ROADWORKS SUMMARY
Chapel Close, MELTON MOWBRAY, LE14 3HW
Introduction
View current and future planned roadworks and road closures for Chapel Close, LE14 3HW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Chapel Close, MELTON MOWBRAY, LE14 3HW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chapel Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E5, Melton Mowbray.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath F2, Waltham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath F4, Waltham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E17, Melton Mowbray.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 13 Feb 2023 at 13:36.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E1, Melton Mowbray.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
26 Mar 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E18, Melton Mowbray.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 26 March 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
8 May 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E25, Waltham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 8 May 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 13 Feb 2023 at 11:46.
23 May 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Lag Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 17 May 2023 at 08:46.
30 May 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Lag Lane, Thorpe Arnold, Waltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 19 May 2023 at 08:16.
13 Jun 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E25, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 6 Jun 2023 at 13:36.
13 Jun 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E25, Waltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 1 Jun 2023 at 11:26.
31 May 2025
Leicestershire County Council are carrying out Highway improvement works on Sawgate Road, Burton Lazars, Burton And Dalby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 July 2023 at 23:00 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 10 Jan 2024 at 14:46.
31 Oct 2025
Leicestershire County Council are carrying out Highway improvement works on Melton Spinney Road, Melton Mowbray.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 July 2023 at 23:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 8 Dec 2023 at 15:16.
31 Oct 2025
Leicestershire County Council are carrying out Highway improvement works on Scalford Road, Melton Mowbray.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 July 2023 at 23:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 8 Dec 2023 at 15:06.
31 Aug 2023 and 31 May 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath F3, Waltham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 31 August 2023 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 21 Feb 2023 at 08:46.
28 Jun 2024
Leicestershire County Council are carrying out Highway improvement works on Burton Road, Melton Mowbray.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 00:00 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Mar 2024 at 16:30.
8 Dec 2023 and 4 Dec 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath G69, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2023 and could run through until 4 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 13 Dec 2023 at 15:26.
Wednesday
Leicestershire County Council are carrying out Highway improvement works on Bridleway G46, Clawson Hose And Harby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 December 2023 at 00:00 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Apr 2024 at 16:56.
Thursday
Severn Trent Water are proposing to carry out Utility asset works on Burton Road, Melton Mowbray.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Apr 2024 at 15:06.
Monday
Severn Trent Water are carrying out Utility asset works on Nottingham Road, Melton Mowbray.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2024 at 10:30 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Apr 2024 at 10:36.
28 Jun 2024
Leicestershire County Council are carrying out Highway improvement works on Canal Lane, Hose, Clawson Hose And Harby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2024 at 23:00 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Apr 2024 at 16:26.
17 May 2024
Leicestershire County Council are carrying out Highway improvement works on Burton Road, Melton Mowbray.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 April 2024 at 23:00 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Apr 2024 at 14:36.
21 Apr and 10 May 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Redbrook Crescent, Melton Mowbray.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 16 Apr 2024 at 08:26.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Scalford Road, Melton Mowbray.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 14:23 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 14:25.
28 Apr and 5 May 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Freeby Lane, Waltham On The Wolds, Waltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Apr 2024 at 09:26.
28 Apr and 5 May 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Woodfold Lane, Freeby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Apr 2024 at 13:36.
29 Apr and 5 May 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Saxby Road, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2024 at 10:56.
Friday
Severn Trent Water are proposing to carry out New service connection on Welby Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 3 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 30 Jan 2024 at 09:15.
Friday
Severn Trent Water are proposing to carry out New service connection on Welby Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Feb 2024 at 10:17.
Friday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hose Lane, Clawson Hose And Harby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 5 Feb 2024 at 15:24.
1 May and 30 Sep 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath E1, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 16 Feb 2024 at 12:36.
6 and 9 May 2024
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Snow Hill, Melton Mowbray.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 11 Apr 2024 at 07:06.
13 and 17 May 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Debdale Hill, Old Dalby, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Mar 2024 at 12:06.
14 May and 3 Jun 2024
BT are proposing to carry out Utility asset works on Gorse Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Feb 2024 at 12:42.
14 May and 3 Jun 2024
BT are proposing to carry out Utility asset works on Potter Hill Nottingham Road, Melton Mowbray.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Feb 2024 at 12:45.
14 May and 3 Jun 2024
BT are proposing to carry out Utility asset works on Nottingham Road, Ab Kettleby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Feb 2024 at 12:44.
14 and 17 May 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Middle Lane, Nether Broughton, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Apr 2024 at 11:06.
20 and 22 May 2024
Severn Trent Water are proposing to carry out New service connection on Middle Lane, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 16 Feb 2024 at 08:41.
28 and 31 May 2024
Severn Trent Water are proposing to carry out New service connection on Welby Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Apr 2024 at 08:06.
29 and 31 May 2024
Severn Trent Water are proposing to carry out New service connection on Middle Lane, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Mar 2024 at 07:56.
9 and 14 Jun 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Station Lane, Asfordby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 22 Apr 2024 at 10:56.
9 and 14 Jun 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Asfordby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 22 Apr 2024 at 10:46.
9 and 14 Jun 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Station Lane, Kirby Bellars.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 22 Apr 2024 at 10:56.
9 and 14 Jun 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Asfordby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 22 Apr 2024 at 10:46.
17 and 19 Jun 2024
Severn Trent Water are proposing to carry out New service connection on Station Road, Upper Broughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Apr 2024 at 11:00.
18 Jun and 1 Jul 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Hose Lane, Harby, Clawson Hose And Harby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 23 Apr 2024 at 15:16.
18 Jun and 1 Jul 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Waltham Road, Eastwell, Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 22 Apr 2024 at 11:16.
19 Jun and 1 Jul 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Waltham Lane, Harby, Clawson Hose And Harby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 3 Apr 2024 at 16:46.
25 Jun and 12 Jul 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Landyke Lane, Scalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 26 Apr 2024 at 12:56.
1 Jul and 1 Sep 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Burton Road, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Apr 2024 at 08:06.
7 Jul and 26 Aug 2024
Severn Trent Water are proposing to carry out Utility asset works on Burton Road, Melton Mowbray.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 26 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Apr 2024 at 14:26.
12 Jul and 13 Sep 2024
Leicestershire County Council are proposing to carry out Highway improvement works on Scalford Road, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2024 and could run through until 13 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Apr 2024 at 08:06.
14 and 18 Jul 2024
Cadent Gas are proposing to carry out New service connection on Queensway, Old Dalby, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 14:03.
15 and 18 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Melton Mowbray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Apr 2024 at 11:29.
16 and 19 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Broughton And Old Dalby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2024 at 11:17.
21 Jul and 16 Aug 2024
Electricity Network Company are proposing to carry out Utility asset works on Crompton Road, Asfordby Hill, Asfordby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 16 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 26 Apr 2024 at 10:12.
21 Jul and 16 Aug 2024
Electricity Network Company are proposing to carry out Utility asset works on Stanton Road, Asfordby Hill, Asfordby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 26 Apr 2024 at 10:21.
22 and 24 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on School Lane, Scalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 08:30.
22 and 30 Jul 2024
Severn Trent Water are proposing to carry out Remedial works on Melton Road, Clawson Hose And Harby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Apr 2024 at 16:36.
22 and 24 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Green Lane, Hickling Pastures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 23 Apr 2024 at 14:52.
Roadworks Map near to Chapel Close, MELTON MOWBRAY, LE14 3HW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Chapel Close, MELTON MOWBRAY, LE14 3HW (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.