ROADWORKS SUMMARY
Brook Furlong Drive, LEICESTER, LE4 3LU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brook Furlong Drive, LE4 3LU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brook Furlong Drive, LEICESTER, LE4 3LU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brook Furlong Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
30 Oct 2025
Details
View Map
Share
Follow
Footpath I56

Leicestershire County Council are carrying out Highway improvement works on Footpath I56, Cossington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2024 at 12:26 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Oct 2024 at 14:46.

Leicestershire County Council logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Hallfields Lane

Leicestershire County Council are carrying out Highway improvement works on Hallfields Lane, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 00:00 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jul 2024 at 07:06.

Leicestershire County Council logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are carrying out Highway improvement works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 00:00 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jul 2024 at 07:06.

Leicestershire County Council logo
LONG TERM
Between
1 Jul 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Cossington Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Lane, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 22 Nov 2024 at 10:26.

Leicestershire County Council logo
LONG TERM
Between
1 Jul 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Cossington Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Lane, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 22 Nov 2024 at 10:26.

Leicester City Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Granby Street

Leicester City Council are carrying out Highway improvement works on Granby Street, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 07:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leicester City Council on 6 Aug 2024 at 13:28.

Leicester City Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Abbey Gate

Leicester City Council are carrying out Highway improvement works on Abbey Gate, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 07:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 17 Sep 2024 at 16:15.

Leicester City Council logo
LONG TERM
Between
16 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Abbey Gate

Leicester City Council are proposing to carry out Highway improvement works on Abbey Gate, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicester City Council on 17 Jul 2024 at 10:07.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Linden Drive

Cadent Gas were proposing to carry out Utility asset works on Linden Drive, Leicester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 12:43.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Woodgreen Road

Cadent Gas are proposing to carry out Utility asset works on Woodgreen Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 12:46.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Woodgreen Road

Cadent Gas are carrying out Utility asset works on Woodgreen Road, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 14:30 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 14:36.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Wellbrook Avenue

Cadent Gas are carrying out Utility asset works on Wellbrook Avenue, Sileby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:50 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:52.

Cadent Gas logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Gipsy Lane

Cadent Gas are carrying out Utility asset works on Gipsy Lane, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 16:20 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:06.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
19 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Imperial Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Imperial Avenue, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 10:14.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Imperial Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Imperial Avenue, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Oct 2024 at 09:43.

Network Rail logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shooting Close Lane

Network Rail are carrying out Works for Rail Purposes on Shooting Close Lane, Barrow Upon Soar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 13:56.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ambassador Road

Cadent Gas are proposing to carry out Utility asset works on Ambassador Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:30.

Electricity Network Company logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are carrying out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:50.

Leicester City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Western Road

Leicester City Council are proposing to carry out Highway improvement works on Western Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 29 Aug 2024 at 14:47.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Winchester Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Winchester Avenue, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:04 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 15:59.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Norman Street

Leicester City Council were proposing to carry out Highway improvement works on Norman Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 1 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 2 Sep 2024 at 13:36.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Norman Street

Leicester City Council are proposing to carry out Highway improvement works on Norman Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 13 Sep 2024 at 13:00.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Norman Street

Leicester City Council are proposing to carry out Highway improvement works on Norman Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 17 Oct 2024 at 12:13.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Briton Street

Leicester City Council are proposing to carry out Highway improvement works on Briton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 13 Sep 2024 at 12:46.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Briton Street

Leicester City Council are proposing to carry out Highway improvement works on Briton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 14 Oct 2024 at 11:47.

Leicester City Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Western Road

Leicester City Council are proposing to carry out Highway improvement works on Western Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 14 Oct 2024 at 15:10.

Cadent Gas logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Huntingdon Road

Cadent Gas are carrying out Utility asset works on Huntingdon Road, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 09:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:06.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Highgate Road

Cadent Gas are carrying out Utility asset works on Highgate Road, Sileby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:50 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:58.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 7 Oct 2024 at 15:21.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winchester Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Winchester Avenue, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 08:41.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Hawthorne Drive

Cadent Gas were proposing to carry out Utility asset works on Hawthorne Drive, Leicester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 11:25.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Illingworth Road

Cadent Gas are proposing to carry out Utility asset works on Illingworth Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:39.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rowlatts Hill Road

Cadent Gas are proposing to carry out Utility asset works on Rowlatts Hill Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:24.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ambassador Road

Cadent Gas are proposing to carry out Utility asset works on Ambassador Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:40.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Wicklow Drive Access Road

Cadent Gas are proposing to carry out Utility asset works on Wicklow Drive Access Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:39.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Wicklow Drive

Cadent Gas are carrying out Utility asset works on Wicklow Drive, Leicester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 12:50 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:00.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Huntingdon Road

Cadent Gas were proposing to carry out Utility asset works on Huntingdon Road, Leicester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:23.

Leicestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brookside

Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Nov 2024 at 09:36.

Leicestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brookside

Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 17:46.

Electricity Network Company logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are carrying out Statutory Infrastructure Works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 08:18.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
Loughborough Road

Electricity Network Company were proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 5 Nov 2024 at 09:42.

