:00.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Evington Valley Road

Cadent Gas are proposing to carry out Utility asset works on Evington Valley Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 16:10.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Ingarsby Lane

Leicestershire County Council were proposing to carry out Highway improvement works on Ingarsby Lane, Ingarsby, Hungarton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 May 2025 at 09:56.

Leicestershire County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ingarsby Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ingarsby Lane, Ingarsby, Hungarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 May 2025 at 12:06.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Ingarsby Lane

Leicestershire County Council were proposing to carry out Highway improvement works on Ingarsby Lane, Ingarsby, Hungarton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 May 2025 at 12:06.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Ingarsby Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ingarsby Lane, Ingarsby, Hungarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 May 2025 at 12:06.

Severn Trent Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Beatrice Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Apr 2025 at 09:55.

Severn Trent Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Beatrice Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beatrice Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 May 2025 at 10:21.

Leicestershire County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Barkby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Barkby Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 29 May 2025 at 15:06.

Leicestershire County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Barkby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Barkby Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 29 May 2025 at 15:06.

Severn Trent Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Barkby Road

Severn Trent Water are proposing to carry out Utility asset works on Barkby Road, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 May 2025 at 11:26.

Leicestershire County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Swithland Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Lane, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 May 2025 at 17:26.

Leicestershire County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Swithland Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Lane, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 May 2025 at 18:26.

Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Melton Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Melton Road, Rearsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Jun 2025 at 16:16.

Severn Trent Water logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Medina Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Medina Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 09:44.

Severn Trent Water logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Medina Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Medina Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 May 2025 at 14:57.

Cadent Gas logo
Between
30 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Stoughton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:10.

Cadent Gas logo
Between
30 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Thurnby Lane

Cadent Gas are proposing to carry out Utility asset works on Thurnby Lane, Stoughton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:12.

Leicestershire County Council logo
LONG TERM
Between
31 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Knighton Grange Road

Leicestershire County Council are proposing to carry out Highway improvement works on Knighton Grange Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 May 2025 at 10:16.

Leicestershire County Council logo
LONG TERM
Between
1 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Glebe Road

Leicestershire County Council are proposing to carry out Highway improvement works on Glebe Road, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 May 2025 at 10:36.

Leicestershire County Council logo
LONG TERM
Between
4 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Ringers Spinney

Leicestershire County Council are proposing to carry out Highway improvement works on Ringers Spinney, Oadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 May 2025 at 11:36.

Leicester City Council logo
Between
4 and 21 Aug 2025
Details
View Map
Share
Follow
Newstead Road

Leicester City Council are proposing to carry out Highway improvement works on Newstead Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 1 May 2025 at 16:00.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gaulby Lane

Cadent Gas are proposing to carry out Utility asset works on Gaulby Lane, Stoughton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:13.

Cadent Gas logo
Between
4 and 20 Aug 2025
Details
View Map
Share
Follow
Bannerman Road

Cadent Gas are proposing to carry out Utility asset works on Bannerman Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:41.

Between
5 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Melton Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Melton Road, Rearsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 May 2025 at 10:06.

Severn Trent Water logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Highgate Road

Severn Trent Water are proposing to carry out Utility asset works on Highgate Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 10:52.

Severn Trent Water logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Heathcote Drive

Severn Trent Water are proposing to carry out Utility asset works on Heathcote Drive, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 15:46.

Cityfibre Metro Networks logo
Between
14 and 20 Aug 2025
Details
View Map
Share
Follow
Clyde Street

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Clyde Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 22 May 2025 at 11:49.

Electricity Network Company logo
Between
14 and 27 Aug 2025
Details
View Map
Share
Leicester Road

Electricity Network Company were proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2025 and run through until 27 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 26 Feb 2025 at 09:14.

Electricity Network Company logo
Between
14 and 27 Aug 2025
Details
View Map
Share
Leicester Road

Electricity Network Company were proposing to carry out Utility asset works on Leicester Road, Mountsorrel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2025 and run through until 27 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 26 Feb 2025 at 11:18.

Electricity Network Company logo
Between
14 and 27 Aug 2025
Details
View Map
Share
Market Place

Electricity Network Company were proposing to carry out Utility asset works on Market Place, Mountsorrel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2025 and run through until 27 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 26 Feb 2025 at 11:20.

Severn Trent Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Perkyn Road

Severn Trent Water are proposing to carry out Permanent reinstatement on Perkyn Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 May 2025 at 13:28.

Severn Trent Water logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
St Peters Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Peters Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 May 2025 at 12:14.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Okehampton Avenue

BT are proposing to carry out Utility repair and maintenance works on Okehampton Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 15:39.


Roadworks Map near to Cookson Road, LEICESTER, LE4 9WT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cookson Road, LEICESTER, LE4 9WT (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
HUMBERSTONE LANE 
(0.4 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footpath - Multi-way signals
In Progress
Since: 30 May 2025 22:44
(Scheduled: 30 May 2025 - 6 Jun 2025)
0.4
Details
Share
Follow
2
BT logo
THE COPPICE 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Jun 2025 11:45
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.5
Details
Share
Follow
3
Severn Trent Water logo
URGENT
  
LONSDALE ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
3 Jun 2025 08:05 - 08:55
0.6
Details
Share
4
Severn Trent Water logo
URGENT
  
LONSDALE ROAD 
(0.7 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Road closure
Complete
30 May 2025 08:30 - 3 Jun 2025 14:44
0.7
Details
Share
5
Western Power Distribution (East Midlands) logo
URGENT
  
BEECHWOOD AVENUE 
(0.7 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
29 May 2025 09:00 - 2 Jun 2025 21:54
0.7
Details
Share
6
Severn Trent Water logo
MAJOR
  
MARKET GARDEN CLOSE 
(0.8 miles)
Severn Trent Water
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 3 Jun 2025 - 6 Jun 2025
0.8
Details
Share
Follow
7
Severn Trent Water logo
URGENT
  
RUTLAND DRIVE 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
2 Jun 2025 09:47 - 12:59
0.9
Details
Share
8
Severn Trent Water logo
BIRSMORE AVENUE 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.