ROADWORKS SUMMARY
Welford Road, LUTTERWORTH, LE17 6PT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Welford Road, LE17 6PT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Welford Road, LUTTERWORTH, LE17 6PT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Welford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (East Midlands) logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Foxton Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Foxton Road, Lubenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 14:00 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Nov 2024 at 14:31.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Foxton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 13:56.

Anglian Water logo
Finishing
Today
Details
View Map
Share
Follow
Westhorpe

Anglian Water are carrying out Utility repair and maintenance works on Westhorpe, Sibbertoft.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 10:01 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:09.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Old Hall Lane

Gigaclear are carrying out Utility asset works on Old Hall Lane, Lubenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:40 and could run through until 2 December 2024. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 09:41.

Gigaclear logo
Finishing
Friday
Details
View Map
Share
Follow
Old Hall Lane

Gigaclear are proposing to carry out Utility asset works on Old Hall Lane, Lubenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 24 Sep 2024 at 17:29.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Main Street

Anglian Water are carrying out Utility repair and maintenance works on Main Street, East Farndon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 01:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 01:00.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, East Farndon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 16 Sep 2024 at 14:47.

West Northamptonshire Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Church Street

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Church Street, Sibbertoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:26.

Western Power Distribution (East Midlands) logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Brook Street, Walcote, Misterton With Walcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Nov 2024 at 10:36.

Western Power Distribution (East Midlands) logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Brook Street, Walcote, Misterton With Walcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Oct 2024 at 16:16.

Anglian Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Clay Coton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Clay Coton Road, Stanford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 09:26.

Western Power Distribution (East Midlands) logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Brook Street, Walcote, Misterton With Walcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Nov 2024 at 13:56.

Western Power Distribution (East Midlands) logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Brook Street

Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Brook Street, Walcote, Misterton With Walcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Nov 2024 at 11:06.

Anglian Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Clay Coton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Clay Coton Road, Stanford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 30 Sep 2024 at 13:46.

West Northamptonshire Council logo
Between
10 and 14 Dec 2024
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:28.

West Northamptonshire Council logo
Between
10 and 14 Dec 2024
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:27.

Severn Trent Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
From Bunkers Hill To Long Close Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Bunkers Hill To Long Close Lane, Laughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 17:56.

Severn Trent Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
From Bunkers Hill To Long Close Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Bunkers Hill To Long Close Lane, Laughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 17:26.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
17 Dec 2024 and 24 Feb 2025
Details
View Map
Share
Foxton Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Foxton Road, Lubenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:06.

Leicestershire County Council logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Station Road

Leicestershire County Council are proposing to carry out Highway improvement works on Station Road, North Kilworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 16:07.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Foxton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:49.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Foxton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 14:36.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Lubenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:50.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Lubenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.

West Northamptonshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:29.

West Northamptonshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:30.

Leicestershire County Council logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
South Kilworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on South Kilworth Road, Walcote, Misterton With Walcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Nov 2024 at 14:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Harborough Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 10:36.

West Northamptonshire Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Kelmarsh Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kelmarsh Road, Clipston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Nov 2024 at 12:02.

Leicestershire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Welford Road

Leicestershire County Council are proposing to carry out Highway improvement works on Welford Road, South Kilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 26 Sep 2024 at 16:26.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
From Rugby Road To Swinford Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Rugby Road To Swinford Road, Westrill And Starmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Nov 2024 at 13:11.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
Harborough Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:51.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
Harborough Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.

West Northamptonshire Council logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 15:51.

West Northamptonshire Council logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 15:55.


Roadworks Map near to Welford Road, LUTTERWORTH, LE17 6PT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 08:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Welford Road, LUTTERWORTH, LE17 6PT (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.