Leicester City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Freeschool Lane

Leicester City Council are carrying out Highway improvement works on Freeschool Lane, Leicester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 20 Nov 2024 at 10:45.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sileby Road

Cadent Gas are carrying out Utility repair and maintenance works on Sileby Road, Barrow Upon Soar.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:51 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:16.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Highfield Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Highfield Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Oct 2024 at 11:30.

Western Power Distribution (East Midlands) logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Highfield Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Highfield Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Nov 2024 at 14:56.

Leicester City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 5 Nov 2024 at 17:11.

Leicester City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 12 Nov 2024 at 10:09.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

BT are carrying out Utility repair and maintenance works on Melton Road, Syston.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 11:53 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Nov 2024 at 14:24.

Leicester City Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Progress Way

Leicester City Council are proposing to carry out Highway improvement works on Progress Way, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 11 Nov 2024 at 16:01.

Leicester City Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Progress Way

Leicester City Council are proposing to carry out Highway improvement works on Progress Way, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 22 Nov 2024 at 09:36.

Murphy Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bath Street

Murphy Gas Networks are proposing to carry out Utility asset works on Bath Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 18 Sep 2024 at 12:04.

Murphy Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bath Street

Murphy Gas Networks are proposing to carry out Utility asset works on Bath Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 11 Nov 2024 at 12:15.

Leicester City Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rutherford Road

Leicester City Council are proposing to carry out Highway repair and maintenance works on Rutherford Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 3 Oct 2024 at 09:58.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Sep 2024 at 12:46.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Sep 2024 at 15:06.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Oct 2024 at 15:56.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 29 Oct 2024 at 15:56.

Leicester City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Mill Lane

Leicester City Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 14 Nov 2024 at 14:35.

Leicester City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Mill Lane

Leicester City Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 14 Nov 2024 at 14:35.

Leicester City Council logo
Between
27 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Old Milton Street

Leicester City Council are proposing to carry out Section 50 on Old Milton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 22 Nov 2024 at 15:42.

Leicester City Council logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Old Milton Street

Leicester City Council are proposing to carry out Section 50 on Old Milton Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 22 Nov 2024 at 15:43.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Medina Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Medina Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 22 Jan 2025
Details
View Map
Share
Follow
Linden Drive

Cadent Gas are proposing to carry out Utility asset works on Linden Drive, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:03.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 22 Jan 2025
Details
View Map
Share
Follow
Linden Drive

Cadent Gas are proposing to carry out Utility asset works on Linden Drive, Leicester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:10.

Severn Trent Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Albion Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Albion Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Sep 2024 at 09:25.

Cadent Gas logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Freehold Street

Cadent Gas are proposing to carry out Utility asset works on Freehold Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:33.

Cadent Gas logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Freehold Street

Cadent Gas are proposing to carry out Utility asset works on Freehold Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 00:10.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chatham Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chatham Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Oct 2024 at 16:40.

Severn Trent Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Albion Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Albion Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 10:37.

Severn Trent Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Albion Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Albion Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 15:34.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Jermyn Street

Severn Trent Water are proposing to carry out New service connection on Jermyn Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 16:19.

Network Rail logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 May 2024 at 05:56.

Network Rail logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Oct 2024 at 15:56.

Network Rail logo
Between
21 and 23 Dec 2024
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jun 2024 at 11:56.

Network Rail logo
Between
21 and 23 Dec 2024
Details
View Map
Share
Follow
Broome Lane

Network Rail are proposing to carry out Works for Rail Purposes on Broome Lane, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 07:56.

Leicester City Council logo
LONG TERM
Between
5 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 22 Nov 2024 at 09:38.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 27 Apr 2025
Details
View Map
Share
Follow
Narborough Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 14:12.

Leicester City Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Dover Street

Leicester City Council are proposing to carry out Highway improvement works on Dover Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 13 Sep 2024 at 12:29.

Leicester City Council logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicester City Council on 25 Oct 2024 at 09:35.

Leicestershire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Leicestershire County Council are proposing to carry out Highway improvement works on Beacon Avenue, Thurmaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Nov 2024 at 16:49.

Severn Trent Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Loughborough Road

Severn Trent Water were proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:10.

Leicestershire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Eastfield Road

Leicestershire County Council are proposing to carry out Highway improvement works on Eastfield Road, Thurmaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Eastfield Road

Leicestershire County Council are proposing to carry out Highway improvement works on Eastfield Road, Thurmaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Nov 2024 at 09:36.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:24.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 08:09.

Electricity Network Company logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Rothley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:33.

Electricity Network Company logo
Between
7 and 21 Jan 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 21 January 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 24 Oct 2024 at 10:43.

Cadent Gas logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Follow
Hand Avenue

Cadent Gas are proposing to carry out Utility asset works on Hand Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:30.

Severn Trent Water logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Follow
Vulcan Road

Severn Trent Water are proposing to carry out Remedial works on Vulcan Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 13:11.

Severn Trent Water logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Follow
Vulcan Road

Severn Trent Water are proposing to carry out Remedial works on Vulcan Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 09:40.

Severn Trent Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Melbourne Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Melbourne Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 13:18.

Leicester City Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
St Martins

Leicester City Council are proposing to carry out Highway improvement works on St Martins, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 13 Nov 2024 at 10:10.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mere Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 10:25.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
St Austell Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Austell Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 14:43.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
St Austell Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Austell Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:21.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beaumanor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beaumanor Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 09:52.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beaumanor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beaumanor Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 13:05.

Severn Trent Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Regent Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Regent Road, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 12:05.

Severn Trent Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 07:36.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Narborough Road

Leicester City Council are proposing to carry out Highway improvement works on Narborough Road, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 7 Nov 2024 at 12:50.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Stuart Street

Leicester City Council are proposing to carry out Highway improvement works on Stuart Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 1 Nov 2024 at 09:45.

Leicester City Council logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Ashleigh Road

Leicester City Council are proposing to carry out Highway improvement works on Ashleigh Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicester City Council on 6 Nov 2024 at 11:45.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 12:18.

Cadent Gas logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Gate

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Church Gate, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:03.

Leicester City Council logo
LONG TERM
Between
20 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Humberstone Road

Leicester City Council are proposing to carry out Highway improvement works on Humberstone Road, Leicester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicester City Council on 7 Nov 2024 at 17:25.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Cobden Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cobden Street, Leicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 11:53.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Anstey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 14:36.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Church Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Church Lane, Anstey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 15:13.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Ratcliffe Road

Severn Trent Water were proposing to carry out Remedial works on Ratcliffe Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 09:18.

Leicester City Council logo
LONG TERM
Between
25 Jan and 5 May 2025
Details
View Map
Share
Follow
Duns Lane

Leicester City Council are proposing to carry out Highway improvement works on Duns Lane, Leicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leicester City Council on 24 Jul 2024 at 10:18.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Asfordby Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asfordby Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 13:13.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Shelbourne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shelbourne Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 14:51.

Severn Trent Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 12:39.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Speers Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Speers Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 09:34.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Speers Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Speers Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:52.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Barkby Road

Severn Trent Water are proposing to carry out Utility asset works on Barkby Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 10:48.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:46.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Sep 2024 at 14:36.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
The Ridings

Leicestershire County Council are proposing to carry out Highway improvement works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:46.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
The Ridings

Leicestershire County Council are proposing to carry out Highway improvement works on The Ridings, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Sep 2024 at 14:36.

Leicestershire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Oct 2024 at 16:30.

Electricity Network Company logo
LONG TERM
Between
2 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:22.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Romway Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Romway Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 09:21.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Romway Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Romway Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:38.

Severn Trent Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Bridge Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bridge Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 14:52.

Severn Trent Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Bridge Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bridge Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:21.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Laburnum Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Laburnum Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 14:44.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Laburnum Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Laburnum Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:26.

Electricity Network Company logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Barrow Road

Electricity Network Company are proposing to carry out Utility asset works on Barrow Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 14:47.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Granby Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Granby Avenue, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:03.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Clarence Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarence Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 13:11.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Cobden Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cobden Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 10:34.

Electricity Network Company logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:30.

Severn Trent Water logo
Between
11 and 25 Feb 2025
Details
View Map
Share
Follow
St Saviours Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Saviours Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 10:24.

Severn Trent Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Melbourne Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Melbourne Road, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 14:30.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Syston Road

Leicestershire County Council are proposing to carry out Highway improvement works on Syston Road, South Croxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Sep 2024 at 11:46.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Syston Road

Leicestershire County Council are proposing to carry out Highway improvement works on Syston Road, South Croxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Sep 2024 at 16:26.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Ridgemere Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgemere Lane, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Aug 2024 at 08:46.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Ridgemere Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgemere Lane, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Sep 2024 at 11:46.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Ridgemere Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ridgemere Lane, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Sep 2024 at 16:26.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Queniborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Queniborough Road, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Aug 2024 at 08:46.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Queniborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Queniborough Road, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Sep 2024 at 11:26.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Queniborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Queniborough Road, Queniborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Sep 2024 at 16:26.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Swithland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 08:07.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Cossington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 14:11.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 12:56.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are proposing to carry out New service connection on Loughborough Road, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 14:26.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Rutland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rutland Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 11:33.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Leicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:09.


Roadworks Map near to Brook Furlong Drive, LEICESTER, LE4 3LU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brook Furlong Drive, LEICESTER, LE4 3LU (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HALLAM FIELDS ROAD 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.1
Details
Share
Follow
2
Leicestershire County Council logo
LOUGHBOROUGH ROAD 
(0.1 miles)
Leicestershire County Council
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 22 Nov 2024 14:25
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.1
Details
Share
Follow
3
Leicestershire County Council logo
LOUGHBOROUGH ROAD 
(0.1 miles)
Leicestershire County Council
Highway improvement works - Footway, Verge - No carriageway incursion
In Progress
Since: 22 Nov 2024 14:25
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.1
Details
Share
Follow
4
Severn Trent Water logo
WORCESTER AVENUE 
(0.7 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.